Lusheng Liu
- Listed as
- contractor, subcontractor
- Firm
- Ibs Usa Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Feb 2024
20 permits since 2000 (contractor on 19 permits, subcontractor on 1 permit): 12 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2024 | Completed final sign-off Mar 2024 | 1306 California St | Ibs Usa Inc. | renew for final 201801108342, 202008182023. all work is complete.Details
renew for final 201801108342, 202008182023. all work is complete. | |
| Aug 17, 2023 | Completed final sign-off Oct 2023 | 3643 Folsom St | Ibs Usa Inc. | to obtain final inspection for work approved under pa# 202108096034 202112285108 & 202112134264.Details
to obtain final inspection for work approved under pa# 202108096034 202112285108 & 202112134264. | |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 1306 California St | Ibs Usa Inc. | units 2/3/6: remodel (e) (3) bath & (3) kitchen, in-kind. non structural all work in kind.Details
units 2/3/6: remodel (e) (3) bath & (3) kitchen, in-kind. non structural all work in kind. | $30,000 |
| Dec 28, 2021 | Never finaled issued Jan 2022, no final | 3643 Folsom St | Ibs Usa Inc. | revision to 2021 1213 4264: in 1st fl replace 1 front window and door with 2 windows in-kind. in lower fl change rear casement window and folding door to s sliding door.Details
revision to 2021 1213 4264: in 1st fl replace 1 front window and door with 2 windows in-kind. in lower fl change rear casement window and folding door to s sliding door. | $2,000 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 3643 Folsom St | Ibs Usa Inc. | revison to pa#202108096034. change family room to a bedroom, add a bathroom, revise master bathroom. relocate living room, add a island counter to kitchen, add a media room and an exercise room in lower floor.Details
revison to pa#202108096034. change family room to a bedroom, add a bathroom, revise master bathroom. relocate living room, add a island counter to kitchen, add a media room and an exercise room in lower floor. | $60,000 |
| Aug 9, 2021 | Never finaled issued Aug 2021, no final | 3643 Folsom St | Ibs Usa Inc. | construct internal stair from 2nd f. to gr fl and reconstruct stair from gr fl to lower fl. remodel bedroom and bath on gr flDetails
construct internal stair from 2nd f. to gr fl and reconstruct stair from gr fl to lower fl. remodel bedroom and bath on gr fl | $5,000 |
| Jun 8, 2021 | Completed final sign-off Jun 2022 | 71 Molimo Dr | Ibs Usa Inc. | replace damaged concrete retaining wall in kind at rear of property, approximately 26' in total length.Details
replace damaged concrete retaining wall in kind at rear of property, approximately 26' in total length. | $30,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2023 | 71 Molimo Dr | Ibs Usa Inc., Barahona Brothers Construction Inc. | demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard.Details
demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard. | $25,000 |
| Jan 13, 2021 | Completed final sign-off Mar 2021 | 1824 Santiago St | Ibs Usa Inc. | remove settled exterior wall foundation 17ft and build new foundation to replace it.Details
remove settled exterior wall foundation 17ft and build new foundation to replace it. | $20,000 |
| Aug 18, 2020 | Expired or cancelled expired Apr 2024 | 1306 California St | Ibs Usa Inc. | rev to pa201801108342 - revision to design to match adu floor plan ( move shearwalls and foundation.Details
rev to pa201801108342 - revision to design to match adu floor plan ( move shearwalls and foundation. | $5,000 |
| Jan 7, 2019 | Never finaled issued Feb 2020, no final | 1306 California St | Hbm Construction Inc, Ibs Usa Inc. | addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellingsDetails
addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellings | $85,300 |
| Jan 10, 2018 | Expired or cancelled expired Apr 2024 | 1306 California St | Ibs Usa Inc. | mandatory soft story retrofit per 2016 sfebc appendix a-4. add ply shear walls and simpson strong walls with foundationsDetails
mandatory soft story retrofit per 2016 sfebc appendix a-4. add ply shear walls and simpson strong walls with foundations | $75,000 |
| Jun 27, 2017 | Completed final sign-off Apr 2018 | 1801 Taraval St | Ibs Usa Inc. | soft story retrofit per sfebc chapter 4d, fema p-807. work at g/f only.Details
soft story retrofit per sfebc chapter 4d, fema p-807. work at g/f only. | $55,000 |
| Dec 22, 2016 | Completed final sign-off Aug 2017 | 1341 Grove St | Ibs Usa Inc. | soft story retrofit per sfbc chapter 34b in accordance with 2012 iebc appx a4Details
soft story retrofit per sfbc chapter 34b in accordance with 2012 iebc appx a4 | $100,000 |
| Dec 15, 2016 | In progress issued Sep 2024 | 25 Midcrest Wy | fill empty space at lower floor a 249 sf of living space added. vertical addition with 3 bedrooms & 2 bath, remodel main floor, convert two bedrooms & kitchen to family and kitchen remodel bathroom too.Details
fill empty space at lower floor a 249 sf of living space added. vertical addition with 3 bedrooms & 2 bath, remodel main floor, convert two bedrooms & kitchen to family and kitchen remodel bathroom too. | $250,000 | |
| Dec 9, 2014 | Completed final sign-off Nov 2015 | 1810 Bush St | Ibs Usa Inc. | work at ground floor only. perform seismic upgrade as required by sf soft story mandatory retrofit program, per fema-p807. replace (e) brick foundation along building perimeter w/reinforced concrete.Details
work at ground floor only. perform seismic upgrade as required by sf soft story mandatory retrofit program, per fema-p807. replace (e) brick foundation along building perimeter w/reinforced concrete. | $32,000 |
| Mar 24, 2014 | Completed final sign-off Sep 2014 | 1331 43rd Av | Ibs Usa Inc. | revision to 201401065677. gr fl only, convert originally proposed 1/2 bath to full bathDetails
revision to 201401065677. gr fl only, convert originally proposed 1/2 bath to full bath | $3,500 |
| Jan 7, 2014 | Completed final sign-off Mar 2014 | 1375 Green St | Ibs Usa Inc. | enlarge (e) continuous brick footing w/reinforced concrete at northwest perimeter wall. perform dryrot repair at (e) stud walls & sill plates.Details
enlarge (e) continuous brick footing w/reinforced concrete at northwest perimeter wall. perform dryrot repair at (e) stud walls & sill plates. | $5,000 |
| Nov 4, 2009 | Completed final sign-off Mar 2013 | 2555 Judah St | Ibs Usa Inc. | new restaurant, all equipment, walls, counter, sinks, hood exhaust, plumbing, electrical. t.i approved under pa#200412091097.Details
new restaurant, all equipment, walls, counter, sinks, hood exhaust, plumbing, electrical. t.i approved under pa#200412091097. | $50,000 |
| Jun 2, 2005 | Completed final sign-off Aug 2007 | 2562 47th Av | Ibs Usa Inc. | remodel first floor and eliminated light well on south side of existing bilding.Details
remodel first floor and eliminated light well on south side of existing bilding. | $12,000 |