T R C Solutions Inc.
- Based in
- Irvine
- On San Francisco permits
- May 2008 to May 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2017 | Completed final sign-off Oct 2017 | 1201 Illinois St | disconnect and remove approx 1350 lf of above ground fire suppression piping at a former power plant (retired 2011). piping to be removed to facilitate access to 3 aboue ground storage tanks (being demo'd 2017-0317-1790. upstream piping to remain pressured; downstream piping to be converted to dryDetails
disconnect and remove approx 1350 lf of above ground fire suppression piping at a former power plant (retired 2011). piping to be removed to facilitate access to 3 aboue ground storage tanks (being demo'd 2017-0317-1790. upstream piping to remain pressured; downstream piping to be converted to dry | $15,000 |
| Feb 7, 2017 | Completed final sign-off Oct 2017 | 1201 Illinois St | install access points in three above ground storage tanks and associated secondary containment walls to facilitate tank cleaning. maher naDetails
install access points in three above ground storage tanks and associated secondary containment walls to facilitate tank cleaning. maher na | $38,000 |
| Sep 28, 2009 | Completed final sign-off Aug 2015 | 1000 Evans Av | install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth.Details
install 3 recovery trenshes, total of 425 linear ft. 3 ft wide with vertical sidewalls each trench. 2 skimmer pumps installed in each collection trench, total 6 pumps. 5 risers each trench, risers will terminate in a sump. total depth of sump approx 2 ft below bottom of trench depth. | $123,938 |
| Sep 4, 2008 | Completed final sign-off Aug 2015 | 1000 Evans Av | revision to application 200512150545 to change demolition procedures.Details
revision to application 200512150545 to change demolition procedures. | $100,000 |
| Jun 5, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4.Details
revision to 200512150446 for change in demolition procedure for felling of boilers 3 and 4. | $51,000 |
| May 22, 2008 | Completed final sign-off Sep 2015 | 1000 Evans Av | felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461.Details
felling of boilers 3 and 4 per submittal dated 05-22-2008. revision to pa # 200512150461. | $51,000 |