Justen Peek
- Listed as
- designer, engineer
- Firm
- Advanced Engineering
- Based in
- Brentwood
- On San Francisco permits
- Jul 2012 to Sep 2023
13 permits since 2000 (engineer on 12 permits, designer on 1 permit): 9 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2023 | In progress issued Apr 2024 | 1395 Evans Av | Mitchell Engineering | revision to 202210275308, 201906173524. relocate elevator & reconfigure main stair. revise floor plan. add 2 restrooms. minor interior partition changes.Details
revision to 202210275308, 201906173524. relocate elevator & reconfigure main stair. revise floor plan. add 2 restrooms. minor interior partition changes. | $12,000 |
| Apr 30, 2021 | Expired or cancelled cancelled Jan 2026 | 37 Winfield St | renovation and move kitchen and bathroom on upper level. renovation of main bedroom on upper level. conversion of half of garage , laundry & storage area into living space. move bathroom on lower level. build out of 2 bedrooms on lower level. new windows. update to facade.Details
renovation and move kitchen and bathroom on upper level. renovation of main bedroom on upper level. conversion of half of garage , laundry & storage area into living space. move bathroom on lower level. build out of 2 bedrooms on lower level. new windows. update to facade. | $500,000 | |
| Mar 21, 2019 | Completed final sign-off Oct 2019 | 837 Wisconsin St | replace existing retaining wall in east/rear portion of back yard. to comply with nov #201531001.Details
replace existing retaining wall in east/rear portion of back yard. to comply with nov #201531001. | $10,000 | |
| Dec 28, 2018 | Completed final sign-off Jul 2023 | 1370 Van Dyke Av | no change to exterior, remove portion of 1st flr stroage and (e) stair. new portion of 2nd flr laboratories, walkway, new stairs and accessible restroom. mech, lighting and sprinkler under sep permit. maher naDetails
no change to exterior, remove portion of 1st flr stroage and (e) stair. new portion of 2nd flr laboratories, walkway, new stairs and accessible restroom. mech, lighting and sprinkler under sep permit. maher na | $100,000 | |
| Sep 20, 2018 | Completed final sign-off Feb 2022 | 33 Bartlett St | Narrowback Construction Co. | change of occupancy from s-1 to b & f-1 & s-1. new second floor within existing building envelope and mezzanineDetails
change of occupancy from s-1 to b & f-1 & s-1. new second floor within existing building envelope and mezzanine | $120,000 |
| Feb 12, 2018 | Completed final sign-off Jul 2024 | 660 Lombard St | 1) new interior wall with tempered glazing, 2) new entry door and new partiton at computer room, 3) new case opening at art room, 4) no mechanical and electrical wiring, 5) backboards and curtain mounts at gym. n/a for maherDetails
1) new interior wall with tempered glazing, 2) new entry door and new partiton at computer room, 3) new case opening at art room, 4) no mechanical and electrical wiring, 5) backboards and curtain mounts at gym. n/a for maher | $10,000 | |
| Sep 22, 2016 | Expired or cancelled expired Mar 2023 | 1441 Stevenson St | Jian's Builder Corp | upgrade fire exits, disable access. add truck doors. enclose low roof area. parcial compliance with voilation# 201450471. reverting back to original use from residential back to commercial use. ** maher: **Details
upgrade fire exits, disable access. add truck doors. enclose low roof area. parcial compliance with voilation# 201450471. reverting back to original use from residential back to commercial use. ** maher: ** | $150,000 |
| Apr 29, 2016 | Completed final sign-off Jan 2017 | 40 Shrader St | R D Sherrill Inc | r&r retaining wall. replace with new concrete retaining wall. maher naDetails
r&r retaining wall. replace with new concrete retaining wall. maher na | $36,000 |
| Nov 18, 2015 | Completed final sign-off Feb 2016 | 320 El Camino Del Mar | soft story -revision to appl #201503060192 - relocate shear walls, add voluntary additional shear walls.Details
soft story -revision to appl #201503060192 - relocate shear walls, add voluntary additional shear walls. | $2,000 | |
| Jan 20, 2015 | Completed final sign-off Jan 2017 | 50 Shrader St | R D Sherrill Inc | demo and replace defective retaining wall in order to replace rear exterior stair. original stair to be demolished after replacement stair is constructed. maher not reqDetails
demo and replace defective retaining wall in order to replace rear exterior stair. original stair to be demolished after replacement stair is constructed. maher not req | $238,000 |
| Jul 31, 2014 | Completed final sign-off Nov 2014 | 575 07th St | 1)interior t.i. 1st & 2nd floor. demo old restrooms at both flrs & add new restrooms, shower, & kchn at 1st flr. 2)new store front system with new entry door on 7th street. 3)nw swing dr on gilbert st. 4)voluntary seismic upgrade. elect. mech. under seperate permit.n/a for the maher.Details
1)interior t.i. 1st & 2nd floor. demo old restrooms at both flrs & add new restrooms, shower, & kchn at 1st flr. 2)new store front system with new entry door on 7th street. 3)nw swing dr on gilbert st. 4)voluntary seismic upgrade. elect. mech. under seperate permit.n/a for the maher. | $75,000 | |
| Oct 31, 2013 | Completed final sign-off May 2015 | 2179 40th Av | horizontal addition of 326 sq. ft. to expand bedrooms. remodel 1st floor and add full bathroom. remodel of 2nd floor and add full bathroom.Details
horizontal addition of 326 sq. ft. to expand bedrooms. remodel 1st floor and add full bathroom. remodel of 2nd floor and add full bathroom. | $50,000 | |
| Jul 5, 2012 | Never finaled issued Mar 2016, no final | 518 Anderson St | kitchen & bath remodeling, voluntary structural upgrade under kitchen & sun room. replacement of a rear stairway. bedrm #3, bathrm #2 & laundry at ground floor.Details
kitchen & bath remodeling, voluntary structural upgrade under kitchen & sun room. replacement of a rear stairway. bedrm #3, bathrm #2 & laundry at ground floor. | $20,000 |