Kevin James
- Listed as
- architect
- Firm
- Mcg
- Based in
- San Francisco
- On San Francisco permits
- Aug 2004 to Oct 2023
14 permits since 2000 (architect on 14 permits): 7 completed, 2 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2023 | Completed final sign-off Mar 2024 | 1567 Sloat Bl | Oak Park Construction | the work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenantDetails
the work will primarily be anew mechanical chase penetrating the 2nd floor and roof deck. no work will be conducted within the existing 2nd floor tenant spaces. work to include new mechanical chase infrastructure for future tenant | $15,000 |
| Jun 7, 2021 | Expired or cancelled cancelled Oct 2024 | 3535 Geary Bl | tenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs.Details
tenant improvement: partial demolition of (2) walls, (2) electrical receptacles for owner provided fixturs. | $45,000 | |
| Mar 23, 2021 | Expired or cancelled cancelled Jan 2026 | 201 Bay Shore Bl | new hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains.Details
new hvac upgrades - new vrf heatpump system and provide new zoning layout. new condensate drains. | $50,000 | |
| Mar 23, 2021 | Expired or cancelled cancelled Jan 2026 | 201 Bay Shore Bl | removal and upgrade to existing electrical servicesDetails
removal and upgrade to existing electrical services | $50,000 | |
| Nov 17, 2020 | Never finaled issued Feb 2021, no final | 728 Pacific Av | Amone Corp | suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditionsDetails
suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions | |
| Sep 26, 2020 | Expired or cancelled cancelled Jan 2026 | 1301 Van Ness Av | security improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a**Details
security improvement to an existing 19,246 sq ft retail tenant. work limited to the replacement of an existing glazed door at sutter facade w/(n) hollow metal door and (n) rolling security door at internal stairs per plans. **maher n/a** | $20,000 | |
| Sep 26, 2020 | Never finaled issued Jun 2021, no final | 2633 San Bruno Av | Da Chung Incorporated | suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged.Details
suite b: rev to pa 202002215145: addition of a new vertical ada lift in lieu of a stairway platform lift. conversion of one room into 2 smaller rooms containing plumbing fixtures & lighting. two adjacent rooms also enlarged. | $60,000 |
| Sep 26, 2020 | Expired or cancelled withdrawn Nov 2020 | 3251 20th Av | upgrade of (e) door to be secure with new secure hardware. not visible to street.Details
upgrade of (e) door to be secure with new secure hardware. not visible to street. | $5,000 | |
| Sep 26, 2020 | Completed final sign-off Jun 2021 | 2633 San Bruno Av | Da Chung Incorporated | suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a.Details
suite a: t.i.: new walls & doors, new plumbing fixtures & electrical. new ceiling, new finishes. removal of 2 showers, new hvac unit for 1/f. maher n/a. | $80,000 |
| Jul 19, 2013 | Completed final sign-off May 2014 | 761 Post St | interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017.Details
interior non-structural demolition at basement, mezzanine and floors 1-17. all work to comply with ab-017. | $375,000 | |
| Jun 14, 2012 | Completed final sign-off Nov 2012 | 1401 California St | P S R West Coast Builders Inc | documentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work.Details
documentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work. | |
| Nov 30, 2011 | Completed final sign-off Mar 2013 | 1401 California St | Cannon Constructors North Inc | partial exterior demolition and partial renovation of the core and shell.Details
partial exterior demolition and partial renovation of the core and shell. | $950,000 |
| Dec 2, 2005 | Completed final sign-off Dec 2005 | 899 Howard St | Michael Heavey Construction | occupy vacant space for retail expansionDetails
occupy vacant space for retail expansion | $40,000 |
| Aug 9, 2004 | Completed final sign-off Apr 2006 | 899 Howard St | modify (e) facade, entrance and handicap ramp.Details
modify (e) facade, entrance and handicap ramp. | $100,000 |