Permit GraphShortlistSan Francisco building permits since 2000

Jessica Atal Nemerovski At

License
1071085
State contractor license record
Listed as
authorized agent-others, contractor, designer, pmt consultant/expediter
Firm
Harmony Design & Development Inc
Based in
Pacifica
On San Francisco permits
Aug 2020 to Mar 2026

64 permits since 2000 (contractor on 64 permits, authorized agent-others on 8 permits, designer on 2 permits, pmt consultant/expediter on 1 permit): 46 completed, 9 in progress, 6 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 31, 2026Completed
final sign-off Jun 2026
166 Desmond StHarmony Design & Development Increwire (e) outlets, switches & lights. add 14 new outlets. project inclues patch some plastic & painting for the home. no sprinkler system work
Details
Permit
202603318612
Status
complete
Filed
Mar 31, 2026
Permit issued
Mar 31, 2026
Final sign-off
Jun 4, 2026
Declared cost
$35,000
Address
166 Desmond St

rewire (e) outlets, switches & lights. add 14 new outlets. project inclues patch some plastic & painting for the home. no sprinkler system work

Open the permit page

$35,000
Feb 26, 2026In progress
issued Feb 2026
215 29th StHarmony Design & Development Inc, Boaz Mor Design & Constructionunit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations)
Details
Permit
202602266588
Status
issued
Filed
Feb 26, 2026
Permit issued
Feb 26, 2026
Address
215 29th St

unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations)

Open the permit page

Jan 22, 2026In progress
issued Apr 2026
561 Anderson StHarmony Design & Development Inc, Frederic Grasset Design-Buildrevision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditions
Details
Permit
202601224293
Status
issued
Filed
Jan 22, 2026
Permit issued
Apr 23, 2026
Address
561 Anderson St

revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditions

Open the permit page

Jan 16, 2026Completed
final sign-off Jan 2026
3676 17th StHarmony Design & Development Incto obtain final inspection for work approved under pa# 202408017767 & 202402095602. all work is complete.
Details
Permit
202601164037
Status
complete
Filed
Jan 16, 2026
Permit issued
Jan 16, 2026
Final sign-off
Jan 30, 2026
Address
3676 17th St

to obtain final inspection for work approved under pa# 202408017767 & 202402095602. all work is complete.

Open the permit page

Dec 9, 2025In progress
issued Dec 2025
241 Granville WyHarmony Design & Development Inc, We Do Construction Inc.2nd floor bathroom remodel in-kind, sink, shower pan, toilet.
Details
Permit
202512091288
Status
issued
Filed
Dec 9, 2025
Permit issued
Dec 9, 2025
Declared cost
$47,000
Address
241 Granville Wy

2nd floor bathroom remodel in-kind, sink, shower pan, toilet.

Open the permit page

$47,000
Dec 9, 2025In progress
issued Dec 2025
215 29th StHarmony Design & Development Inc, Boaz Mor Design & Constructionunit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.
Details
Permit
202512091286
Status
issued
Filed
Dec 9, 2025
Permit issued
Dec 9, 2025
Declared cost
$119,500
Address
215 29th St

unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.

Open the permit page

$119,500
Dec 2, 2025Completed
final sign-off Dec 2025
1660 Page StHarmony Design & Development Incto obtain final inspection for work approved under pa #202102124626. all work is complete.
Details
Permit
202512020711
Status
complete
Filed
Dec 2, 2025
Permit issued
Dec 2, 2025
Final sign-off
Dec 2, 2025
Declared cost
$15,000
Address
1660 Page St

to obtain final inspection for work approved under pa #202102124626. all work is complete.

Open the permit page

$15,000
Nov 14, 2025In progress
issued Dec 2025
10 Arbor StHarmony Design & Development Increvision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns
Details
Permit
202511149601
Status
issued
Filed
Nov 14, 2025
Permit issued
Dec 29, 2025
Declared cost
$48,000
Address
10 Arbor St

revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns

Open the permit page

$48,000
Sep 4, 2025In progress
issued Dec 2025
1 Country Club DrLy Green Construction Inc, Harmony Design & Development Increvision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other
Details
Permit
202509044529
Status
issued
Filed
Sep 4, 2025
Permit issued
Dec 9, 2025
Address
1 Country Club Dr

revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other

Open the permit page

Jul 21, 2025In progress
issued Jul 2025
10 Arbor StHarmony Design & Development Incfull remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kind
Details
Permit
202507211224
Status
issued
Filed
Jul 21, 2025
Permit issued
Jul 21, 2025
Declared cost
$110,000
Address
10 Arbor St

full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kind

Open the permit page

$110,000
Jun 10, 2025Completed
final sign-off Oct 2025
1501 Filbert StHarmony Design & Development Incunit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features.
Details
Permit
202506108318
Status
complete
Filed
Jun 10, 2025
Permit issued
Jun 10, 2025
Final sign-off
Oct 23, 2025
Declared cost
$57,000
Address
1501 Filbert St

unit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features.

Open the permit page

$57,000
Apr 9, 2025Completed
final sign-off Oct 2025
1501 Filbert StHarmony Design & Development Incunit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind.
Details
Permit
202504094066
Status
complete
Filed
Apr 9, 2025
Permit issued
Apr 9, 2025
Final sign-off
Oct 23, 2025
Declared cost
$80,000
Address
1501 Filbert St

unit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind.

Open the permit page

$80,000
Apr 8, 2025In progress
issued Apr 2025
1 Country Club DrLy Green Construction Inc, Harmony Design & Development Increnovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.
Details
Permit
202504083895
Status
issued
Filed
Apr 8, 2025
Permit issued
Apr 10, 2025
Declared cost
$123,000
Address
1 Country Club Dr

renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.

Open the permit page

$123,000
Feb 13, 2025Completed
final sign-off May 2025
3524 Quintara StHarmony Design & Development Increvision 202403228403- replace (e) gas water heater to gas tankless water heater. update title 24- remove hers inspections add skylight over bedroom at rear not visible from street. add parapet. update structural framing
Details
Permit
202502130249
Status
complete
Filed
Feb 13, 2025
Permit issued
Mar 27, 2025
Final sign-off
May 30, 2025
Declared cost
$1,000
Address
3524 Quintara St

revision 202403228403- replace (e) gas water heater to gas tankless water heater. update title 24- remove hers inspections add skylight over bedroom at rear not visible from street. add parapet. update structural framing

Open the permit page

$1,000
Feb 4, 2025In progress
issued May 2025
561 Anderson StHarmony Design & Development Inc, Frederic Grasset Design-Build1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....
Details
Permit
202411134888
Status
issued
Filed
Feb 4, 2025
Permit issued
May 15, 2025
Declared cost
$235,000
Address
561 Anderson St

1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....

Open the permit page

$235,000
Dec 13, 2024Completed
final sign-off Sep 2025
2111 21st AvHarmony Design & Development Increvision to 202411044282" update holdown & anchor of threaded rods into new concrete. remove pull test specail inspection, reinforce rear 1st fl framing over crawl space
Details
Permit
202412136775
Status
complete
Filed
Dec 13, 2024
Permit issued
Mar 27, 2025
Final sign-off
Sep 16, 2025
Address
2111 21st Av

revision to 202411044282" update holdown & anchor of threaded rods into new concrete. remove pull test specail inspection, reinforce rear 1st fl framing over crawl space

Open the permit page

Nov 15, 2024Completed
final sign-off Dec 2024
561 Anderson StHarmony Design & Development Incto obtain final inspection for work approved under 9419411. all work is complete
Details
Permit
202411155088
Status
complete
Filed
Nov 15, 2024
Permit issued
Nov 18, 2024
Final sign-off
Dec 27, 2024
Address
561 Anderson St

to obtain final inspection for work approved under 9419411. all work is complete

Open the permit page

Nov 4, 2024Completed
final sign-off Sep 2025
2111 21st AvHarmony Design & Development Incresidential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroom
Details
Permit
202411044282
Status
complete
Filed
Nov 4, 2024
Permit issued
Nov 18, 2024
Final sign-off
Sep 16, 2025
Declared cost
$92,000
Address
2111 21st Av

residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroom

Open the permit page

$92,000
Aug 1, 2024Expired or cancelled
expired Jan 2026
3676 17th StHarmony Design & Development Increvision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.
Details
Permit
202408017767
Status
expired
Filed
Aug 1, 2024
Permit issued
Sep 19, 2024
Declared cost
$10,000
Address
3676 17th St

revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.

Open the permit page

$10,000
Jun 11, 2024Completed
final sign-off Sep 2024
2 Mountain Spring AvHarmony Design & Development Incfull guest bathroom remodel
Details
Permit
202406114165
Status
complete
Filed
Jun 11, 2024
Permit issued
Jun 11, 2024
Final sign-off
Sep 4, 2024
Declared cost
$38,500
Address
2 Mountain Spring Av

full guest bathroom remodel

Open the permit page

$38,500
May 7, 2024Completed
final sign-off Jul 2025
108 Congdon StHarmony Design & Development Increplace (2) 2nd floor front windows in kind, (3) 2nd floor rear windows in kind, replace (e) hardie siding at north (approx. 250 sq ft.) and west side (approx. 350 sq ft.) of property ( not facing street) in kind. all windows in the same opening.
Details
Permit
202405071614
Status
complete
Filed
May 7, 2024
Permit issued
May 24, 2024
Final sign-off
Jul 11, 2025
Declared cost
$43,000
Address
108 Congdon St

replace (2) 2nd floor front windows in kind, (3) 2nd floor rear windows in kind, replace (e) hardie siding at north (approx. 250 sq ft.) and west side (approx. 350 sq ft.) of property ( not facing street) in kind. all windows in the same opening.

Open the permit page

$43,000
May 7, 2024Completed
final sign-off Jul 2025
108 Congdon StHarmony Design & Development Increv 202403087403- upgrade rear framing and foundation of 1-story rear popout structure capture (e) framing condition exposed during construction revised scope of work 5/16/24-add infill crawl space exterior walls (3 sides at rear)
Details
Permit
202405071613
Status
complete
Filed
May 7, 2024
Permit issued
May 24, 2024
Final sign-off
Jul 23, 2025
Declared cost
$49,000
Address
108 Congdon St

rev 202403087403- upgrade rear framing and foundation of 1-story rear popout structure capture (e) framing condition exposed during construction revised scope of work 5/16/24-add infill crawl space exterior walls (3 sides at rear)

Open the permit page

$49,000
Mar 22, 2024Completed
final sign-off May 2025
3524 Quintara StHarmony Design & Development Inc1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgrades
Details
Permit
202403228403
Status
complete
Filed
Mar 22, 2024
Permit issued
Apr 15, 2024
Final sign-off
May 30, 2025
Declared cost
$121,000
Address
3524 Quintara St

1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgrades

Open the permit page

$121,000
Mar 8, 2024Completed
final sign-off Jul 2025
108 Congdon StHarmony Design & Development Incresidential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades.
Details
Permit
202403087403
Status
complete
Filed
Mar 8, 2024
Permit issued
Mar 14, 2024
Final sign-off
Jul 23, 2025
Declared cost
$82,000
Address
108 Congdon St

residential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades.

Open the permit page

$82,000
Mar 7, 2024Completed
final sign-off Apr 2024
154 Everson StHarmony Design & Development Incfull bath remodel in kind.
Details
Permit
202403077285
Status
complete
Filed
Mar 7, 2024
Permit issued
Mar 7, 2024
Final sign-off
Apr 19, 2024
Declared cost
$34,000
Address
154 Everson St

full bath remodel in kind.

Open the permit page

$34,000
Feb 9, 2024Expired or cancelled
expired Jan 2026
3676 17th StHarmony Design & Development Increvision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below.
Details
Permit
202402095602
Status
expired
Filed
Feb 9, 2024
Permit issued
Mar 7, 2024
Declared cost
$20,000
Address
3676 17th St

revision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below.

Open the permit page

$20,000
Jan 3, 2024Completed
final sign-off Feb 2024
965 Elizabeth StHarmony Design & Development Incone bathroom remodel, non structural
Details
Permit
202401033349
Status
complete
Filed
Jan 3, 2024
Permit issued
Jan 3, 2024
Final sign-off
Feb 22, 2024
Declared cost
$38,500
Address
965 Elizabeth St

one bathroom remodel, non structural

Open the permit page

$38,500
Oct 17, 2023Completed
final sign-off Jul 2024
166 Desmond StHarmony Design & Development Incremodel (e) bathroom on 2nd fl, per plans.
Details
Permit
202310178788
Status
complete
Filed
Oct 17, 2023
Permit issued
Oct 24, 2023
Final sign-off
Jul 9, 2024
Declared cost
$10,000
Address
166 Desmond St

remodel (e) bathroom on 2nd fl, per plans.

Open the permit page

$10,000
Aug 25, 2023Completed
final sign-off Jan 2024
54 Valmar TrHarmony Design & Development Incbathroom remodel in kind. kitchen remodel in kind. no structural work
Details
Permit
202308255330
Status
complete
Filed
Aug 25, 2023
Permit issued
Aug 25, 2023
Final sign-off
Jan 11, 2024
Declared cost
$90,000
Address
54 Valmar Tr

bathroom remodel in kind. kitchen remodel in kind. no structural work

Open the permit page

$90,000
Aug 24, 2023Completed
final sign-off Jun 2024
451 Somerset StHarmony Design & Development Increvision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room.
Details
Permit
202308245108
Status
complete
Filed
Aug 24, 2023
Permit issued
Aug 25, 2023
Final sign-off
Jun 20, 2024
Declared cost
$8,000
Address
451 Somerset St

revision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room.

Open the permit page

$8,000
Jul 18, 2023Never finaled
issued Jul 2023, no final
3452 Cabrillo StHarmony Design & Development Inc, Turley Constructionfull 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.
Details
Permit
202307182414
Status
issued
Filed
Jul 18, 2023
Permit issued
Jul 18, 2023
Declared cost
$115,000
Address
3452 Cabrillo St

full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.

Open the permit page

$115,000
May 31, 2023Completed
final sign-off Sep 2023
676 Page StHarmony Design & Development Incinterior remodel in unit 676 page st. remodel existing bathroom (4th fl)
Details
Permit
202305318911
Status
complete
Filed
May 31, 2023
Permit issued
Jun 14, 2023
Final sign-off
Sep 5, 2023
Declared cost
$12,000
Address
676 Page St

interior remodel in unit 676 page st. remodel existing bathroom (4th fl)

Open the permit page

$12,000
May 24, 2023Completed
final sign-off May 2025
1779 08th AvHarmony Design & Development Increvision to pa# 202302212270, construction revealed new door opening at rear ground flr wall penetrated an extg plywood shearwall. install new plywood shearwall along same wall to compensate for loss of shear strengthening.
Details
Permit
202305248463
Status
complete
Filed
May 24, 2023
Permit issued
May 24, 2023
Final sign-off
May 27, 2025
Declared cost
$1,250
Address
1779 08th Av

revision to pa# 202302212270, construction revealed new door opening at rear ground flr wall penetrated an extg plywood shearwall. install new plywood shearwall along same wall to compensate for loss of shear strengthening.

Open the permit page

$1,250
Apr 4, 2023Completed
final sign-off Jul 2023
3295 Clay StHarmony Design & Development Inckitchen remodel in kind, no work to smoke detectors. no wall alteration.
Details
Permit
202304044984
Status
complete
Filed
Apr 4, 2023
Permit issued
Apr 4, 2023
Final sign-off
Jul 6, 2023
Declared cost
$62,350
Address
3295 Clay St

kitchen remodel in kind, no work to smoke detectors. no wall alteration.

Open the permit page

$62,350
Mar 28, 2023Never finaled
issued Mar 2023, no final
209 Quintara StHarmony Design & Development Increvision to 202210114047: no work on shear wall
Details
Permit
202303284535
Status
issued
Filed
Mar 28, 2023
Permit issued
Mar 28, 2023
Address
209 Quintara St

revision to 202210114047: no work on shear wall

Open the permit page

Mar 14, 2023Completed
final sign-off Jun 2023
370 Maynard StHarmony Design & Development Incone full bath remodel. in kind. no wall changes.
Details
Permit
202303143627
Status
complete
Filed
Mar 14, 2023
Permit issued
Mar 14, 2023
Final sign-off
Jun 6, 2023
Declared cost
$29,000
Address
370 Maynard St

one full bath remodel. in kind. no wall changes.

Open the permit page

$29,000
Feb 21, 2023Completed
final sign-off May 2025
1779 08th AvHarmony Design & Development Incconvert rear garage space into (2) unconditioned storage room, add bathroom
Details
Permit
202302212270
Status
complete
Filed
Feb 21, 2023
Permit issued
Mar 9, 2023
Final sign-off
May 27, 2025
Declared cost
$38,000
Address
1779 08th Av

convert rear garage space into (2) unconditioned storage room, add bathroom

Open the permit page

$38,000
Dec 6, 2022Completed
final sign-off Jan 2026
3676 17th StHarmony Design & Development Incpartially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.
Details
Permit
202212067705
Status
complete
Filed
Dec 6, 2022
Permit issued
Jan 17, 2024
Final sign-off
Jan 30, 2026
Declared cost
$325,000
Address
3676 17th St

partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.

Open the permit page

$325,000
Oct 28, 2022Completed
final sign-off Jan 2024
451 Somerset StHarmony Design & Development Inckitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code.
Details
Permit
202210285372
Status
complete
Filed
Oct 28, 2022
Permit issued
Nov 10, 2022
Final sign-off
Jan 24, 2024
Declared cost
$82,000
Address
451 Somerset St

kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code.

Open the permit page

$82,000
Oct 11, 2022Never finaled
issued Oct 2022, no final
209 Quintara StHarmony Design & Development Increvision to pa 2020-0821-2317 existing ground floor structural post @ rear storage to remain, therefore no new steel beam required. seismic system to remain. reconfigure ground floor layout. proposed rear landscaping unchanged. keep concrete slab.
Details
Permit
202210114047
Status
issued
Filed
Oct 11, 2022
Permit issued
Oct 24, 2022
Address
209 Quintara St

revision to pa 2020-0821-2317 existing ground floor structural post @ rear storage to remain, therefore no new steel beam required. seismic system to remain. reconfigure ground floor layout. proposed rear landscaping unchanged. keep concrete slab.

Open the permit page

Jul 12, 2022Completed
final sign-off Feb 2024
650 36th AvHarmony Design & Development Increvision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall.
Details
Permit
202207128240
Status
complete
Filed
Jul 12, 2022
Permit issued
Sep 13, 2022
Final sign-off
Feb 29, 2024
Address
650 36th Av

revision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall.

Open the permit page

Jun 2, 2022Completed
final sign-off Oct 2022
3341 Jackson StHarmony Design & Development Inchallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom.
Details
Permit
202206025510
Status
complete
Filed
Jun 2, 2022
Permit issued
Jun 9, 2022
Final sign-off
Oct 6, 2022
Declared cost
$25,000
Address
3341 Jackson St

hallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom.

Open the permit page

$25,000
May 27, 2022Completed
final sign-off Jul 2022
134 Nevada StHarmony Design & Development Incbathroom remodel in-kind. no relocations, no changes to smoke detectors.
Details
Permit
202205275173
Status
complete
Filed
May 27, 2022
Permit issued
May 27, 2022
Final sign-off
Jul 8, 2022
Declared cost
$39,500
Address
134 Nevada St

bathroom remodel in-kind. no relocations, no changes to smoke detectors.

Open the permit page

$39,500
May 3, 2022Completed
final sign-off Sep 2022
330 Arguello BlHarmony Design & Development Incunit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers.
Details
Permit
202205033470
Status
complete
Filed
May 3, 2022
Permit issued
Jun 30, 2022
Final sign-off
Sep 14, 2022
Declared cost
$45,500
Address
330 Arguello Bl

unit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers.

Open the permit page

$45,500
Apr 25, 2022Completed
final sign-off Dec 2022
1860 Page StHarmony Design & Development Inchallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system.
Details
Permit
202204252895
Status
complete
Filed
Apr 25, 2022
Permit issued
Sep 30, 2022
Final sign-off
Dec 20, 2022
Declared cost
$67,000
Address
1860 Page St

hallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system.

Open the permit page

$67,000
Apr 21, 2022Completed
final sign-off Jan 2023
66 Bret Harte TrHarmony Design & Development Incfull remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed.
Details
Permit
202204212711
Status
complete
Filed
Apr 21, 2022
Permit issued
Sep 30, 2022
Final sign-off
Jan 19, 2023
Declared cost
$39,000
Address
66 Bret Harte Tr

full remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed.

Open the permit page

$39,000
Apr 21, 2022Completed
final sign-off Oct 2022
1290 45th AvHarmony Design & Development Incbathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers.
Details
Permit
202204212677
Status
complete
Filed
Apr 21, 2022
Permit issued
Jul 28, 2022
Final sign-off
Oct 7, 2022
Declared cost
$34,500
Address
1290 45th Av

bathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers.

Open the permit page

$34,500
Mar 28, 2022Completed
final sign-off Sep 2023
370 Maynard StHarmony Design & Development Inc1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kind
Details
Permit
202203281019
Status
complete
Filed
Mar 28, 2022
Permit issued
Apr 18, 2022
Final sign-off
Sep 1, 2023
Declared cost
$30,000
Address
370 Maynard St

1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kind

Open the permit page

$30,000
Mar 28, 2022Never finaled
issued Apr 2022, no final
124 Nevada StHarmony Design & Development Incbathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind.
Details
Permit
202203281020
Status
issued
Filed
Mar 28, 2022
Permit issued
Apr 18, 2022
Declared cost
$39,500
Address
124 Nevada St

bathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind.

Open the permit page

$39,500
Dec 15, 2021Completed
final sign-off Apr 2023
1559 Jerrold AvHarmony Design & Development Inchallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire system
Details
Permit
202112154480
Status
complete
Filed
Dec 15, 2021
Permit issued
Jan 13, 2022
Final sign-off
Apr 28, 2023
Declared cost
$27,000
Address
1559 Jerrold Av

hallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire system

Open the permit page

$27,000
Dec 15, 2021Never finaled
issued Jan 2022, no final
51 Oakwood StHarmony Design & Development Incfull bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier)
Details
Permit
202112154482
Status
issued
Filed
Dec 15, 2021
Permit issued
Jan 13, 2022
Declared cost
$90,000
Address
51 Oakwood St

full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier)

Open the permit page

$90,000
Dec 15, 2021Completed
final sign-off Apr 2023
1559 Jerrold AvHarmony Design & Development Inchallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system.
Details
Permit
202112154479
Status
complete
Filed
Dec 15, 2021
Permit issued
Jan 13, 2022
Final sign-off
Apr 28, 2023
Declared cost
$30,000
Address
1559 Jerrold Av

hallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system.

Open the permit page

$30,000
Dec 10, 2021Completed
final sign-off Feb 2024
650 36th AvHarmony Design & Development Incinterior remodel and lightwell infill.
Details
Permit
202112104187
Status
complete
Filed
Dec 10, 2021
Permit issued
Apr 12, 2022
Final sign-off
Feb 29, 2024
Declared cost
$50,000
Address
650 36th Av

interior remodel and lightwell infill.

Open the permit page

$50,000
Sep 3, 2021Completed
final sign-off Nov 2021
850 45th AvHarmony Design & Development Incremodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k)
Details
Permit
202109037741
Status
complete
Filed
Sep 3, 2021
Permit issued
Sep 3, 2021
Final sign-off
Nov 15, 2021
Declared cost
$28,400
Address
850 45th Av

remodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k)

Open the permit page

$28,400
Aug 16, 2021Completed
final sign-off Nov 2021
850 45th AvHarmony Design & Development Incremodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers.
Details
Permit
202108166460
Status
complete
Filed
Aug 16, 2021
Permit issued
Sep 3, 2021
Final sign-off
Nov 15, 2021
Declared cost
$34,600
Address
850 45th Av

remodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers.

Open the permit page

$34,600
Jun 9, 2021Completed
final sign-off Jan 2022
2114 Wawona StHarmony Design & Development Incnew bathroom @ 1/f
Details
Permit
202106092036
Status
complete
Filed
Jun 9, 2021
Permit issued
Sep 23, 2021
Final sign-off
Jan 24, 2022
Declared cost
$10,000
Address
2114 Wawona St

new bathroom @ 1/f

Open the permit page

$10,000
Apr 29, 2021Completed
final sign-off Feb 2022
2114 Wawona StHarmony Design & Development Inckitchen remodel in kind
Details
Permit
202104299537
Status
complete
Filed
Apr 29, 2021
Permit issued
Apr 29, 2021
Final sign-off
Feb 4, 2022
Declared cost
$43,800
Address
2114 Wawona St

kitchen remodel in kind

Open the permit page

$43,800
Apr 29, 2021Completed
final sign-off Oct 2021
850 Guerrero StHarmony Design & Development Incremodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondary
Details
Permit
202104299533
Status
complete
Filed
Apr 29, 2021
Permit issued
Apr 29, 2021
Final sign-off
Oct 15, 2021
Declared cost
$93,000
Address
850 Guerrero St

remodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondary

Open the permit page

$93,000
Feb 24, 2021Completed
final sign-off Aug 2021
3016 20th AvHarmony Design & Development Incconvert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated.
Details
Permit
202102245210
Status
complete
Filed
Feb 24, 2021
Permit issued
Jun 15, 2021
Final sign-off
Aug 27, 2021
Declared cost
$29,000
Address
3016 20th Av

convert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated.

Open the permit page

$29,000
Feb 16, 2021Completed
final sign-off Feb 2022
2114 Wawona StHarmony Design & Development Incfull bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan.
Details
Permit
202102164666
Status
complete
Filed
Feb 16, 2021
Permit issued
Feb 16, 2021
Final sign-off
Feb 4, 2022
Declared cost
$28,000
Address
2114 Wawona St

full bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan.

Open the permit page

$28,000
Feb 12, 2021Expired or cancelled
expired Dec 2025
1660 Page StHarmony Design & Development Increbuild extg exterior stair of rear of extg structural with new code compliant guard rail.
Details
Permit
202102124626
Status
expired
Filed
Feb 12, 2021
Permit issued
Sep 29, 2021
Declared cost
$15,000
Address
1660 Page St

rebuild extg exterior stair of rear of extg structural with new code compliant guard rail.

Open the permit page

$15,000
Feb 4, 2021Completed
final sign-off Jun 2021
2011 03rd StHarmony Design & Development Incfull bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms.
Details
Permit
202102043961
Status
complete
Filed
Feb 4, 2021
Permit issued
Feb 4, 2021
Final sign-off
Jun 3, 2021
Declared cost
$23,000
Address
2011 03rd St

full bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms.

Open the permit page

$23,000
Jan 4, 2021Completed
final sign-off Sep 2021
875 South Van Ness AvHarmony Design & Development Incunit 875: remodel existing bathroom & kitchen. add master bathroom.
Details
Permit
202101042022
Status
complete
Filed
Jan 4, 2021
Permit issued
Mar 3, 2021
Final sign-off
Sep 20, 2021
Declared cost
$25,000
Address
875 South Van Ness Av

unit 875: remodel existing bathroom & kitchen. add master bathroom.

Open the permit page

$25,000
Aug 21, 2020Never finaled
issued Nov 2021, no final
209 Quintara StA-1 Dynamic Builders Inc., Harmony Design & Development Incinterior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath.
Details
Permit
202008212317
Status
issued
Filed
Aug 21, 2020
Permit issued
Nov 19, 2021
Declared cost
$50,000
Address
209 Quintara St

interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath.

Open the permit page

$50,000