Michael Coleman
- Listed as
- authorized agent-others, contractor
- Firm
- Abbeyside Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
26 permits since 2000 (contractor on 26 permits, authorized agent-others on 1 permit): 14 completed, 9 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 270 Andover St | Abbeyside Construction Inc | revision pa 202604219759 structural strenthening & rear pop-out foundation & lower framing, 3rd fl & attic reinforcingDetails
revision pa 202604219759 structural strenthening & rear pop-out foundation & lower framing, 3rd fl & attic reinforcing | $6,000 |
| May 7, 2026 | In progress issued Sep 2026 | 657 Arguello Bl | Abbeyside Construction Inc | horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths.Details
horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths. | $400,000 |
| May 5, 2026 | In progress issued May 2026 | 270 Andover St | Abbeyside Construction Inc | remove (e) 2nd floor bathroom and convert it into 2 bathroomsDetails
remove (e) 2nd floor bathroom and convert it into 2 bathrooms | $45,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 270 Andover St | Abbeyside Construction Inc | voluntary structural strengthening of 1st floor.Details
voluntary structural strengthening of 1st floor. | $22,000 |
| Feb 25, 2026 | Completed final sign-off Mar 2026 | 242 Ripley St | Abbeyside Construction Inc | revision to pa 202602035113 (e) balcony is 3' setback from west property line. fire wall not requiredDetails
revision to pa 202602035113 (e) balcony is 3' setback from west property line. fire wall not required | |
| Feb 3, 2026 | In progress issued Feb 2026 | 242 Ripley St | Abbeyside Construction Inc | rebuild (e) wood frame balcony on 2nd and 3rd floor. convert (e) cantilever balcony to be supported by posts below add 1 hour fire rated wall on property lineDetails
rebuild (e) wood frame balcony on 2nd and 3rd floor. convert (e) cantilever balcony to be supported by posts below add 1 hour fire rated wall on property line | $16,000 |
| Dec 30, 2025 | In progress issued Aug 2026 | 452 Fair Oaks St | Abbeyside Construction Inc | rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard....Details
rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard.... | |
| Dec 5, 2025 | In progress issued Dec 2025 | 452 Fair Oaks St | Abbeyside Construction Inc | install temporary shoring to support existing building facade above and perform excavation sequencing below at locations shown on sh2.0 to allow excavation for residential remodel and addition. ref 202504174627Details
install temporary shoring to support existing building facade above and perform excavation sequencing below at locations shown on sh2.0 to allow excavation for residential remodel and addition. ref 202504174627 | $15,000 |
| Sep 23, 2025 | Completed final sign-off Mar 2026 | 1731 32nd Av | Abbeyside Construction Inc | add (n) deck in rear yard. enclose entry vestiblue and add (n) front door entryDetails
add (n) deck in rear yard. enclose entry vestiblue and add (n) front door entry | $7,100 |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 1731 32nd Av | Abbeyside Construction Inc | reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter.Details
reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter. | $38,000 |
| Jul 3, 2025 | Completed final sign-off Nov 2025 | 1243 Douglass St | Abbeyside Construction Inc | replace existing 2 level rear deck; replace 2 windows with 2 doorsDetails
replace existing 2 level rear deck; replace 2 windows with 2 doors | $27,850 |
| May 21, 2025 | Completed final sign-off Nov 2025 | 1243 Douglass St | Abbeyside Construction Inc | remodel (e) 5' x 7'2" bathroom. replace in kind.Details
remodel (e) 5' x 7'2" bathroom. replace in kind. | $15,000 |
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | Abbeyside Construction Inc, Ace Drilling & Excavation | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Feb 5, 2025 | Completed final sign-off Jun 2025 | 20 Ardenwood Wy | Abbeyside Construction Inc | kitchen and bathroom remodel and add 1/2 bathroomDetails
kitchen and bathroom remodel and add 1/2 bathroom | $85,000 |
| Nov 5, 2024 | In progress issued Nov 2024 | 452 Fair Oaks St | Abbeyside Construction Inc | remove and replace gypsum board/sheet rock for exploratory demo. in kind replacement.Details
remove and replace gypsum board/sheet rock for exploratory demo. in kind replacement. | $2,000 |
| May 27, 2022 | Completed final sign-off Jan 2023 | 115 Pacheco St | Abbeyside Construction Inc | temporay shoring to complete the foundation.Details
temporay shoring to complete the foundation. | $20,000 |
| May 12, 2022 | Completed final sign-off Jul 2022 | 2644 Clement St | Abbeyside Construction Inc | replace 4 windows in-kind wood clad due to leaky window with mold appearing on the inside. these will be clad wood windows, and repair any dryrot due to the leaks and re stucco. visible from st.Details
replace 4 windows in-kind wood clad due to leaky window with mold appearing on the inside. these will be clad wood windows, and repair any dryrot due to the leaks and re stucco. visible from st. | $30,000 |
| Nov 18, 2021 | Completed final sign-off Jun 2022 | 127 Leroy Pl | Abbeyside Construction Inc | replace kitchen and bathroom in each unit with new cabinets and fixutres and upgrade the elecrical and plumbing in these areas. no moving walls. in kind of existing.Details
replace kitchen and bathroom in each unit with new cabinets and fixutres and upgrade the elecrical and plumbing in these areas. no moving walls. in kind of existing. | $135,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2021 | 2018 Webster St | Abbeyside Construction Inc | to obtain final inspection for work approved under pa# 201409156303, 201708013484, 201712277459. all work is completed.Details
to obtain final inspection for work approved under pa# 201409156303, 201708013484, 201712277459. all work is completed. | |
| Oct 30, 2020 | Completed final sign-off Oct 2021 | 2018 Webster St | Abbeyside Construction Inc | rev to pa201409156303 to address field changes as requested by field inspectionDetails
rev to pa201409156303 to address field changes as requested by field inspection | |
| Jan 14, 2020 | Completed final sign-off Oct 2021 | 2018 Webster St | Abbeyside Construction Inc | a revision 201708013484 for correction notice to repair the front of building per cebc 1405.2. remove rerim and siding and apply new flashing and framing. all finish work to be completed in like kindDetails
a revision 201708013484 for correction notice to repair the front of building per cebc 1405.2. remove rerim and siding and apply new flashing and framing. all finish work to be completed in like kind | $60,000 |
| Sep 19, 2019 | Completed final sign-off Nov 2023 | 115 Pacheco St | Lung Fung Const & Elec Co, Abbeyside Construction Inc | remodel & expansion of (e) sfh including new horizontal addition to rear, interior remodel. barrier removal for univeral access, facade work & restoration, structural upgrade as required. no new additional rooms.Details
remodel & expansion of (e) sfh including new horizontal addition to rear, interior remodel. barrier removal for univeral access, facade work & restoration, structural upgrade as required. no new additional rooms. | $750,000 |
| Dec 27, 2017 | Expired or cancelled expired Oct 2021 | 2018 Webster St | Abbeyside Construction Inc | revision to 201409156303 & 201705317983 adding roof deck finish material including glass railing & wood deckingDetails
revision to 201409156303 & 201705317983 adding roof deck finish material including glass railing & wood decking | $5,000 |
| Aug 1, 2017 | Expired or cancelled expired Oct 2021 | 2018 Webster St | Evra Construction, Abbeyside Construction Inc | temporary shoring for approved remodel and addition per app#201409156303Details
temporary shoring for approved remodel and addition per app#201409156303 | $75,000 |
| May 31, 2017 | Completed final sign-off Oct 2021 | 2018 Webster St | Evra Construction, Abbeyside Construction Inc, Strong Builders Construction Inc. | revision to 201409156303 extension into rear yard on first floor with minor layout changes. new structural drawings. added 200 sfDetails
revision to 201409156303 extension into rear yard on first floor with minor layout changes. new structural drawings. added 200 sf | $5,000 |
| Sep 15, 2014 | Expired or cancelled expired Oct 2021 | 2018 Webster St | Evra Construction, Abbeyside Construction Inc, Upcycle Builders Inc., Strong Builders Construction Inc. | renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen.Details
renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen. | $750,000 |