Joseph Roger
- Listed as
- architect, engineer
- Based in
- Larkspur
- On San Francisco permits
- Nov 2004 to Aug 2015
7 permits since 2000 (engineer on 4 permits, architect on 3 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2015 | Completed final sign-off Feb 2017 | 2335 Hyde St | Paul Power Construction | common area- excavate to expand existing garage space, shore existing framing during construction, relocate sewer line as necessary to accommodate new space.Details
common area- excavate to expand existing garage space, shore existing framing during construction, relocate sewer line as necessary to accommodate new space. | $290,000 |
| Apr 21, 2014 | Completed final sign-off Nov 2016 | 3732 Fillmore St | Dwyer Construction Inc | remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above.Details
remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above. | $45,000 |
| May 31, 2013 | Completed final sign-off Feb 2014 | 235 Mallorca Wy | ground floor remodel to expand extg bedroom into extg garage remodel extg bath and laundry enclose extg atrium at 1st floor and reconfigure living, dining and hall and stair to ground floor. no exterior expansion.Details
ground floor remodel to expand extg bedroom into extg garage remodel extg bath and laundry enclose extg atrium at 1st floor and reconfigure living, dining and hall and stair to ground floor. no exterior expansion. | $65,000 | |
| Jan 24, 2011 | Completed final sign-off Jan 2012 | 1471 Jackson St | Hardiman Construction | voluntary seismic upgrade of apartment building soft story per ab-94.Details
voluntary seismic upgrade of apartment building soft story per ab-94. | $30,000 |
| Jan 24, 2011 | Completed final sign-off Nov 2011 | 1345 Sacramento St | Hardiman Construction | voluntary seismic upgrade of apartment building soft story per ab-94.Details
voluntary seismic upgrade of apartment building soft story per ab-94. | $30,000 |
| Jan 16, 2007 | Expired or cancelled expired Jun 2007 | 2525 Webster St | remove extg non-bearing partition wall. approximately 16' in length dividing kchn and dining areaDetails
remove extg non-bearing partition wall. approximately 16' in length dividing kchn and dining area | $5,000 | |
| Nov 18, 2004 | Never finaled issued Nov 2004, no final | 1 Market St | Turner Construction Co | office tenant improvement including minor demo, ceiling patching, electrical & new systems work statDetails
office tenant improvement including minor demo, ceiling patching, electrical & new systems work stat | $95,000 |