Lefler Engineering
- Listed as
- designer, engineer
- Based in
- San Rafael
- On San Francisco permits
- Sep 2005 to Oct 2018
11 permits since 2000 (engineer on 10 permits, designer on 1 permit): 7 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2018 | Completed final sign-off May 2021 | 2 Mint Pz | E B Gilmore & Sons Mech Svcs Inc | supply and install 3 hot water boilers, piping and flues to replace city steam. 1 boiler at rooftop and 2 at basement. aka 410 jessie stDetails
supply and install 3 hot water boilers, piping and flues to replace city steam. 1 boiler at rooftop and 2 at basement. aka 410 jessie st | $180,000 |
| Apr 7, 2017 | Completed final sign-off Jul 2017 | 2001 37th Av | Devcon Construction | music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and officeDetails
music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and office | $18,000 |
| Jun 9, 2016 | Never finaled issued Aug 2016, no final | 444 De Haro St | City Mechanical Inc | provide & install (1) a/c system with condensate line in the 2nd floor server room. maher naDetails
provide & install (1) a/c system with condensate line in the 2nd floor server room. maher na | $4,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 300 Montgomery St | City Mechanical Inc | #350- hvac t.i. per scope, existing supply air from central fan system will be ducted to new vav boxes to provide cooling, existing building heating will feed reheat coils at vav boxes, new split heat pump, new restroom exhaist fans. n/a ordinance #155-13Details
#350- hvac t.i. per scope, existing supply air from central fan system will be ducted to new vav boxes to provide cooling, existing building heating will feed reheat coils at vav boxes, new split heat pump, new restroom exhaist fans. n/a ordinance #155-13 | $100,000 |
| Dec 3, 2015 | Completed final sign-off Jun 2018 | 330 Berry St | Andrew Chekene Enterprises/ Dba Ac Enter | saw cut concrete floor slab to access underslab piping, replacement of any section of pipe where (e) pipe is damaged. adjust (e) pipe hangers to achieve proper slope for piping.Details
saw cut concrete floor slab to access underslab piping, replacement of any section of pipe where (e) pipe is damaged. adjust (e) pipe hangers to achieve proper slope for piping. | $578,000 |
| Jul 17, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | D Kelly Construction Inc. | revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor.Details
revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor. | $3,000 |
| Apr 30, 2015 | Never finaled issued May 2015, no final | 700 Marina Bl | Justin Farrelly Incorporated | replace boiler in kindDetails
replace boiler in kind | $190,000 |
| Mar 27, 2015 | Never finaled issued Nov 2015, no final | 1880 Pine St | Nibbi Bros Assoc Inc. | moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape,Details
moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape, | $7,936,478 |
| Oct 22, 2010 | Completed final sign-off Feb 2011 | 2123 Fillmore St | Everbuilt Construction, Inc. | remove & replace existing casework, counters, tile flooring, add ada restroom, install tenant supplied equipment, install ventilation, replace existing lighting, replace storefront.Details
remove & replace existing casework, counters, tile flooring, add ada restroom, install tenant supplied equipment, install ventilation, replace existing lighting, replace storefront. | $80,000 |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 638 Minna St | Saarman Construction,Ltd. | replacebathroom exhaust fans & install carbon monoxide sensor in garage. duct extension on roof (to be field verified).Details
replacebathroom exhaust fans & install carbon monoxide sensor in garage. duct extension on roof (to be field verified). | $2,000 |
| Sep 15, 2005 | Expired or cancelled expired Oct 2008 | 655 Divisadero St | mechanical exhaust for type 2 hood pizza oven.Details
mechanical exhaust for type 2 hood pizza oven. | $8,000 |