Lillian Mitchell
- Listed as
- architect
- Firm
- Mitchell Holladay Architects
- On San Francisco permits
- Apr 2005 to Jul 2023
6 permits since 2000 (architect on 6 permits): 5 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2023 | Never finaled issued Aug 2023, no final | 45 Cleary Ct | unit #1 - 1st flr: update elec subpanel. add recessed lights to entire unit. update bathrooms & kitchen with new tile, cabinets, tub & appliances. expand closet in main bedroom & rearrange main bathroom layout. add cabinets to laundry room & new machines. change balcony door from sliding to folding.Details
unit #1 - 1st flr: update elec subpanel. add recessed lights to entire unit. update bathrooms & kitchen with new tile, cabinets, tub & appliances. expand closet in main bedroom & rearrange main bathroom layout. add cabinets to laundry room & new machines. change balcony door from sliding to folding. | $80,000 | |
| Mar 1, 2019 | Completed final sign-off Jan 2020 | 552 Douglass St | H T H Construction | add (n) master bedrm to rear at 3rd flr, interior renovations to create (n) bathroom & closets, replace (e) living rm windows within (e) openings (same site & operation); fill in corner at (e) deck at 2nd flr lvl & replace guardrail at (n) & (e) deck.Details
add (n) master bedrm to rear at 3rd flr, interior renovations to create (n) bathroom & closets, replace (e) living rm windows within (e) openings (same site & operation); fill in corner at (e) deck at 2nd flr lvl & replace guardrail at (n) & (e) deck. | $100,000 |
| Dec 13, 2018 | Completed final sign-off Jan 2020 | 552 Douglass St | H T H Construction | interior renovation to ground floor unit, includes new windows and door at rear. replace extg interior stair to upper unit, renovate kitchen at upper unit with new windows & door at rear. replacement of 2 front doors in kind. partial replacement of (e)rear property line foundation.Details
interior renovation to ground floor unit, includes new windows and door at rear. replace extg interior stair to upper unit, renovate kitchen at upper unit with new windows & door at rear. replacement of 2 front doors in kind. partial replacement of (e)rear property line foundation. | $300,000 |
| Nov 14, 2018 | Completed final sign-off Apr 2021 | 4254 24th St | Urbnbuild Inc | administrative permit only: alter site to correct building story count information in reference to site permit 201802010134. old information was 2 to 4 stories, to be corrected to show 1 to 3 stories. maher n/a.Details
administrative permit only: alter site to correct building story count information in reference to site permit 201802010134. old information was 2 to 4 stories, to be corrected to show 1 to 3 stories. maher n/a. | |
| Feb 1, 2018 | Completed final sign-off Apr 2021 | 4254 24th St | Jln Builders, Urbnbuild Inc | interior renovations to (e) basement & 1st flr levels with bay additions @ front @ both (e) flr levels; new 2nd flr addition & new attic level addition. widen (e) garage door, reconfigure (e) front exterior steps.Details
interior renovations to (e) basement & 1st flr levels with bay additions @ front @ both (e) flr levels; new 2nd flr addition & new attic level addition. widen (e) garage door, reconfigure (e) front exterior steps. | $700,000 |
| Apr 8, 2005 | Completed final sign-off Feb 2006 | 4254 24th St | removal of (e) kitchen cabenitry to be replaced w/ (n) kitchen cabinetry, (n) built in cabinetry inDetails
removal of (e) kitchen cabenitry to be replaced w/ (n) kitchen cabinetry, (n) built in cabinetry in | $20,000 |