Matthew Frantz
- Listed as
- engineer
- Firm
- Zfa Strutural Engineers
- Based in
- San Carlos
- On San Francisco permits
- Mar 2019 to Apr 2025
9 permits since 2000 (engineer on 9 permits): 3 completed, 2 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 11, 2025 | Completed final sign-off Jul 2026 | 2350 Turk Bl | Cahill Contractors Llc. | renovation of (e) theater includng installation of new cat- walk over (e) stageDetails
renovation of (e) theater includng installation of new cat- walk over (e) stage | $950,000 |
| Apr 8, 2024 | In progress filed Apr 2024, not yet issued | 270 Masonic Av | Plant Construction Co, Lp | mandatory seismic retrofit of existing building per sfbc section 503.11.1. to allow for future non structural alternations including partitions, ceilings, and mep upgrades for more than two thirds of the building. (e) bldg is currently unoccupied.Details
mandatory seismic retrofit of existing building per sfbc section 503.11.1. to allow for future non structural alternations including partitions, ceilings, and mep upgrades for more than two thirds of the building. (e) bldg is currently unoccupied. | $4,128,602 |
| Dec 5, 2023 | In progress issued Dec 2023 | 270 Masonic Av | Plant Construction Co, Lp | the structural scope is an addition to the parking deck rehabilitation permit under 202309196898Details
the structural scope is an addition to the parking deck rehabilitation permit under 202309196898 | |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 8 Locksley Av | conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave.Details
conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave. | $40,000 | |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 6 Locksley Av | conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance.Details
conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance. | $200,000 | |
| Jul 12, 2021 | Completed final sign-off Sep 2021 | 2180 Harrison St | Turner Construction Co | t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.Details
t.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system. | $195,000 |
| May 20, 2021 | Never finaled issued Jun 2021, no final | 27 Chabot Tr | Ronan O'dea Inc Dba O'dea Ronan Inc | repairs and voluntary retrofit to an (e) three story, wood framed, multi-fm dwelling. sheathing of wood shear walls addition ofan ordinary moment frame and the addiion of footsing to support shear walls and moment frame. releveling floor framing in front of building and replacing existing finishes.Details
repairs and voluntary retrofit to an (e) three story, wood framed, multi-fm dwelling. sheathing of wood shear walls addition ofan ordinary moment frame and the addiion of footsing to support shear walls and moment frame. releveling floor framing in front of building and replacing existing finishes. | $75,000 |
| Jul 16, 2020 | Completed final sign-off Jul 2023 | 50 Thomas More Wy | installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework.Details
installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework. | $150,000 | |
| Mar 28, 2019 | Never finaled issued Aug 2019, no final | 415 27th St | Jjj & K Inc./Dba: Alexander Company | replace (1) window & (1) patio door-visible with alarmwood clad (marvin) window window cut down slightly for egress (see #201703091079)Details
replace (1) window & (1) patio door-visible with alarmwood clad (marvin) window window cut down slightly for egress (see #201703091079) | $6,000 |