John Kamus
- Listed as
- architect, engineer
- Firm
- Kamus + Keller + Turpin
- Based in
- Simi Valley
- On San Francisco permits
- Feb 2011 to Sep 2026
65 permits since 2000 (architect on 63 permits, engineer on 2 permits): 51 completed, 7 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 501 02nd St | ste 415 tenant improvement to include demolition of non-structural partitions & ceiling partitions, ceiling power and finishes. corridor and elevator lobby scope to include new finishes. mep/fire alarm systems/fire sprinklers/ signage deferredDetails
ste 415 tenant improvement to include demolition of non-structural partitions & ceiling partitions, ceiling power and finishes. corridor and elevator lobby scope to include new finishes. mep/fire alarm systems/fire sprinklers/ signage deferred | $520,146 | |
| Aug 13, 2026 | In progress issued Oct 2026 | 220 Montgomery St | Field Construction Inc. | 7th floor suite #700: t.i. to include demolition of non structural partitions & ceiling. construction of new partitions, ceiling, power & finishes. fire, life safety sprinklers to be on seperate permits.Details
7th floor suite #700: t.i. to include demolition of non structural partitions & ceiling. construction of new partitions, ceiling, power & finishes. fire, life safety sprinklers to be on seperate permits. | $125,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes.Details
12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes. | $125,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupantsDetails
11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupants | $125,000 |
| Jul 21, 2026 | Completed final sign-off Aug 2026 | 501 02nd St | R.M.R. Construction Company | revision 202604149417 to address inspector req to identity location to accessible phone room and req signageDetails
revision 202604149417 to address inspector req to identity location to accessible phone room and req signage | |
| Apr 14, 2026 | Completed final sign-off Aug 2026 | 501 02nd St | R.M.R. Construction Company | 3/fl- suite 350 - revision 202510026586- addition of (3) new phone booths to tenant spaceDetails
3/fl- suite 350 - revision 202510026586- addition of (3) new phone booths to tenant space | $34,000 |
| Apr 8, 2026 | Completed final sign-off Jul 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | ste 300 & 305: revision to permit 202512111596. a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted.Details
ste 300 & 305: revision to permit 202512111596. a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted. | $1,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 350 California St | C C I Commercial Construction & Improv | suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred.Details
suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred. | $136,000 |
| Mar 12, 2026 | In progress filed Mar 2026, not yet issued | 220 Montgomery St | ste 870-876-ti. include demo of non structural partitions and ceiling. scope includes construction of new partitions, ceiling, power & finishes. seperate permits for fire/lifesafty/fire sprklr/mepDetails
ste 870-876-ti. include demo of non structural partitions and ceiling. scope includes construction of new partitions, ceiling, power & finishes. seperate permits for fire/lifesafty/fire sprklr/mep | $125,000 | |
| Mar 12, 2026 | In progress issued May 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for marketing of vacant ste & is not intended for occupancy at the time. seperate permits inc: fire/lifesafty/fire sprklr/mepDetails
suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for marketing of vacant ste & is not intended for occupancy at the time. seperate permits inc: fire/lifesafty/fire sprklr/mep | $125,000 |
| Jan 27, 2026 | Completed final sign-off Feb 2026 | 1 Powell St | Development Support Services Inc | replace carpet tiles, painting, store fixtures, cleaning.Details
replace carpet tiles, painting, store fixtures, cleaning. | $65,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | 6/fl- ste 605- revision 202510087015 for space plan reivisons. ti to include soft demo of non strucrtural partitions and ceiling, construction of (n) partitions, ceiling, power and finishes. market ready condiditon suite will be used for marketing of vacant suite and is not intended for occupancyDetails
6/fl- ste 605- revision 202510087015 for space plan reivisons. ti to include soft demo of non strucrtural partitions and ceiling, construction of (n) partitions, ceiling, power and finishes. market ready condiditon suite will be used for marketing of vacant suite and is not intended for occupancy | |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | 3rd/f ste 360: t.i. demo of non structural partitions & ceiling. construction of new partitions, ceiling, power, finishes. market ready condition of ste will be used for markeing of occupancy under separate permit. mep/ fire under separate permitDetails
3rd/f ste 360: t.i. demo of non structural partitions & ceiling. construction of new partitions, ceiling, power, finishes. market ready condition of ste will be used for markeing of occupancy under separate permit. mep/ fire under separate permit | $136,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | Field Construction Inc. | ste 1200- ti to include demo of non structural partitions and ceiling. construction of (n) partitions, ceiling, power and finishes. market ready coalition of will be used for marketing of vacant suite and not intended to be occupied. under separte permit life/safety fire sprinklers mepDetails
ste 1200- ti to include demo of non structural partitions and ceiling. construction of (n) partitions, ceiling, power and finishes. market ready coalition of will be used for marketing of vacant suite and not intended to be occupied. under separte permit life/safety fire sprinklers mep | $136,000 |
| Dec 15, 2025 | In progress issued Feb 2026 | 220 Montgomery St | Skyline Construction | 6/fl- common area ti to include demo of non structrual partitions and ceiling, construction of (n) partitions ceiling, and finishes. under separte permit for fire/life/safety and fire sprinklersDetails
6/fl- common area ti to include demo of non structrual partitions and ceiling, construction of (n) partitions ceiling, and finishes. under separte permit for fire/life/safety and fire sprinklers | $136,000 |
| Dec 11, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | 3/fl- suite 300 and 305- ti to include of non structrual partitions, ceiilngs,construct partitions, ceiling, power and finishes. market ready condition of suite will be used for marketing of vacant site and not intended for occupany changeDetails
3/fl- suite 300 and 305- ti to include of non structrual partitions, ceiilngs,construct partitions, ceiling, power and finishes. market ready condition of suite will be used for marketing of vacant site and not intended for occupany change | $136,000 |
| Dec 4, 2025 | Completed final sign-off Apr 2026 | 220 Montgomery St | Field Construction Inc. | ste 406/4/fl-t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit.Details
ste 406/4/fl-t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit. | |
| Nov 21, 2025 | Completed final sign-off Jun 2026 | 333 Pine St | Field Construction Inc. | 2/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 2/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only.Details
2/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 2/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only. | $30,000 |
| Nov 20, 2025 | Completed final sign-off May 2026 | 501 02nd St | R.M.R. Construction Company | 1/fl- ti improvement -ste 100- to include demo non strutural partitions and ceiling, consturction of (n) partitions, ceilings, power and finishes. under separte permit,mep , fire life/safety , fire sprinklersDetails
1/fl- ti improvement -ste 100- to include demo non strutural partitions and ceiling, consturction of (n) partitions, ceilings, power and finishes. under separte permit,mep , fire life/safety , fire sprinklers | $100,000 |
| Nov 5, 2025 | Completed final sign-off Jun 2026 | 333 Pine St | Field Construction Inc. | 4/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 4/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only........Details
4/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 4/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only........ | $136,000 |
| Oct 10, 2025 | Completed final sign-off May 2026 | 501 02nd St | Novo Construction Inc | (ste #710/7th floor) tenant improvement to include demo of non-structural wall partitions to ceiling, construction of new ceiling, power, and finishes. to be submitted under a separate permit: mechanical, electrical, plumbing, fire/life safety and fire sprinklers.Details
(ste #710/7th floor) tenant improvement to include demo of non-structural wall partitions to ceiling, construction of new ceiling, power, and finishes. to be submitted under a separate permit: mechanical, electrical, plumbing, fire/life safety and fire sprinklers. | $150,000 |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | ste 605, 6th flr; t.i. to include demolition non-structural partitions and ceiling, construction of new partitions, ceiling, power + finishes. market ready condition suite will be uder for marketing of vacant suite and not for occupancy at time. submitted under separate permit: mepDetails
ste 605, 6th flr; t.i. to include demolition non-structural partitions and ceiling, construction of new partitions, ceiling, power + finishes. market ready condition suite will be uder for marketing of vacant suite and not for occupancy at time. submitted under separate permit: mep | $136,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | 4/fl- ti include demo of non structrual partitions, ceilings, construction of (n) partitions, ceiling, power and finishes. market ready condition of site will be used for marketing and vacant site and is no intended for occupant at this time. under separte mep and fire under seperate permits.Details
4/fl- ti include demo of non structrual partitions, ceilings, construction of (n) partitions, ceiling, power and finishes. market ready condition of site will be used for marketing and vacant site and is no intended for occupant at this time. under separte mep and fire under seperate permits. | $136,000 |
| Oct 2, 2025 | Completed final sign-off May 2026 | 501 02nd St | R.M.R. Construction Company | suite 350: tenant improvement to include demolition of non structural partitions and ceiling. construction of new ceiling, power and finishes. mep, fire/life safety and fire sprinklers to be submitted separatelyDetails
suite 350: tenant improvement to include demolition of non structural partitions and ceiling. construction of new ceiling, power and finishes. mep, fire/life safety and fire sprinklers to be submitted separately | $150,000 |
| Sep 26, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | 10/fl-ste 1000-revision 202507080341- addition of storage roomDetails
10/fl-ste 1000-revision 202507080341- addition of storage room | $750 |
| Sep 18, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | suite #905: t.i. to include demolition of non-structural partitions and ceiling, construction and new partitions, ceiling, power and finishes. under a seperate permit: electrical, plumbing, mechanical, fire, life safty and fire sprinklers.Details
suite #905: t.i. to include demolition of non-structural partitions and ceiling, construction and new partitions, ceiling, power and finishes. under a seperate permit: electrical, plumbing, mechanical, fire, life safty and fire sprinklers. | $136,000 |
| Sep 3, 2025 | Completed final sign-off Jun 2026 | 369 Pine St | San Francisco Commercial Builders Inc | suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time.Details
suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time. | $136,000 |
| Sep 2, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended forDetails
suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended for | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit.Details
6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit. | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separatelyDetails
6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separately | $136,000 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | suite 1000 revision to pa #2025-0708-0341. change of ceiling from t-bar to opening ceiling.Details
suite 1000 revision to pa #2025-0708-0341. change of ceiling from t-bar to opening ceiling. | |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 220 Montgomery St | Field Construction Inc. | 10th/f ste# 1060: t.i. to included demo of non structural partitions & ceiling, construction of new partitions, ceiling, power & finihesDetails
10th/f ste# 1060: t.i. to included demo of non structural partitions & ceiling, construction of new partitions, ceiling, power & finihes | $136,000 |
| Jul 16, 2025 | Expired or cancelled withdrawn May 2026 | 220 Montgomery St | Field Construction Inc. | ste: 600 & 692. t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit.Details
ste: 600 & 692. t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit. | $136,000 |
| Jul 16, 2025 | Expired or cancelled withdrawn Aug 2025 | 220 Montgomery St | 4th/fl- ste 469- ti improvement to include demo of non structural partitions and ceiling; constructions of (n) partition, ceiling, power and finishes. mep, fire/safety/sprinklers to be submitted on a separate permit.Details
4th/fl- ste 469- ti improvement to include demo of non structural partitions and ceiling; constructions of (n) partition, ceiling, power and finishes. mep, fire/safety/sprinklers to be submitted on a separate permit. | $136,000 | |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 220 Montgomery St | Field Construction Inc. | suite 406 - ti improvement to include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. electrical, plumbing, fire/life/safety and fire sprinklers to be submitted under a separate permit.Details
suite 406 - ti improvement to include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. electrical, plumbing, fire/life/safety and fire sprinklers to be submitted under a separate permit. | $136,000 |
| Jul 16, 2025 | Expired or cancelled withdrawn Aug 2025 | 220 Montgomery St | suite 430: t.i. improvment to include demolitoin of on structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. elec, plumb,fire, life safety fire sprinklers to be submitted under sep permit.Details
suite 430: t.i. improvment to include demolitoin of on structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. elec, plumb,fire, life safety fire sprinklers to be submitted under sep permit. | $136,000 | |
| Jul 8, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | San Francisco Commercial Builders Inc | suite 1000/10th fl: t.i. improvement include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling , power and finishes. to be submitted under seperate permit-fire-life-safety, fire sprinklers, mechanical, electrical and plumbing.Details
suite 1000/10th fl: t.i. improvement include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling , power and finishes. to be submitted under seperate permit-fire-life-safety, fire sprinklers, mechanical, electrical and plumbing. | $136,000 |
| Apr 28, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | 4/fl- suite 424- ti to include demo of non structural partitions and ceiling. construction of (n) partitions ceiling power and finishes.Details
4/fl- suite 424- ti to include demo of non structural partitions and ceiling. construction of (n) partitions ceiling power and finishes. | $45,000 |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 333 Pine St | Field Construction Inc. | ste 300: 3rd fl tenant improvement to include demolition of non structural partitions and ceiling construction o new partitions, ceiling, power and finishes. misc upgrades on e 3rd fl restroom and elevator lobby. mei, fire, life safe and fire sprinklers shall be on a sep permit.Details
ste 300: 3rd fl tenant improvement to include demolition of non structural partitions and ceiling construction o new partitions, ceiling, power and finishes. misc upgrades on e 3rd fl restroom and elevator lobby. mei, fire, life safe and fire sprinklers shall be on a sep permit. | $136,000 |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 220 Montgomery St | Field Construction Inc. | 13/fl- ti to include demo of non structural partitions and celing, construction (n) partitions, ceiling, power and finishes. mep fire like safety and fire sprinkler under separate permitDetails
13/fl- ti to include demo of non structural partitions and celing, construction (n) partitions, ceiling, power and finishes. mep fire like safety and fire sprinkler under separate permit | $136,000 |
| Apr 10, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | 4/fl- ti for lounge (n) common area for tenants to include demo of no nstructrual partitions and ceiling construction of (n) partitions, ceilings, power and finishes. mep, fire/safety and fire sprinklers shall be on another permitDetails
4/fl- ti for lounge (n) common area for tenants to include demo of no nstructrual partitions and ceiling construction of (n) partitions, ceilings, power and finishes. mep, fire/safety and fire sprinklers shall be on another permit | $127,000 |
| Apr 9, 2025 | Completed final sign-off Nov 2025 | 220 Montgomery St | Field Construction Inc. | 11/fl- ste# 1120: ti to include demo of non structrual partitions and ceiling construction of (n) partitions, ceiling power and finishes. mep, fire life safety and fire sprinlers shall be on another permitDetails
11/fl- ste# 1120: ti to include demo of non structrual partitions and ceiling construction of (n) partitions, ceiling power and finishes. mep, fire life safety and fire sprinlers shall be on another permit | $136,000 |
| Mar 27, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permitsDetails
3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permits | $95,000 |
| Mar 5, 2025 | Completed final sign-off Aug 2025 | 220 Montgomery St | Field Construction Inc. | 14/fl- ti include demo of non sturcutral partitions and ceiling . construction of (n) partitions celing power and finishes. mep/fire/ fire safety/fire sprinklers under another permitDetails
14/fl- ti include demo of non sturcutral partitions and ceiling . construction of (n) partitions celing power and finishes. mep/fire/ fire safety/fire sprinklers under another permit | $136,000 |
| Mar 5, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | 9/fl- ti include demo of non sturcutral partitions and ceiling . construction of (n) partitions, celing, power and finishes. mep/fire/ fire safety/fire sprinklers under another permitDetails
9/fl- ti include demo of non sturcutral partitions and ceiling . construction of (n) partitions, celing, power and finishes. mep/fire/ fire safety/fire sprinklers under another permit | $136,000 |
| Dec 30, 2024 | Completed final sign-off May 2025 | 501 02nd St | Novo Construction Inc | suite 550- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes.Details
suite 550- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes. | $199,600 |
| Dec 30, 2024 | Completed final sign-off May 2025 | 501 02nd St | Novo Construction Inc | suite 575- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes.Details
suite 575- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes. | $216,000 |
| Dec 30, 2024 | Completed final sign-off May 2025 | 501 02nd St | Novo Construction Inc | suite 216- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes.Details
suite 216- ti to include demo of non structural partition and ceilings. construction of (n) partitions celing power and finishes. | $129,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 369 Pine St | San Francisco Commercial Builders Inc | 7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes.Details
7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. | $150,000 |
| Jun 5, 2024 | Completed final sign-off Nov 2024 | 220 Montgomery St | C C I Commercial Construction & Improv | 10th fl - ti to include demo of non structural partitions & ceiling; construction of new partitions, ceiling power & finishes. mep under separate permitDetails
10th fl - ti to include demo of non structural partitions & ceiling; construction of new partitions, ceiling power & finishes. mep under separate permit | $80,000 |
| Apr 26, 2024 | Completed final sign-off Dec 2024 | 220 Montgomery St | San Francisco Commercial Builders Inc | 16th fl tenant improvement to include demo of non structural partitions and ceiling, construction of new partitons, power and finishes. 1703 sf suite 1600Details
16th fl tenant improvement to include demo of non structural partitions and ceiling, construction of new partitons, power and finishes. 1703 sf suite 1600 | $136,000 |
| Jun 8, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | 19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a.Details
19/f: t.i. of office including demo of non-structural partitions and ceilings, new partitions, ceiling power and finishes. maher n/a. | $450,000 |
| Mar 9, 2023 | Completed final sign-off Aug 2024 | 3911 Alemany Bl | Ally Builder Llc | t.i. including demo of sales floor ceiling grid, tile and light fixtures, new power/d414 ceiling grid, tile, light fixtures, finishes and fixtures in sales fl. suites 102 & 103Details
t.i. including demo of sales floor ceiling grid, tile and light fixtures, new power/d414 ceiling grid, tile, light fixtures, finishes and fixtures in sales fl. suites 102 & 103 | $120,000 |
| Feb 3, 2021 | Never finaled issued Apr 2021, no final | 1 Powell St | Constructive Building Services Inc Dba C | g/f retail: no modification to any (e) walls, doores, path of travel, exiseting or historay elements. temporary installation of pre-manufactoured furniture fixture. maher n/a.Details
g/f retail: no modification to any (e) walls, doores, path of travel, exiseting or historay elements. temporary installation of pre-manufactoured furniture fixture. maher n/a. | $3,000 |
| Nov 7, 2020 | Completed final sign-off Oct 2021 | 2675 Geary Bl | Constructive Building Services Inc Dba C | new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel.Details
new non-bearing walls. updating (e) restroom to meet ada requirements. (n) ceiling and lighting, (n) power data and finishes, (n) electrical panel. | $80,000 |
| Jul 27, 2020 | Expired or cancelled cancelled Jun 2021 | 1 Powell St | Constructive Building Services Inc Dba C | raise (e) light fixture. temporarily install framing and art installation. common areaDetails
raise (e) light fixture. temporarily install framing and art installation. common area | $3,000 |
| Jul 6, 2020 | Completed final sign-off May 2021 | 1010 03rd St | Constructive Building Services Inc Dba C | revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit.Details
revision to pa# 2019-0612-3270. relocation of restroom. revised power data & finishes. sprinkler/fire alarm under sep permit. | $10,000 |
| Oct 23, 2019 | Never finaled issued Nov 2019, no final | 1 Powell St | Constructive Building Services Inc Dba C | partial ti of an existing retail store. interior work only: pre-fabricated temporary set walls, structural truss, new floor finishes. new retail fixtures and displays intended for temporary "friends" - themed promotional installationDetails
partial ti of an existing retail store. interior work only: pre-fabricated temporary set walls, structural truss, new floor finishes. new retail fixtures and displays intended for temporary "friends" - themed promotional installation | $68,000 |
| Jun 12, 2019 | Completed final sign-off May 2021 | 1010 03rd St | Constructive Building Services Inc Dba C | first time ti retail. new non-bearing walls. new accessible restrooms. new ceiling & lighting. new power/data and finishes.Details
first time ti retail. new non-bearing walls. new accessible restrooms. new ceiling & lighting. new power/data and finishes. | $85,000 |
| Apr 10, 2019 | Completed final sign-off Oct 2019 | 255 California St | Constructive Building Services Inc Dba C | new non bearing walls (mino) and new finishes, new power/data finishes no maherDetails
new non bearing walls (mino) and new finishes, new power/data finishes no maher | $10,000 |
| Aug 23, 2016 | Completed final sign-off Dec 2016 | 2490 San Bruno Av | Constructive Building Services Inc Dba C | interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher.Details
interior t.i. (cosmetic) finishes for new retail store. remove all radio shack finishes. n/a for maher. | $75,000 |
| Dec 2, 2015 | Never finaled issued Mar 2016, no final | 3251 20th Av | Finn Construction Inc | suite 204, 209 & 210 - demolition of interior tenants - removal of existing store front, non-bearing walls, mechanical distribution, electrical distribution, restrooms, millwrok. structural, mechanical units & electrical panels to remain. architectural, mep, l/s under separate permit.Details
suite 204, 209 & 210 - demolition of interior tenants - removal of existing store front, non-bearing walls, mechanical distribution, electrical distribution, restrooms, millwrok. structural, mechanical units & electrical panels to remain. architectural, mep, l/s under separate permit. | $15,000 |
| May 28, 2015 | Completed final sign-off Dec 2016 | 5644 Geary Bl | Constructive Building Services Inc Dba C | interior tenant improvement - finishes (remove old radio shack finishes & install new at&t finishes); maher n/aDetails
interior tenant improvement - finishes (remove old radio shack finishes & install new at&t finishes); maher n/a | $120,000 |
| Feb 28, 2011 | Completed final sign-off Dec 2011 | 425 Market St | Cb Bovenkamp Inc. | ground floor interior t.i. to include demo of (e) interior walls, construction of new interior walls, (1) ada compliant restroom. fire sprinkler, fire alarm, and mep under separate permits.Details
ground floor interior t.i. to include demo of (e) interior walls, construction of new interior walls, (1) ada compliant restroom. fire sprinkler, fire alarm, and mep under separate permits. | $271,221 |
| Feb 18, 2011 | Completed final sign-off Aug 2011 | 701 Market St | Cb Bovenkamp Inc. | 1st floor interior tenant improvement ot include demo of (e) interior walls, reconstruction of new interior partiiton walls, 2 ada compliant restrooms & associated plumbing, electrical & signage. mech, life safety, sprinkler, alarm under separate permit.Details
1st floor interior tenant improvement ot include demo of (e) interior walls, reconstruction of new interior partiiton walls, 2 ada compliant restrooms & associated plumbing, electrical & signage. mech, life safety, sprinkler, alarm under separate permit. | $200,000 |