- May 2005 to Mar 2023
26 permits since 2000 (engineer on 23 permits, architect on 3 permits): 18 completed, 1 in progress, 1 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 7, 2023 | In progress issued Nov 2023 | 312 Sutter St | Rise Rigging Llc | ext facade masonry repairs. bldg rear & east elevation: remove outer wythe of damaged brick & repair in-kind. clean & treat steel w/zinc rich primer. bldg front on sutter st repair 2 damaged terra cotta pieces, apply sealant to (e) cracking in brick.Details
ext facade masonry repairs. bldg rear & east elevation: remove outer wythe of damaged brick & repair in-kind. clean & treat steel w/zinc rich primer. bldg front on sutter st repair 2 damaged terra cotta pieces, apply sealant to (e) cracking in brick. | $40,000 |
| Sep 15, 2021 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | basement - change of occupancy from restaurant to food preparation factory. t.i renovation of basement. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceiling, lighting, flooring, finishes and furnishings.Details
basement - change of occupancy from restaurant to food preparation factory. t.i renovation of basement. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceiling, lighting, flooring, finishes and furnishings. | $496,000 |
| Dec 15, 2020 | Expired or cancelled expired Sep 2026 | 2301 Market St | Yerba Buena Builders Inc | demo damaged columns, storefront & glazing; install (n) columns, repair & replace storefront systemDetails
demo damaged columns, storefront & glazing; install (n) columns, repair & replace storefront system | $22,535 |
| Aug 31, 2020 | Completed final sign-off Dec 2021 | 249 Eddy St | voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a**Details
voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a** | $289,750 | |
| Aug 28, 2020 | Completed final sign-off Oct 2021 | 165 Turk St | Ncr Construction Inc | voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a**Details
voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a** | $398,856 |
| Dec 23, 2019 | Completed final sign-off Feb 2021 | 317 Monterey Bl | Seismic Retrofitters Inc. | shoring of property rear wall within piers, support of rear ground floor slab with helical piers, voluntar seismic strengthening at rear/first level.Details
shoring of property rear wall within piers, support of rear ground floor slab with helical piers, voluntar seismic strengthening at rear/first level. | $88,000 |
| Feb 15, 2018 | Completed final sign-off May 2018 | 3201 23rd St | Dan Gillies Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria ____Details
soft story retrofit per sfebc chapter 4d engineering criteria ____ | $120,000 |
| Oct 19, 2017 | Completed final sign-off Sep 2018 | 1723 Lyon St | Current Construction | voluntary seismic upgrade at ground fl level of building improvement to eliminate soft storyDetails
voluntary seismic upgrade at ground fl level of building improvement to eliminate soft story | $25,000 |
| Oct 6, 2017 | Expired or cancelled withdrawn Aug 2018 | 1723 Lyon St | Current Construction | voluntary seismic upgrade at g/f, improvements will eliminate the soft story, weak story condition present in building.Details
voluntary seismic upgrade at g/f, improvements will eliminate the soft story, weak story condition present in building. | $25,000 |
| Sep 20, 2017 | Completed final sign-off Aug 2019 | 1980 Sacramento St | Azul Works, Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. new steel special moment frames and shear walls.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. new steel special moment frames and shear walls. | $100,000 |
| Sep 15, 2017 | Expired or cancelled withdrawn Mar 2020 | 1488 Pine St | soft story retrofit (residential portion)per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new steel special moment frames & shearwalls. (commercial #201709158415)Details
soft story retrofit (residential portion)per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new steel special moment frames & shearwalls. (commercial #201709158415) | $50,000 | |
| Sep 15, 2017 | Expired or cancelled withdrawn Mar 2020 | 1490 Pine St | soft story retrofit (commercial portion) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new steel special moment frames & shearwalls. (residential #201709158387)Details
soft story retrofit (commercial portion) per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new steel special moment frames & shearwalls. (residential #201709158387) | $50,000 | |
| Jul 21, 2017 | Completed final sign-off Sep 2018 | 3234 Washington St | Lordan Construction | soft story retrofit per sfebc chapter 4d, engineering creteria 2016 cebc appendix a-4. south side of garage level is partially below garde & building has split levels due to scope of site. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d, engineering creteria 2016 cebc appendix a-4. south side of garage level is partially below garde & building has split levels due to scope of site. ** maher: n/a ** | $100,000 |
| Feb 14, 2017 | Completed final sign-off May 2018 | 434 Lombard St | Lordan Construction | soft story retrofit of gr fl including prefabricated special moment frames and plywood shear walls. a portion of the building is constructed on brick foundations which will be replaced. soft story retrofit per sfbc ch.34b 2012 iebc app a-4.Details
soft story retrofit of gr fl including prefabricated special moment frames and plywood shear walls. a portion of the building is constructed on brick foundations which will be replaced. soft story retrofit per sfbc ch.34b 2012 iebc app a-4. | $100,000 |
| Sep 13, 2016 | Completed final sign-off Jul 2017 | 2325 Washington St | Lordan Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story retrofit of ground floor, plywood shear wall, metal hardware, steel moment frames, foundation improvements.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. soft story retrofit of ground floor, plywood shear wall, metal hardware, steel moment frames, foundation improvements. | $100,000 |
| Aug 24, 2016 | Completed final sign-off Oct 2016 | 2480 Washington St | The Birmingham Group | repairs to cantilever beams on 3 fire escapes, 4 locations on #1 escape, 3 locations on #2 and 1 location on #3.Details
repairs to cantilever beams on 3 fire escapes, 4 locations on #1 escape, 3 locations on #2 and 1 location on #3. | $18,000 |
| Aug 4, 2016 | Expired or cancelled withdrawn Feb 2018 | 3201 23rd St | soft story story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $80,000 | |
| Jul 18, 2016 | Completed final sign-off Jun 2017 | 10 04th St | P S R West Coast Builders Inc | new equipment platform for future refrigeration compressor and condenser. n/a maher ordinanceDetails
new equipment platform for future refrigeration compressor and condenser. n/a maher ordinance | $120,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 2 Stockton St | Shawmut Woodworking & Supply Inc | deferred structural submittals for glass handrails, glass guard rails & lavatory supports. reference pa 201504173986. maher n/aDetails
deferred structural submittals for glass handrails, glass guard rails & lavatory supports. reference pa 201504173986. maher n/a | |
| Jun 9, 2015 | Completed final sign-off Mar 2018 | 750 Presidio Av | Nicholas Jarrett | comply with soft story ordinance 66-13 and soft story retrofit per sfbc 34b. fema. maher n/a.Details
comply with soft story ordinance 66-13 and soft story retrofit per sfbc 34b. fema. maher n/a. | $100,000 |
| Oct 29, 2014 | Completed final sign-off May 2015 | 401 30th St | R G M Builders | soft story per sfbc chapter 34b and comply with engineering criteria asce 41-06.Details
soft story per sfbc chapter 34b and comply with engineering criteria asce 41-06. | $125,000 |
| Dec 30, 2013 | Completed final sign-off Feb 2015 | 2959 Harrison St | mandatory soft story retrofit (crawl space) per sf bc chapter 34b.Details
mandatory soft story retrofit (crawl space) per sf bc chapter 34b. | $20,000 | |
| Nov 19, 2013 | Completed final sign-off Nov 2014 | 2065 Oakdale Av | Bbc Construction Inc. | construct extended parapet @ partial perimeter wall, add canopy over door.Details
construct extended parapet @ partial perimeter wall, add canopy over door. | $5,000 |
| Nov 16, 2009 | Expired or cancelled cancelled Jul 2011 | 130 Delmar St | new interior partitions, finishes,plbg and elec and 2 new bathrooms on upper floor. ne wwindows on sides of house and new sliding doors at rear. new rear deck less than 3' above grade and new wood stair to basement, no new square footage is being proposed.Details
new interior partitions, finishes,plbg and elec and 2 new bathrooms on upper floor. ne wwindows on sides of house and new sliding doors at rear. new rear deck less than 3' above grade and new wood stair to basement, no new square footage is being proposed. | $350,000 | |
| Jul 1, 2005 | Completed final sign-off Nov 2005 | 398 Hayes St | structural deck re frame & foundation modification (ref to#pa 200506205533 to accomadate walk inDetails
structural deck re frame & foundation modification (ref to#pa 200506205533 to accomadate walk in | $8,000 | |
| May 25, 2005 | Completed final sign-off Aug 2005 | 365 Green St | Johnstone - Mc Auliffe Const. Inc. | this project consists of the addition of a new stair between the garage & first fl. no change ofDetails
this project consists of the addition of a new stair between the garage & first fl. no change of | $15,000 |