Lei Zheng
- Listed as
- architect, designer, engineer, pmt consultant/expediter
- Firm
- Cecilia Home
- Based in
- Concord
- On San Francisco permits
- Apr 2021 to Sep 2026
40 permits since 2000 (engineer on 34 permits, architect on 5 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 19 completed, 10 in progress, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 822 Moultrie St | 1st floor seismic reinforcement, voluntary seismic retrofit at 1st floor per plan.Details
1st floor seismic reinforcement, voluntary seismic retrofit at 1st floor per plan. | $38,000 | |
| Jun 25, 2026 | In progress issued Aug 2026 | 2646 Great Hy | revision to permit 202411134905. revise (e) ceiling height from 8' to 7'6" on sheet a0.14 revise (p) bedroom door from 7'4" to 6'10" on sheet a0.14. relocate (p) furnace room door from hallway to storage on sheet a0.12Details
revision to permit 202411134905. revise (e) ceiling height from 8' to 7'6" on sheet a0.14 revise (p) bedroom door from 7'4" to 6'10" on sheet a0.14. relocate (p) furnace room door from hallway to storage on sheet a0.12 | ||
| Apr 13, 2026 | In progress filed Apr 2026, not yet issued | 1012 Geneva Av | A Tamam Construction Inc. | legalization of an existing 577 sq. ft. first-floor area located beneath the existing second-floor overhang, consisting of one bedroom, one bathroom, and one storage roomDetails
legalization of an existing 577 sq. ft. first-floor area located beneath the existing second-floor overhang, consisting of one bedroom, one bathroom, and one storage room | $35,000 |
| Mar 10, 2025 | In progress issued Jul 2025 | 1875 Geneva Av | A Tamam Construction Inc. | remove 650 sf of unpermitted construction,remove 281 sf unpermitted patio, add a new hallway to access the new adu,add a new 500 sf attached adu with one toilet and two bedroomsDetails
remove 650 sf of unpermitted construction,remove 281 sf unpermitted patio, add a new hallway to access the new adu,add a new 500 sf attached adu with one toilet and two bedrooms | $120,000 |
| Feb 13, 2025 | Completed final sign-off Aug 2025 | 1439 Egbert Av | Mr Handyman | unit c -convert light manufacturing to pet kennel, no expansion or exterior change. (e) mechanical, plumbing no change and add area exhaust fan.Details
unit c -convert light manufacturing to pet kennel, no expansion or exterior change. (e) mechanical, plumbing no change and add area exhaust fan. | |
| Jan 31, 2025 | In progress issued Feb 2025 | 45 Montcalm St | revision to pa# 2022-0405-1623: to modify driveway retaining wall and document as-built condition where soil pile logging system was not used; rehabilitate (e) structure footing per detail 2/s1; modify fence base connection detail 1/s1Details
revision to pa# 2022-0405-1623: to modify driveway retaining wall and document as-built condition where soil pile logging system was not used; rehabilitate (e) structure footing per detail 2/s1; modify fence base connection detail 1/s1 | ||
| Jan 2, 2025 | In progress issued Aug 2025 | 2646 Great Hy | Ionian Builders Llc | conversion of open space @ 1/f to a 180sf bedroom and bathroom. remodeling of 135sf kitchen @ 2/f. remodeling of a 57sf bathroom @ 2/f. replace the 2 existing water heaters into a tankless water heaters and relocate to laundry area. add wall and door between the laundry area and garage @ 1/f.Details
conversion of open space @ 1/f to a 180sf bedroom and bathroom. remodeling of 135sf kitchen @ 2/f. remodeling of a 57sf bathroom @ 2/f. replace the 2 existing water heaters into a tankless water heaters and relocate to laundry area. add wall and door between the laundry area and garage @ 1/f. | $145,000 |
| Nov 4, 2024 | In progress filed Nov 2024, not yet issued | 6 Richards Cr | new 1000 sf rear detached adu (2-story all electric), 1-kitchen, 2-bedrooms, 2-bathrooms, type v-b.Details
new 1000 sf rear detached adu (2-story all electric), 1-kitchen, 2-bedrooms, 2-bathrooms, type v-b. | $150,000 | |
| Oct 22, 2024 | In progress filed Oct 2024, not yet issued | 1325 Church St | g/f: convert the (e) housekeeping unit into an official unit.Details
g/f: convert the (e) housekeeping unit into an official unit. | ||
| Oct 21, 2024 | Completed final sign-off Jan 2025 | 1360 Goettingen St | Lombera Construction Inc | this is a revesion to permit#2024-0802-7813 with additional post according to plans. replace fense post were needed.Details
this is a revesion to permit#2024-0802-7813 with additional post according to plans. replace fense post were needed. | |
| Oct 16, 2024 | In progress issued Nov 2024 | 1959 Pine St | Dynamicz Construction Inc | convert a half bathroom into a full bathroom.Details
convert a half bathroom into a full bathroom. | $30,000 |
| Sep 24, 2024 | Expired or cancelled expired Feb 2026 | 1050 Girard St | to comply with nov #202315687. legalize a 12' x 8.33' (100sf) 8' height shed (for storage use only) constructed in the backyard, 4-foot tall (maximum) retaining/foundation walls, and a on-grade, concrete patio surrounding the shed.Details
to comply with nov #202315687. legalize a 12' x 8.33' (100sf) 8' height shed (for storage use only) constructed in the backyard, 4-foot tall (maximum) retaining/foundation walls, and a on-grade, concrete patio surrounding the shed. | $2,000 | |
| Aug 2, 2024 | Completed final sign-off Jan 2025 | 1360 Goettingen St | Lombera Construction Inc | the railings for the deck will be replaced to meet city codes. the (e) deck boards will be replaced as needed. a 60 foot stretch of > 6' high fence will be replaced. part of the fence is adjacent to deck and is over 6 feet tall.Details
the railings for the deck will be replaced to meet city codes. the (e) deck boards will be replaced as needed. a 60 foot stretch of > 6' high fence will be replaced. part of the fence is adjacent to deck and is over 6 feet tall. | $8,500 |
| Jun 17, 2024 | Completed final sign-off Feb 2025 | 541 Diamond St | Egoodat Inc | add a new 185sf deck on the garage and add 28sf of landing to connect the stairs. apply variance for the deck in setback.Details
add a new 185sf deck on the garage and add 28sf of landing to connect the stairs. apply variance for the deck in setback. | $12,500 |
| Jun 4, 2024 | In progress issued Mar 2026 | 5216 Mission St | Cc & Contractor Inc | interior remodel of a 1620 sq ft. restaurant. remodel new kitchen & new bathroom. add new commercial tankless water heater, new hood, exhaust fan, new heat pump. electrical panel remain. (e) storage remain no change. no front facade work. new heat pumpDetails
interior remodel of a 1620 sq ft. restaurant. remodel new kitchen & new bathroom. add new commercial tankless water heater, new hood, exhaust fan, new heat pump. electrical panel remain. (e) storage remain no change. no front facade work. new heat pump | $92,800 |
| Apr 3, 2024 | Completed final sign-off Aug 2024 | 380 10th St | E. N. A Construction Inc. | unit #10: to remodel (2) bathrooms, one at the 1/f and the other at the 2/f. no structural work to be done. relocate the (e) laundry area - washer/dryer- from the 1st floor to the 2nd floor.Details
unit #10: to remodel (2) bathrooms, one at the 1/f and the other at the 2/f. no structural work to be done. relocate the (e) laundry area - washer/dryer- from the 1st floor to the 2nd floor. | $35,000 |
| Aug 8, 2023 | Completed final sign-off Aug 2023 | 4523 Mission St | to comply with accessible business entrance program 51-16, abe #201912049205, per automatic door legalization & remove floor mat.Details
to comply with accessible business entrance program 51-16, abe #201912049205, per automatic door legalization & remove floor mat. | $1,000 | |
| Jul 25, 2023 | Completed final sign-off Aug 2023 | 2467 47th Av | legalize front yard concrete pavement (6" thick paving). comply w/ complaint 202309469Details
legalize front yard concrete pavement (6" thick paving). comply w/ complaint 202309469 | $500 | |
| May 24, 2023 | Never finaled issued Jun 2023, no final | 1510 Eddy St | Trip Hazard Llc Dba Trip Hazard Landscap | concrete walkway repair in common area.Details
concrete walkway repair in common area. | $3,000 |
| May 24, 2023 | Never finaled issued Jun 2023, no final | 1455 Fillmore St | Trip Hazard Llc Dba Trip Hazard Landscap | concrete walkway repair in common area.Details
concrete walkway repair in common area. | $3,000 |
| Mar 17, 2023 | Expired or cancelled cancelled Jan 2026 | 647 Cole St | roof reinforcement, add 7 new skylights. main level remains, no change. add storage in the existing floor plan of the attic.Details
roof reinforcement, add 7 new skylights. main level remains, no change. add storage in the existing floor plan of the attic. | $5,000 | |
| Jan 6, 2023 | Completed final sign-off Jun 2023 | 3769 24th St | City Lumber & Hardware Inc Dba City Door | replace existing double door (exterior) to electric (e) ext double for ada compliance. to comply with abe program per ordinance 51-16. abe 202001030613. convert retail to fitness studioDetails
replace existing double door (exterior) to electric (e) ext double for ada compliance. to comply with abe program per ordinance 51-16. abe 202001030613. convert retail to fitness studio | $2,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 22 Cutler Av | revision to pa#202203099603 to change of cross beam design to sister joists. see -s-1Details
revision to pa#202203099603 to change of cross beam design to sister joists. see -s-1 | ||
| Oct 26, 2022 | Completed final sign-off Feb 2024 | 1885 Jackson St | #101. design an opening on load bearing wall. move refrig. and cabinets.Details
#101. design an opening on load bearing wall. move refrig. and cabinets. | $25,000 | |
| Jul 25, 2022 | Completed final sign-off Oct 2023 | 25 Sunview Dr | Mountain Top Construction Llc | to comply with nov 202292660. adding new deck on the rear side of (e) house. new 3' height fence.Details
to comply with nov 202292660. adding new deck on the rear side of (e) house. new 3' height fence. | $33,000 |
| Jul 13, 2022 | Expired or cancelled cancelled Jan 2026 | 15 Hearst Av | remodel entire 1/f. demolish walls and replace door/windows. relocate kitchen. add new interior stair to 2/f. demolish (e) stairs. remodel entire 2/f. convert (e) kitchen to bath. new tankless water heater.Details
remodel entire 1/f. demolish walls and replace door/windows. relocate kitchen. add new interior stair to 2/f. demolish (e) stairs. remodel entire 2/f. convert (e) kitchen to bath. new tankless water heater. | $100,000 | |
| Jun 23, 2022 | Never finaled issued Nov 2022, no final | 2253 Bay St | F C Company | add new stairs from 1st floor to 2nd floor. change window into new french door leadin gto backyard. remove load bearing wall 1st floor. add w/d, relocate hvac; remove potential udu on gfDetails
add new stairs from 1st floor to 2nd floor. change window into new french door leadin gto backyard. remove load bearing wall 1st floor. add w/d, relocate hvac; remove potential udu on gf | $60,000 |
| Jun 17, 2022 | Never finaled issued Oct 2022, no final | 260 Roosevelt Wy | remodeling kitchen and bathrooms. removing walls at level 3 kitchen and bedroom and upgrading elctricalDetails
remodeling kitchen and bathrooms. removing walls at level 3 kitchen and bedroom and upgrading elctrical | $75,000 | |
| May 4, 2022 | Completed final sign-off Feb 2024 | 51 Ridgewood Av | to comply with nov #202289795. removing stairs on the side yard. build new fence & door in yard. repair stucco. fence at front to be 3 feet in height or less at the front being solid.Details
to comply with nov #202289795. removing stairs on the side yard. build new fence & door in yard. repair stucco. fence at front to be 3 feet in height or less at the front being solid. | $10,000 | |
| Apr 14, 2022 | Never finaled filed Apr 2022, never issued | 1255 38th Av | addition of one adu unit at the first floor per the state adu program.Details
addition of one adu unit at the first floor per the state adu program. | $17,000 | |
| Mar 9, 2022 | Completed final sign-off Mar 2023 | 22 Cutler Av | remodel kitchen and remove load bearing wall.Details
remodel kitchen and remove load bearing wall. | $18,000 | |
| Mar 3, 2022 | Never finaled filed Mar 2022, never issued | 1255 38th Av | converting 2 storage areas into kitchen and bedroomDetails
converting 2 storage areas into kitchen and bedroom | ||
| Dec 2, 2021 | Completed final sign-off Jun 2024 | 418 Capp St | White Construction Builders Inc | ground level interior conversion of existing garage into a 2bd/2ba unit.Details
ground level interior conversion of existing garage into a 2bd/2ba unit. | $80,000 |
| Nov 17, 2021 | Completed final sign-off Feb 2022 | 740 North Point St | seismic retrofit. (voluntary)Details
seismic retrofit. (voluntary) | $30,000 | |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 1274 24th Av | Smith Builders Group Inc | renovate an existing garage, driveway, planter, stairway to 2nd floor. relocate electrical meter.Details
renovate an existing garage, driveway, planter, stairway to 2nd floor. relocate electrical meter. | $17,000 |
| Oct 21, 2021 | Completed final sign-off Feb 2022 | 2034 Greenwich St | San Francisco Investment Development | (e) living room walls to be demolished on 2/f & 3/f. new beams & posts. installed to create openings btween living room & dining.Details
(e) living room walls to be demolished on 2/f & 3/f. new beams & posts. installed to create openings btween living room & dining. | $15,000 |
| Jul 29, 2021 | Completed final sign-off Oct 2021 | 1580 Treat Av | Smith Builders Group Inc | 1st floor bathroom remodel.Details
1st floor bathroom remodel. | $30,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2021 | 419 Garfield St | Smith Builders Group Inc | replace corroded beam and stud. replace non-bearing beam 6x10 in kind. replace header beam in kind.Details
replace corroded beam and stud. replace non-bearing beam 6x10 in kind. replace header beam in kind. | $15,000 |
| Apr 26, 2021 | Completed final sign-off Sep 2022 | 1695 Funston Av | Z L Construction | remodel 2nd fl kitchen area. add laundry room at 3rd fl. replace bathroom #1 bathrub to shower. replace bathroom #2 shower to tub. replace deck finish on top floor.Details
remodel 2nd fl kitchen area. add laundry room at 3rd fl. replace bathroom #1 bathrub to shower. replace bathroom #2 shower to tub. replace deck finish on top floor. | $30,000 |
| Apr 26, 2021 | Never finaled issued Sep 2021, no final | 515 Dellbrook Av | interior remodeling & deck reinforcement. adding a jacuzzi.Details
interior remodeling & deck reinforcement. adding a jacuzzi. | $8,000 |