Lindsay M Marion
- Listed as
- engineer
- Firm
- Flack + Lirtz
- Based in
- Sf
- On San Francisco permits
- Dec 2012 to Oct 2025
16 permits since 2000 (engineer on 16 permits): 8 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2025 | In progress issued Dec 2025 | 560 Mission St | Gci, Inc | revision to 202501027602.smoke control zones to combine 1st & 2nd floors due to new opening @ 2nd fl level.updates to fsd schedule due to field verified information.added smoke control matrices.Details
revision to 202501027602.smoke control zones to combine 1st & 2nd floors due to new opening @ 2nd fl level.updates to fsd schedule due to field verified information.added smoke control matrices. | |
| Jul 10, 2025 | In progress issued Sep 2025 | 560 Mission St | Gci, Inc | revision to pa #2025-0102-7602 to document various field/construction changes, general detailing and clarification per rfi responses at ground floor cafe, back of house area and 2nd level.Details
revision to pa #2025-0102-7602 to document various field/construction changes, general detailing and clarification per rfi responses at ground floor cafe, back of house area and 2nd level. | $14,000 |
| Jul 3, 2025 | Completed final sign-off Feb 2026 | 345 California St | Skyline Construction | 8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures.Details
8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures. | $120,000 |
| Apr 25, 2025 | Completed final sign-off Nov 2025 | 560 Mission St | Bcci Construction Company | 3rd fl- arch and mep for construction of temp print and mail roomDetails
3rd fl- arch and mep for construction of temp print and mail room | $60,000 |
| Sep 25, 2024 | Completed final sign-off Jan 2026 | 50 California St | Skyline Construction | 35/fl-ref 202406265293 - office ti for finishes, walls, and floors to include mep work includes ductwork, lighting, power receptacles. mep deferred submitialDetails
35/fl-ref 202406265293 - office ti for finishes, walls, and floors to include mep work includes ductwork, lighting, power receptacles. mep deferred submitial | $1,000,000 |
| Aug 8, 2024 | In progress issued Aug 2024 | 415 Mission St | Bcci Construction Company | 34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324.Details
34th floor: modification to existing mechanical and electrical. relocate ducts and modify lightin. ref pa#202401023324. | $45,000 |
| Jul 30, 2024 | Completed final sign-off Jun 2025 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.Details
renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac. | $218,191 |
| Jul 25, 2024 | Completed final sign-off Jan 2026 | 50 California St | Skyline Construction | 36th/flr -ref ti 202405222693- mep work for office tiDetails
36th/flr -ref ti 202405222693- mep work for office ti | $1,000,000 |
| Jan 2, 2024 | In progress issued Jan 2024 | 415 Mission St | Bcci Construction Company | 34/f: mep submittal to support approved architectural permit # 202310118444Details
34/f: mep submittal to support approved architectural permit # 202310118444 | $100,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736.Details
33/f, 34/f & 35/f: final conditions permit noting changes in smoke control as result of the (e) convenience stair being removed from l32-l33 and l33 slab infill uner pa# 202306230736. | $200,000 |
| Sep 15, 2023 | Never finaled issued Sep 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33.Details
31/f & 32/f: minor ti demo and patch work, noting changes to smoke control as a result of the removal of stairs on l32 and l33. | $200,000 |
| Jun 23, 2023 | Never finaled issued Jul 2023, no final | 415 Mission St | Bcci Construction Company | 31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included.Details
31/f & 32/f: demo only of (e) convenience stair. 31/f & 32/f to remain unoccupied. convenience stairs @ levels 33, 34 & 35 to remain. new structural infill of stair opening on 32nd and 33rd floor. mechanical page included. | $200,000 |
| Oct 13, 2022 | Completed final sign-off Dec 2023 | 150 California St | Gci, Inc | 20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.Details
20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices. | $920,000 |
| Aug 30, 2021 | Expired or cancelled cancelled Jan 2026 | 199 Fremont St | Skyline Construction | flrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def.Details
flrs 11,12,15,16,18: buildout of new janitor closets, as req'd to bring current breakrooms up to health code. flrs 8,11,12,15,16,17,18: new water heaters proposed beneath (e) sinks. flrs 8,11,12,16,17,18: convert (e) storage rooms to break room storage. ref pa 201612144897.fire alarm/sprinklers def. | $155,000 |
| Dec 18, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | 1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i.Details
1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i. | |
| Dec 12, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | basement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit.Details
basement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit. |