Jeffrey Scott Mcgrew
- Listed as
- architect, engineer
- Firm
- Jeffrey Mcgrew
- Based in
- Oakland
- On San Francisco permits
- Aug 2012 to Mar 2026
11 permits since 2000 (architect on 10 permits, engineer on 1 permit): 7 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 9, 2026 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable.Details
revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable. | |
| Aug 12, 2025 | Expired or cancelled withdrawn Mar 2026 | 3824 21st St | Deep Elm Construction Llc | revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change.Details
revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change. | $100 |
| Jul 14, 2025 | Expired or cancelled withdrawn Mar 2026 | 3824 21st St | revision to pa # 2023-1219-2726. changing the rear facing windows at the bay windows (2nd fl) from double hung (on approved permit) to casement. also slight change in attic window size at back of the house.Details
revision to pa # 2023-1219-2726. changing the rear facing windows at the bay windows (2nd fl) from double hung (on approved permit) to casement. also slight change in attic window size at back of the house. | ||
| Dec 19, 2023 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home.Details
renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home. | $200,000 |
| Jun 2, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Brannan St | 2nd fl: interior only scope. non-structural. no change in use, occupancy, or plumbing. primary the addition of shelving and built-in furniture.Details
2nd fl: interior only scope. non-structural. no change in use, occupancy, or plumbing. primary the addition of shelving and built-in furniture. | $250,000 | |
| Oct 11, 2017 | Expired or cancelled cancelled Jan 2026 | 1449 Mendell St | Keystone Construction | exterior renovation of (e) historic commericial building. rebuilding of (e) windows, reclaiming a non-historic filled-in window and new entry storefront at rear. no change of use, occupancy & structure.Details
exterior renovation of (e) historic commericial building. rebuilding of (e) windows, reclaiming a non-historic filled-in window and new entry storefront at rear. no change of use, occupancy & structure. | $60,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2017 | 1449 Mendell St | Keystone Construction | revision to pa 2017-0824-5820 (n) glass doors, double swinging, no change to entry. change meeting room to storage and revise (e) staircase in storage areaDetails
revision to pa 2017-0824-5820 (n) glass doors, double swinging, no change to entry. change meeting room to storage and revise (e) staircase in storage area | |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 1449 Mendell St | Keystone Construction | revision to pa #201705247516 - relocate (n) stair, keep (e) front roll-up door & stair, change cabinet layout & lighting layout.Details
revision to pa #201705247516 - relocate (n) stair, keep (e) front roll-up door & stair, change cabinet layout & lighting layout. | |
| Nov 10, 2014 | Completed final sign-off Sep 2019 | 1450 Masonic Av | Mueller Nicholls Inc | 3 bathrooms and kitchen remodel in upper unit per plan. replace (1) window in master bath for aluminum window.Details
3 bathrooms and kitchen remodel in upper unit per plan. replace (1) window in master bath for aluminum window. | $105,000 |
| Oct 4, 2012 | Completed final sign-off May 2013 | 157 Alpine Tr | Mueller Nicholls Inc | project is an renovation of an existing two unit family residence. project includes replacement of kitchens (2), renovation of bathrooms and interior finishes.Details
project is an renovation of an existing two unit family residence. project includes replacement of kitchens (2), renovation of bathrooms and interior finishes. | $100,000 |
| Aug 21, 2012 | Completed final sign-off Jun 2013 | 118 Whitney St | Mueller Nicholls Inc | revision to appl #2012.0629.3845 & 2012.07.30.6058 - windows added along side stair, not visible from street.Details
revision to appl #2012.0629.3845 & 2012.07.30.6058 - windows added along side stair, not visible from street. | $10,000 |