Keystone Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Oct 2017
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2017 | Expired or cancelled cancelled Jan 2026 | 1449 Mendell St | exterior renovation of (e) historic commericial building. rebuilding of (e) windows, reclaiming a non-historic filled-in window and new entry storefront at rear. no change of use, occupancy & structure.Details
exterior renovation of (e) historic commericial building. rebuilding of (e) windows, reclaiming a non-historic filled-in window and new entry storefront at rear. no change of use, occupancy & structure. | $60,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2017 | 1449 Mendell St | revision to pa 2017-0824-5820 (n) glass doors, double swinging, no change to entry. change meeting room to storage and revise (e) staircase in storage areaDetails
revision to pa 2017-0824-5820 (n) glass doors, double swinging, no change to entry. change meeting room to storage and revise (e) staircase in storage area | |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 1449 Mendell St | revision to pa #201705247516 - relocate (n) stair, keep (e) front roll-up door & stair, change cabinet layout & lighting layout.Details
revision to pa #201705247516 - relocate (n) stair, keep (e) front roll-up door & stair, change cabinet layout & lighting layout. | |
| May 24, 2017 | Completed final sign-off Oct 2017 | 1449 Mendell St | ti renovation of (e) commercial bld. no change of occupancy, exterior work, or expansion of area. use shall be a personal service per planning codeDetails
ti renovation of (e) commercial bld. no change of occupancy, exterior work, or expansion of area. use shall be a personal service per planning code | $200,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2013 | 1555 26th Av | legalize one bedroom, bathroom, powder room, laundry room & storage per plan.Details
legalize one bedroom, bathroom, powder room, laundry room & storage per plan. | $30,000 |
| Nov 28, 2012 | Completed final sign-off Apr 2013 | 643 Masonic Av | to comply with physical inspection report #cc-7154: garage gypsum, ceiling repair, electrical & plumbing repair/correction work, per report requirementsDetails
to comply with physical inspection report #cc-7154: garage gypsum, ceiling repair, electrical & plumbing repair/correction work, per report requirements | $2,000 |
| Feb 28, 2012 | Completed final sign-off Aug 2012 | 65 Lucy St | add 2 bedroom at ground floor & 1 full bathroomDetails
add 2 bedroom at ground floor & 1 full bathroom | $16,000 |
| Oct 7, 2011 | Completed final sign-off Feb 2012 | 591 Monterey Bl | comply w/ complaint #200453658,#200454926,#200454928,#201030626,#201054855 remodel existing employee lounge rm and bath room at ground floorDetails
comply w/ complaint #200453658,#200454926,#200454928,#201030626,#201054855 remodel existing employee lounge rm and bath room at ground floor | $28,000 |
| Aug 19, 2010 | Expired or cancelled cancelled Aug 2022 | 1840 Van Ness Av | remove 24 x 25 north facing non structural painted wall. general advertising sign per n.o.v.case# 8015.Details
remove 24 x 25 north facing non structural painted wall. general advertising sign per n.o.v.case# 8015. | $100 |
| Dec 15, 2009 | Completed final sign-off Jul 2010 | 11 Tioga Av | furnish & install permanent shoring wall at south end of property & replace (e) 6'-0" fence.Details
furnish & install permanent shoring wall at south end of property & replace (e) 6'-0" fence. | $30,000 |
| Dec 3, 2009 | Completed final sign-off May 2011 | 633 Felton St | two story horizontal addition at rear of building.Details
two story horizontal addition at rear of building. | $60,000 |
| Feb 24, 2009 | Completed final sign-off May 2009 | 1744 Bay St | comply with physical inspection report #cc-5487. to legalize (2) storage rooms & (1) 1/2 bath. deck footing & brace re-inforcement at rear deck.Details
comply with physical inspection report #cc-5487. to legalize (2) storage rooms & (1) 1/2 bath. deck footing & brace re-inforcement at rear deck. | $24,000 |
| Oct 3, 2008 | Completed final sign-off Jun 2009 | 41 Annapolis Tr | provide fluorescent light or manual on occupancy sensors in bathrooms. also exhaust fan w/bed. remodel 3 existing bathrooms, replace french doors required. one restroom on 3rd and one on 2nd floor. one restroom on 1st floor behind the garage. french doors on 1st level at rear in work shop area.Details
provide fluorescent light or manual on occupancy sensors in bathrooms. also exhaust fan w/bed. remodel 3 existing bathrooms, replace french doors required. one restroom on 3rd and one on 2nd floor. one restroom on 1st floor behind the garage. french doors on 1st level at rear in work shop area. | $45,000 |
| Jun 18, 2008 | Never finaled issued Jun 2008, no final | 943 Clayton St | amendment to pa# 2008-0213-4668. support post to be steel not wood, attached to over head beam by welding, work at basement. concrete spec 2500 psiDetails
amendment to pa# 2008-0213-4668. support post to be steel not wood, attached to over head beam by welding, work at basement. concrete spec 2500 psi | $3,500 |
| May 13, 2008 | Never finaled issued May 2008, no final | 3033 Judah St | renew pa# 2006/09/29/3761 & pa# 2007/06/12/3641 for final inspection only.Details
renew pa# 2006/09/29/3761 & pa# 2007/06/12/3641 for final inspection only. | |
| May 13, 2008 | Completed final sign-off Jul 2008 | 3033 Judah St | comply with physical inspection report# 3r-5308.Details
comply with physical inspection report# 3r-5308. | $2,000 |
| Feb 13, 2008 | Never finaled issued Feb 2008, no final | 943 Clayton St | install a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settlingDetails
install a support post with a concrete footing in the carport, under a transverse beam, to prevent that beam from further sagging or settling | $5,000 |
| Sep 27, 2007 | Completed final sign-off Dec 2008 | 2526 Francisco St | site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck.Details
site permit. horizontal addition of master bedroom and bathroom on 3rd fl (partial 3rd fl)m horizontal addition of family room , bedroom and bathroom on ground floor. new rear deck. | $300,000 |
| Jun 12, 2007 | Never finaled issued Jun 2007, no final | 3033 Judah St | renew 200609293762 for final inspection onlyDetails
renew 200609293762 for final inspection only | |
| May 9, 2007 | Completed final sign-off Nov 2007 | 580 Funston Av | remodel extg kitchen upgrade electrical and plmg as needed/renovation to comply with t-24 energy codesDetails
remodel extg kitchen upgrade electrical and plmg as needed/renovation to comply with t-24 energy codes | $20,000 |
| Nov 13, 2006 | Completed final sign-off Jun 2007 | 1347 08th Av | remodel bathroom on top floor. new tub, toilet, shower, lights, tile, vanity. motion sensor manual on-light switche. no structural work.Details
remodel bathroom on top floor. new tub, toilet, shower, lights, tile, vanity. motion sensor manual on-light switche. no structural work. | $6,000 |
| Sep 29, 2006 | Never finaled issued Sep 2006, no final | 3033 Judah St | remodel 2 bathrooms, install the toilet lights & fixtrures, install light for brook stairway. anew outlesin hallway and room floor next for rainstain bathroom. one bathroom per unit total 2 bathroomsDetails
remodel 2 bathrooms, install the toilet lights & fixtrures, install light for brook stairway. anew outlesin hallway and room floor next for rainstain bathroom. one bathroom per unit total 2 bathrooms | $5,000 |
| Nov 2, 2005 | Completed final sign-off Mar 2006 | 2633 Turk Bl | remodel kitchen. bathrooms. replace 4 (e) windows. relocate skylight location.Details
remodel kitchen. bathrooms. replace 4 (e) windows. relocate skylight location. | $30,000 |
| Apr 14, 2005 | Completed final sign-off Sep 2005 | 1001 Pine St | replace bathtub with walk-in shower (glass enclosure)Details
replace bathtub with walk-in shower (glass enclosure) | $3,000 |
| Mar 15, 2005 | Completed final sign-off Sep 2005 | 1001 Pine St | replace (e) bathroom sink with new vanity, removal of oneDetails
replace (e) bathroom sink with new vanity, removal of one | $8,000 |