A-1 Dynamic Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Jul 2026
- Last 24 months
- 6 permits filed
43 permits since 2000: 29 completed, 6 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Aug 2026 | 226 Louisburg St | to obtain final inspection for work approved under pa# 202407186748. all work is complete.Details
to obtain final inspection for work approved under pa# 202407186748. all work is complete. | |
| Dec 22, 2025 | In progress issued Dec 2025 | 217 Gold Mine Dr | revision to pa # 2024-0912-0592. convert existing office and gym to new bedroom. new hydronic radiant floor at living room. revise exterior window sizes & types on all building elevations. add a new planter balcony at level 2.Details
revision to pa # 2024-0912-0592. convert existing office and gym to new bedroom. new hydronic radiant floor at living room. revise exterior window sizes & types on all building elevations. add a new planter balcony at level 2. | $2,000 |
| Aug 11, 2025 | In progress issued Dec 2025 | 3713 Lawton St | addition new adu; add roof decks along east and west w/interior space created within the new barrel vault roof. new barrel vault roof will exceed 35ft height limit by measurement equal to 50% said height limit to finihsed floor; add rear bump outs to 2/f & 3/f; add rear decks. move front door.Details
addition new adu; add roof decks along east and west w/interior space created within the new barrel vault roof. new barrel vault roof will exceed 35ft height limit by measurement equal to 50% said height limit to finihsed floor; add rear bump outs to 2/f & 3/f; add rear decks. move front door. | $450,000 |
| Jul 2, 2025 | In progress issued Jul 2025 | 217 Gold Mine Dr | revision to pa # 2024-0912-0592. interior post removalDetails
revision to pa # 2024-0912-0592. interior post removal | |
| Jun 13, 2025 | Completed final sign-off Sep 2026 | 217 Gold Mine Dr | shoring permit. deffered submittal to permit pa #202409120592Details
shoring permit. deffered submittal to permit pa #202409120592 | |
| Mar 26, 2025 | In progress issued May 2025 | 226 Louisburg St | rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location.Details
rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location. | |
| Sep 12, 2024 | In progress issued May 2025 | 217 Gold Mine Dr | (n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase.Details
(n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase. | $300,000 |
| Sep 6, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | revision to pa #202408198977 and 202401244520. new opening in center line wallDetails
revision to pa #202408198977 and 202401244520. new opening in center line wall | |
| Aug 19, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | revision to 202401244520 partial voluntary rebuild of existing foundation. no work visible from street. strengthening of ground floor.Details
revision to 202401244520 partial voluntary rebuild of existing foundation. no work visible from street. strengthening of ground floor. | $30,000 |
| Jun 11, 2024 | Completed final sign-off Jul 2024 | 1594 42nd Av | remodel ground floor bathroom. convert bathtub to shower tub. no removal of wallsDetails
remodel ground floor bathroom. convert bathtub to shower tub. no removal of walls | $12,000 |
| May 21, 2024 | Expired or cancelled cancelled Jan 2026 | 901 Taraval St | awning removal and patch work area.Details
awning removal and patch work area. | $8,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | partial voluntary rebuild of existing foundation. no work visible from the streetDetails
partial voluntary rebuild of existing foundation. no work visible from the street | $20,000 |
| Oct 19, 2023 | Completed final sign-off Oct 2024 | 630 Moscow St | enclose light court. remodel kitchen and a bathroom, add a full bath on the 2nd fl. add a rear deck access from 2nd fl. add two bedrooms, a media rm, two full baths on the 1st fl. upgrade main service to 200 amp. new furnace & takless wh. two new skylights.Details
enclose light court. remodel kitchen and a bathroom, add a full bath on the 2nd fl. add a rear deck access from 2nd fl. add two bedrooms, a media rm, two full baths on the 1st fl. upgrade main service to 200 amp. new furnace & takless wh. two new skylights. | $140,000 |
| Aug 22, 2023 | Completed final sign-off Jan 2024 | 1839 26th Av | to comply with nov# 202307090. new rear deck.Details
to comply with nov# 202307090. new rear deck. | $8,500 |
| Jul 18, 2023 | Completed final sign-off Jul 2023 | 711 19th Av | two bath remodels. non structural upgrade in-kind water conservation toilet. vanity faucet, and energy efficient vanity led light in 1st fl storage & floor hallway bathroom.Details
two bath remodels. non structural upgrade in-kind water conservation toilet. vanity faucet, and energy efficient vanity led light in 1st fl storage & floor hallway bathroom. | |
| Jun 13, 2023 | Completed final sign-off Apr 2024 | 1025 Bay Shore Bl | legalize unpermitted rooms on 1/f; interior remodel include: 1st fl convert (e) playroom into bedroom. convert (e) storage into full bathroom. add 1 foyer. replace drywall. rooms down & add 2 bathrooms; no work at 2nd floor; relocate furnace & water heater.Details
legalize unpermitted rooms on 1/f; interior remodel include: 1st fl convert (e) playroom into bedroom. convert (e) storage into full bathroom. add 1 foyer. replace drywall. rooms down & add 2 bathrooms; no work at 2nd floor; relocate furnace & water heater. | $40,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 1547 40th Av | remodel (3)(e) bathrooms, (1) kitchen, update electrical/main panel to 200 amp, plumbing, furnace. remove wall between kitchen/living room @ 2/f, install new beam & postsDetails
remodel (3)(e) bathrooms, (1) kitchen, update electrical/main panel to 200 amp, plumbing, furnace. remove wall between kitchen/living room @ 2/f, install new beam & posts | $5,000 |
| May 16, 2023 | Completed final sign-off Aug 2024 | 3040 22nd Av | voluntary structural strengthening install one steel frame in garageDetails
voluntary structural strengthening install one steel frame in garage | $30,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2023 | 4647 25th St | remodel 2 bathroom and 1 kitchen. no walls removed and recessed.Details
remodel 2 bathroom and 1 kitchen. no walls removed and recessed. | $45,000 |
| Mar 21, 2023 | Expired or cancelled cancelled Jun 2023 | 1547 40th Av | for administrative purposes to correct address for bpa#202303103485 (incorrect address 1762 42nd avenue to correct address 1547 40th avenue)Details
for administrative purposes to correct address for bpa#202303103485 (incorrect address 1762 42nd avenue to correct address 1547 40th avenue) | |
| Mar 21, 2023 | Completed final sign-off Jul 2023 | 711 19th Av | remodel kitchen, new countertop, sink and recessed lightingsDetails
remodel kitchen, new countertop, sink and recessed lightings | $15,000 |
| Mar 10, 2023 | Expired or cancelled cancelled Jun 2023 | 1762 42nd Av | remodel 3 (e) bathrooms & 1 kitchen. update electrical, plumbing & furnance. upgrade main electrical to 200 amp. no wall/framing changeDetails
remodel 3 (e) bathrooms & 1 kitchen. update electrical, plumbing & furnance. upgrade main electrical to 200 amp. no wall/framing change | $56,000 |
| Mar 7, 2023 | Completed final sign-off Jul 2024 | 1219 Gilman Av | remodel (e) kitchen, bathroom. construct 1 full bathroom. replace (e) sheet rock w/ new & replace (4) window in-kind at 2/f. remodel (e) bedroom. convert half bathtoom to full bathroom at 3/f.Details
remodel (e) kitchen, bathroom. construct 1 full bathroom. replace (e) sheet rock w/ new & replace (4) window in-kind at 2/f. remodel (e) bedroom. convert half bathtoom to full bathroom at 3/f. | $148,000 |
| Feb 23, 2023 | Completed final sign-off Mar 2023 | 556 46th Av | demolishing and replacing existing back stair.Details
demolishing and replacing existing back stair. | $1,000 |
| Dec 9, 2022 | Completed final sign-off Apr 2024 | 35 Carr St | 1/f: add a family room, 2 bedrooms and 2 full bathrooms. relocate furnance, water heater, washer and dryer.Details
1/f: add a family room, 2 bedrooms and 2 full bathrooms. relocate furnance, water heater, washer and dryer. | $60,000 |
| Nov 16, 2022 | Completed final sign-off Mar 2024 | 1127 Moraga St | relocate kitchen, remodel bathroom, add new bathroom and remove light court on the 2nd fl. replace deck off 2nd fl. add family rm w/ wet bar, bedroom, media rm, and bathroom on the 1st fl. relocated furnace, water heater, washer/dryer. install (2) skylights.Details
relocate kitchen, remodel bathroom, add new bathroom and remove light court on the 2nd fl. replace deck off 2nd fl. add family rm w/ wet bar, bedroom, media rm, and bathroom on the 1st fl. relocated furnace, water heater, washer/dryer. install (2) skylights. | $150,000 |
| Sep 22, 2022 | Completed final sign-off May 2023 | 825 Woolsey St | convert (e) garage space to play area with new sliding door.Details
convert (e) garage space to play area with new sliding door. | $68,000 |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 825 Woolsey St | one kitchen remodel in-kind. no wall removal.Details
one kitchen remodel in-kind. no wall removal. | $18,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 205 Lake Merced Hill St North St | remodel 2 bathrooms, 1 kitchen, 1 powder room. paint interior. upgrade interior electrical. remodel in kind, no wall changes. no layout changes.Details
remodel 2 bathrooms, 1 kitchen, 1 powder room. paint interior. upgrade interior electrical. remodel in kind, no wall changes. no layout changes. | $88,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 557 Duncan St | 1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard.Details
1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard. | $250,000 |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 39 Dashiell Hammett St | remodel 2 bath, 1 kitchen, 1 laundry. update hallway & entry lighting. no removal of wallsDetails
remodel 2 bath, 1 kitchen, 1 laundry. update hallway & entry lighting. no removal of walls | $45,000 |
| Jan 5, 2022 | Expired or cancelled cancelled Jan 2026 | 556 46th Av | remove all plaster, temporaryDetails
remove all plaster, temporary | $500 |
| Dec 21, 2021 | Completed final sign-off May 2023 | 556 46th Av | full house remodel, kitchen, 2 full baths, 1 power room, electrical, plumbing, mechanical upgrade, replace windows in-kind. and comply with nov 202178263: remove light post.Details
full house remodel, kitchen, 2 full baths, 1 power room, electrical, plumbing, mechanical upgrade, replace windows in-kind. and comply with nov 202178263: remove light post. | $118,000 |
| Dec 16, 2021 | Completed final sign-off Feb 2022 | 1675 29th Av | kitchen and bathroom remodel in the same location. new cabinets, coutertops, vanity, sink, lights, tiles and flooring. no wall removal.Details
kitchen and bathroom remodel in the same location. new cabinets, coutertops, vanity, sink, lights, tiles and flooring. no wall removal. | $20,000 |
| Dec 24, 2020 | Completed final sign-off Mar 2022 | 1219 Quesada Av | doing a remodel at ground floor. convert garage into habitable space. 410 sf total, and add 2 bedrooms and 1 full bathroom. add shear walls. replace water heater with tankless water heater.Details
doing a remodel at ground floor. convert garage into habitable space. 410 sf total, and add 2 bedrooms and 1 full bathroom. add shear walls. replace water heater with tankless water heater. | $80,000 |
| Oct 19, 2020 | Completed final sign-off Aug 2021 | 510 Dellbrook Av | relocate kitchen, dining room, bedroom, bathroom, and laundry.Details
relocate kitchen, dining room, bedroom, bathroom, and laundry. | $35,000 |
| Aug 21, 2020 | Never finaled issued Nov 2021, no final | 209 Quintara St | interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath.Details
interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath. | $50,000 |
| Jun 5, 2020 | Never finaled issued Dec 2021, no final | 626 Banks St | create one new adu (accessory dwelling unit) per ordinance no. 162-16. at ground floor of existing singe family dwelling. modify the interior of the existing second floor kitchen, provide new second floor exterior deck and exterior stair to rear yard.Details
create one new adu (accessory dwelling unit) per ordinance no. 162-16. at ground floor of existing singe family dwelling. modify the interior of the existing second floor kitchen, provide new second floor exterior deck and exterior stair to rear yard. | $75,000 |
| Feb 19, 2020 | Never finaled issued Sep 2020, no final | 2050 18th Av | remodel (e) kitchen. fill-in portion of (e) lightwell. replace existing guardrails at the front balcony with wood guardrails. replace 2 front windows & 2 back windows.Details
remodel (e) kitchen. fill-in portion of (e) lightwell. replace existing guardrails at the front balcony with wood guardrails. replace 2 front windows & 2 back windows. | $25,000 |
| Dec 13, 2019 | Never finaled issued Apr 2022, no final | 5088 Mission St | to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a**Details
to comply w/ complaint 201982245 & 201972951. change of occupancy from commercial to residential units(two new residential units at 2nd story).**maher n/a** | $150,000 |
| Oct 24, 2018 | Completed final sign-off Feb 2025 | 1425 Irving St | converting portion of extg ground floor commercial unit to a residential unit & commercial unit (retail use) at street.Details
converting portion of extg ground floor commercial unit to a residential unit & commercial unit (retail use) at street. | $120,000 |
| Oct 15, 2018 | Completed final sign-off Aug 2023 | 366 Sussex St | 2 story rear yard addition, 328 sf addition. second level:powder rm, enlarge kitchen, third fl: 1 new bedrm, 1 bathroom, renovate existing bed and bath. no changes to 1st fl, height below existing. adu under application #201705166655Details
2 story rear yard addition, 328 sf addition. second level:powder rm, enlarge kitchen, third fl: 1 new bedrm, 1 bathroom, renovate existing bed and bath. no changes to 1st fl, height below existing. adu under application #201705166655 | $50,000 |
| Jan 19, 2018 | Completed final sign-off Feb 2023 | 1839 26th Av | horizontal rear addition which includes a remodeled kitchen ,roof, windows,finishes and fixtures throughout. 1 master bedroom, 1 bedroom,2 baths. life safety under seperate permit.Details
horizontal rear addition which includes a remodeled kitchen ,roof, windows,finishes and fixtures throughout. 1 master bedroom, 1 bedroom,2 baths. life safety under seperate permit. | $100,000 |