Leonard Sequeoria
- Listed as
- contractor, engineer
- Firm
- T R C Solutions Inc.
- Based in
- Irvine
- On San Francisco permits
- Sep 2005 to May 2017
7 permits since 2000 (contractor on 6 permits, engineer on 1 permit): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 3, 2017 | Completed final sign-off Oct 2017 | 1201 Illinois St | T R C Solutions Inc. | disconnect and remove approx 1350 lf of above ground fire suppression piping at a former power plant (retired 2011). piping to be removed to facilitate access to 3 aboue ground storage tanks (being demo'd 2017-0317-1790. upstream piping to remain pressured; downstream piping to be converted to dryDetails
disconnect and remove approx 1350 lf of above ground fire suppression piping at a former power plant (retired 2011). piping to be removed to facilitate access to 3 aboue ground storage tanks (being demo'd 2017-0317-1790. upstream piping to remain pressured; downstream piping to be converted to dry | $15,000 |
| Feb 7, 2017 | Completed final sign-off Oct 2017 | 1201 Illinois St | T R C Solutions Inc. | install access points in three above ground storage tanks and associated secondary containment walls to facilitate tank cleaning. maher naDetails
install access points in three above ground storage tanks and associated secondary containment walls to facilitate tank cleaning. maher na | $38,000 |
| Sep 28, 2009 | Completed final sign-off Aug 2015 | 1000 Evans Av | T R C Solutions Inc. | install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth.Details
install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth. | $123,938 |
| Sep 4, 2008 | Completed final sign-off Aug 2015 | 1000 Evans Av | T R C Solutions Inc. | revision to application 200512150545 to change demolition procedures.Details
revision to application 200512150545 to change demolition procedures. | $100,000 |
| Jun 5, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | T R C Solutions Inc. | revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4.Details
revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4. | $51,000 |
| May 22, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | T R C Solutions Inc. | felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461.Details
felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461. | $51,000 |
| Sep 28, 2005 | Expired or cancelled expired Mar 2009 | 2829 24th St | install soil vapor extraction & ozone sparge system.work includes trenching to install process piping,well installation,installation of concrete pad and interconnection of remediation equipment.Details
install soil vapor extraction & ozone sparge system.work includes trenching to install process piping,well installation,installation of concrete pad and interconnection of remediation equipment. | $325,000 |