Julio Nieto Valle
- Listed as
- contractor, designer
- Firm
- Nieto Valle Construction
- Based in
- Hayward
- On San Francisco permits
- Mar 2014 to Aug 2025
24 permits since 2000 (contractor on 24 permits, designer on 1 permit): 24 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2025 | Completed final sign-off Nov 2025 | 248 Cumberland St | Nieto Valle Construction | install a (n) shear wall between line b&d. install a new 4x4 x20' strut along line b w/ 2x block over strut between joists. add a new shear wall between back end of bay window and line #4. supplement beam to post connection along line d in the middle of garage.Details
install a (n) shear wall between line b&d. install a new 4x4 x20' strut along line b w/ 2x block over strut between joists. add a new shear wall between back end of bay window and line #4. supplement beam to post connection along line d in the middle of garage. | $22,801 |
| Nov 30, 2023 | Completed final sign-off Oct 2024 | 195 Portola Dr | Nieto Valle Construction | to comply w/ nov #202303480. deconstruction to satisfy & conformance w/ the notice of violation (complaint #202303480) for work conducted without permit. remove all work performed on the exterior at the westside of the house.Details
to comply w/ nov #202303480. deconstruction to satisfy & conformance w/ the notice of violation (complaint #202303480) for work conducted without permit. remove all work performed on the exterior at the westside of the house. | $11,200 |
| Aug 2, 2023 | Completed final sign-off Jan 2024 | 3739 20th St | Nieto Valle Construction | voluntary strengthening of a portion of e dwelling and is not intened to bring the structure up to current code requirements for new construction.Details
voluntary strengthening of a portion of e dwelling and is not intened to bring the structure up to current code requirements for new construction. | $25,320 |
| Oct 17, 2022 | Completed final sign-off Jan 2023 | 199 Burnside Av | Nieto Valle Construction | revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length.Details
revision to 2022-0602-5431. relocate proposed shear wall on line a from the south end to the north end. no change to shear wall length. | |
| Jun 30, 2022 | Completed final sign-off Oct 2022 | 459 Potrero Av | Nieto Valle Construction | voluntary seismic retrofit as per plan set (a). sill plate anchorage. work does not represent a complete seismic retrofit of the entire bldg.Details
voluntary seismic retrofit as per plan set (a). sill plate anchorage. work does not represent a complete seismic retrofit of the entire bldg. | $18,480 |
| Jun 22, 2022 | Completed final sign-off Nov 2022 | 723 Guerrero St | Nieto Valle Construction | modification of (e) overhang supports for voluntary seismic retrofit.Details
modification of (e) overhang supports for voluntary seismic retrofit. | $21,411 |
| Jun 2, 2022 | Completed final sign-off Jan 2023 | 199 Burnside Av | Nieto Valle Construction | voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108)Details
voluntary engineered seismic retrofit to comply with the brace and bolt program.this permit is for work to be performed in general confromance w/ california existing building code(cebc), appendix ch.a3(sfbc ab-108) | $94,124 |
| Oct 27, 2021 | Completed final sign-off Jul 2022 | 254 Page St | Nieto Valle Construction | structural work only. voluntary strengthening in the crawlspace. adding ply shear walls with foundation and new posts with concrete pad footings.Details
structural work only. voluntary strengthening in the crawlspace. adding ply shear walls with foundation and new posts with concrete pad footings. | $70,000 |
| Mar 10, 2021 | Completed final sign-off Sep 2021 | 1239 22nd Av | Nieto Valle Construction | voluntary strengthening of 1st floor.Details
voluntary strengthening of 1st floor. | $103,750 |
| Aug 30, 2019 | Completed final sign-off Aug 2020 | 1948 Washington St | Nieto Valle Construction | seismic retrofit at the 1st story as triggered by the mandatory soft story ord. designed per 2016 cebc appx a4 (sfebc chapter 4d)Details
seismic retrofit at the 1st story as triggered by the mandatory soft story ord. designed per 2016 cebc appx a4 (sfebc chapter 4d) | $70,000 |
| Sep 18, 2018 | Completed final sign-off May 2019 | 2 Castro St | Nieto Valle Construction | revision to 201712196846 details 8 & 5 on s5.1 - rebar and holddowns on concrete grade beam. detail 11 on s8.1 - studs welded into (e) i beam column m,aher naDetails
revision to 201712196846 details 8 & 5 on s5.1 - rebar and holddowns on concrete grade beam. detail 11 on s8.1 - studs welded into (e) i beam column m,aher na | |
| Sep 6, 2018 | Completed final sign-off May 2019 | 2 Castro St | Nieto Valle Construction | revision to pa 2017-1219-6846, detail 9s8.1 shear clips only. detail 10s8.1 framing field condition different from original detail. cmst straps reduce to 3 locationsDetails
revision to pa 2017-1219-6846, detail 9s8.1 shear clips only. detail 10s8.1 framing field condition different from original detail. cmst straps reduce to 3 locations | |
| Jun 1, 2018 | Completed final sign-off Sep 2018 | 830 Broderick St | Nieto Valle Construction | revision to 201709158484. new shearwalls, footers, stem walls. maher naDetails
revision to 201709158484. new shearwalls, footers, stem walls. maher na | $50,000 |
| Dec 19, 2017 | Completed final sign-off Jul 2019 | 2 Castro St | Nieto Valle Construction | to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4Details
to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4 | $40,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2022 | 557 Capp St | Nieto Valle Construction | seismic upgrade in accordance per sfebc chapter 4-d. 2016 cebc appendix a-4.Details
seismic upgrade in accordance per sfebc chapter 4-d. 2016 cebc appendix a-4. | $150,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2018 | 830 Broderick St | Nieto Valle Construction | soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a **Details
soft story seismic retrofit based on 2016 ibc appendix 4a. no exterior work. ** maher: n/a ** | $60,000 |
| May 10, 2017 | Completed final sign-off Sep 2017 | 1920 Jefferson St | Nieto Valle Construction | revision to 201601157276 double the thickness of one shear wall to accomodate utilitiesDetails
revision to 201601157276 double the thickness of one shear wall to accomodate utilities | |
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 295 Buchanan St | Nieto Valle Construction | s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 235 Buchanan St | Nieto Valle Construction | s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Jul 22, 2016 | Completed final sign-off Feb 2017 | 1213 York St | Nieto Valle Construction | implement voluntary engineered seismic retrofit to comply with the brace & bolt programDetails
implement voluntary engineered seismic retrofit to comply with the brace & bolt program | $31,125 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 1694 36th Av | Nieto Valle Construction | voluntary strengthening at front of house. install a steel column and concrete grade beam in the garage slab floor as per engineering plans.Details
voluntary strengthening at front of house. install a steel column and concrete grade beam in the garage slab floor as per engineering plans. | $21,000 |
| Oct 22, 2015 | Completed final sign-off Jul 2016 | 648 Waller St | Nieto Valle Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of crawl space cripple walls, add new shear walls at crawl space.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. strengthening of crawl space cripple walls, add new shear walls at crawl space. | $50,000 |
| Oct 9, 2015 | Completed final sign-off Nov 2015 | 4404 17th St | Nieto Valle Construction | repair of failed concrete slab on grade. work is confined to the east half of the garage, within the (e) perimeter footingDetails
repair of failed concrete slab on grade. work is confined to the east half of the garage, within the (e) perimeter footing | $10,250 |
| Mar 10, 2014 | Completed final sign-off Aug 2014 | 4935 17th St | Nieto Valle Construction | compliance with sfbc chapter 34c mandatory soft story seismic retrofit.Details
compliance with sfbc chapter 34c mandatory soft story seismic retrofit. | $5,000 |