James Cline
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Cline Architects
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Mar 2022
40 permits since 2000 (architect on 36 permits, engineer on 3 permits, authorized agent-others on 1 permit, designer on 1 permit): 26 completed, 10 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2022 | Completed final sign-off Mar 2025 | 1 Ardenwood Wy | Pars Design & Construction | remodel kitchen & 2 full baths. convert quarter bath into half bath. open walls between kitchen & breakfast room. new conditioned space of 1st fl. new windows, skylights & doors. new slad in 1st fl living area with radient heat. new tankless water heater & radient heat. replace electrical panel.Details
remodel kitchen & 2 full baths. convert quarter bath into half bath. open walls between kitchen & breakfast room. new conditioned space of 1st fl. new windows, skylights & doors. new slad in 1st fl living area with radient heat. new tankless water heater & radient heat. replace electrical panel. | $125,000 |
| Jul 23, 2021 | Expired or cancelled withdrawn Mar 2022 | 1 Ardenwood Wy | remodel kitchen & 2 full baths convert half bath to fulll bath open walls between kichen, dining & hallway, raise ceiling height over kitchen, new interior stairs, new cond space at 1st fl. new windows, skylight & doors relocate (n) 200 amp elec pnl (n) heat pump water heater (n) heat pump hvac &Details
remodel kitchen & 2 full baths convert half bath to fulll bath open walls between kichen, dining & hallway, raise ceiling height over kitchen, new interior stairs, new cond space at 1st fl. new windows, skylight & doors relocate (n) 200 amp elec pnl (n) heat pump water heater (n) heat pump hvac & | $200,000 | |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 815 Pierce St | Vision Builders | revision to pa# 202001222512 storage alteration. deletion of undesired structural sheets from adu pa# 201612165219 r1 and mew structural pages to replace deleted pages.Details
revision to pa# 202001222512 storage alteration. deletion of undesired structural sheets from adu pa# 201612165219 r1 and mew structural pages to replace deleted pages. | $25,000 |
| Oct 17, 2019 | Completed final sign-off Aug 2020 | 815 Pierce St | remodel apartment relocate kitchen (4th fl.)Details
remodel apartment relocate kitchen (4th fl.) | $40,000 | |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 555 Duboce Av | unit 9: remodel apartment, remodel kitchen and bath.Details
unit 9: remodel apartment, remodel kitchen and bath. | $30,000 | |
| Apr 26, 2019 | Completed final sign-off Oct 2025 | 551 Duboce Av | Vision Builders, Tn Building | convert (e) space at first floor to accessory studio dwelling unit per ord# 162-16.Details
convert (e) space at first floor to accessory studio dwelling unit per ord# 162-16. | $110,000 |
| Nov 30, 2018 | Never finaled issued Apr 2019, no final | 377 Franconia St | Design Max Construction | remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl.Details
remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl. | $95,000 |
| Sep 20, 2018 | Expired or cancelled expired Nov 2025 | 551 Duboce Av | Vision Builders, Tn Building | convert existing storage to garage for five vehicles at ground level (first floor)Details
convert existing storage to garage for five vehicles at ground level (first floor) | $450,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2022 | 579 Rhode Island St | new rear one story horizontal addition at ground flr with a deck above. remodel one full bathroom.Details
new rear one story horizontal addition at ground flr with a deck above. remodel one full bathroom. | $110,000 | |
| Dec 4, 2017 | Completed final sign-off Apr 2022 | 579 Rhode Island St | remodel kitchen & (1) full bathroom, flip bedrooms & living areas, add (1) full bath, (n) interior stair, expansion of occupied areas @ 1st fl, widen garage door to 9'-6"Details
remodel kitchen & (1) full bathroom, flip bedrooms & living areas, add (1) full bath, (n) interior stair, expansion of occupied areas @ 1st fl, widen garage door to 9'-6" | $115,000 | |
| Dec 30, 2016 | Completed final sign-off May 2018 | 132 Gates St | Gb Construction Company | remodel street facade only. install new alum clad wood windows, new integrally colored stucco siding, new lighting, new planter, new garage door and decorative trim; roof repairDetails
remodel street facade only. install new alum clad wood windows, new integrally colored stucco siding, new lighting, new planter, new garage door and decorative trim; roof repair | $15,000 |
| Sep 9, 2016 | Never finaled issued Feb 2017, no final | 551 Duboce Av | units #1 & #2 modification to 201606240829: interior remodel including 2 kitchen remodels and 2 full bath remodels. modification to pa# 2016/06/24/0829:Details
units #1 & #2 modification to 201606240829: interior remodel including 2 kitchen remodels and 2 full bath remodels. modification to pa# 2016/06/24/0829: | $10,000 | |
| Aug 22, 2016 | Completed final sign-off Aug 2017 | 135 15th Av | Upcycle Builders Inc. | new fixed curb mounted skylight above bathroom. u value of no more than 0.32.Details
new fixed curb mounted skylight above bathroom. u value of no more than 0.32. | $1,000 |
| Jul 15, 2016 | Never finaled filed Jul 2016, never issued | 1047 Lombard St | vertical expansion & new roof deck. infill rear deck @ 1st floor. addition of 2 balconies @ 1st floor. remodel interior of 2 units include 2 kitchens, laundry & 5 full baths. expansion of conditioned areas @ all floors. addition of 1/2 bath & sprinklers.Details
vertical expansion & new roof deck. infill rear deck @ 1st floor. addition of 2 balconies @ 1st floor. remodel interior of 2 units include 2 kitchens, laundry & 5 full baths. expansion of conditioned areas @ all floors. addition of 1/2 bath & sprinklers. | $700,000 | |
| Mar 8, 2016 | Never finaled issued Apr 2016, no final | 26 Jordan Av | Ray Woo Construction And Consulting Llc | install new dormer windows at 3rd floor. (n) wood double hung windows, (n) siding to match (e); non-street facing.Details
install new dormer windows at 3rd floor. (n) wood double hung windows, (n) siding to match (e); non-street facing. | $20,000 |
| Jun 12, 2015 | Completed final sign-off Sep 2017 | 135 15th Av | Upcycle Builders Inc. | rear horizonatal expansion, remodel kitchen & 1-full bath, expansion of occupied area @ garage level.Details
rear horizonatal expansion, remodel kitchen & 1-full bath, expansion of occupied area @ garage level. | $600,000 |
| May 12, 2015 | Never finaled issued Aug 2015, no final | 26 Jordan Av | Ray Woo Construction And Consulting Llc | interior remodel including kitchen remodel, 2 full bath remodels, 1/2 bath remodel. add laundry on upper floor. removal of interior partitans and layout change per plan.Details
interior remodel including kitchen remodel, 2 full bath remodels, 1/2 bath remodel. add laundry on upper floor. removal of interior partitans and layout change per plan. | $200,000 |
| Feb 3, 2015 | Completed final sign-off Feb 2015 | 254 22nd Av | revision pa#2014-1027-9958. documenting (e) rear yard trellis.Details
revision pa#2014-1027-9958. documenting (e) rear yard trellis. | ||
| Oct 27, 2014 | Expired or cancelled expired Jan 2017 | 1196 Hampshire St | revision to 200710155355. indicate built conditions, 3rd flDetails
revision to 200710155355. indicate built conditions, 3rd fl | ||
| Oct 27, 2014 | Completed final sign-off Feb 2015 | 254 22nd Av | as built conditions for 201201262984. rear window changes, changes to construction detailsDetails
as built conditions for 201201262984. rear window changes, changes to construction details | ||
| Jun 13, 2014 | Completed final sign-off Apr 2015 | 215 Claremont Bl | interior remodel, including kitchen remodel, full bath remodel and conversion of a half bath into a full bath, addition of new full bathroom, family room and bedroom in existing lower level. rebuild stairs down to lower levelDetails
interior remodel, including kitchen remodel, full bath remodel and conversion of a half bath into a full bath, addition of new full bathroom, family room and bedroom in existing lower level. rebuild stairs down to lower level | $50,000 | |
| Jun 10, 2014 | Completed final sign-off May 2015 | 1527 35th Av | Quality Painting Construction | lower level remodel, including excavation of concrete slab/foundation, addition of new half bath and remodel of extg full bath.Details
lower level remodel, including excavation of concrete slab/foundation, addition of new half bath and remodel of extg full bath. | $100,000 |
| Feb 3, 2014 | Completed final sign-off Nov 2018 | 18 Moore Pl | Duffin Construction | new 3rd story addition with roof deck add two bedrooms and one bathDetails
new 3rd story addition with roof deck add two bedrooms and one bath | $250,000 |
| Sep 11, 2013 | Completed final sign-off Jul 2014 | 69 Fair Oaks St | Lyon Restoration Inc Dba Service Team Of | kitchen remodel due to fire damage including removal of non-load bearing partitions, addition of new powder room under stairs. verify that there are 3 units. no fire rated wall work.Details
kitchen remodel due to fire damage including removal of non-load bearing partitions, addition of new powder room under stairs. verify that there are 3 units. no fire rated wall work. | $45,000 |
| Dec 18, 2012 | Completed final sign-off Apr 2013 | 1301 Clay St | Olive Construction Corp | #6: remodel two bathrooms, demolish and rebuild new kitchen in (e) dining room; demo load bearing wall b/w living and dining. enlarge closet in bedroom, demo closet in bedroom, work shall include all related electrical, plumbing, strucrual and finish work as req for complete installation.Details
#6: remodel two bathrooms, demolish and rebuild new kitchen in (e) dining room; demo load bearing wall b/w living and dining. enlarge closet in bedroom, demo closet in bedroom, work shall include all related electrical, plumbing, strucrual and finish work as req for complete installation. | $40,000 |
| Oct 31, 2012 | Never finaled filed Oct 2012, never issued | 1469 Pacific Av | convert warehouse bldg to 9 unit resid, 21 off-street parking space, retains east, south & west walls, demolish front facade. construct 10-foot garage podium with three-stories of res'd above, 2 separate res'd structure w/mid-lot open space, front structure is 3 stories, 7 units, rear struct isDetails
convert warehouse bldg to 9 unit resid, 21 off-street parking space, retains east, south & west walls, demolish front facade. construct 10-foot garage podium with three-stories of res'd above, 2 separate res'd structure w/mid-lot open space, front structure is 3 stories, 7 units, rear struct is | $2,000,000 | |
| Apr 13, 2012 | Completed final sign-off Jan 2013 | 69 Fair Oaks St | rebuild existing wood entry stair with enlarged landing. new concrete paving at entry to repair cracks and drainage issues.Details
rebuild existing wood entry stair with enlarged landing. new concrete paving at entry to repair cracks and drainage issues. | $1,500 | |
| Jan 26, 2012 | Completed final sign-off Feb 2015 | 254 22nd Av | Luxor Construction Inc. | rear 1-story addition w/ deck above and glass stair enclosure.Details
rear 1-story addition w/ deck above and glass stair enclosure. | $15,000 |
| Jul 26, 2011 | Completed final sign-off Oct 2011 | 412 Noe St | Cabrillo Construction Co. Inc. | revision to 200806053754. change interior partitions, enlarge roof deckDetails
revision to 200806053754. change interior partitions, enlarge roof deck | |
| Jul 6, 2011 | Never finaled filed Jul 2011, never issued | 412 Noe St | Cabrillo Construction Co. Inc. | revision to 2008-0605-3754. change interior walls/doors. change to front elevation. change stair doors at first floor.Details
revision to 2008-0605-3754. change interior walls/doors. change to front elevation. change stair doors at first floor. | |
| Nov 22, 2010 | Completed final sign-off Oct 2011 | 420 Noe St | Cabrillo Construction Co. Inc. | all work at northwall. replace foundation, replace fire damaged studs, remove siding, install one layer 5/8" type x gyp sheathingh,, bldg paper. one layer t-iii plywd siding.Details
all work at northwall. replace foundation, replace fire damaged studs, remove siding, install one layer 5/8" type x gyp sheathingh,, bldg paper. one layer t-iii plywd siding. | $8,000 |
| Apr 9, 2009 | Expired or cancelled withdrawn Oct 2009 | 420 Noe St | new building - three stories over garage, total of (4) stories.Details
new building - three stories over garage, total of (4) stories. | $975,000 | |
| Jun 5, 2008 | Completed final sign-off Jan 2011 | 412 Noe St | demolish two families 3 stories building.Details
demolish two families 3 stories building. | $7,000 | |
| Apr 22, 2008 | Completed final sign-off Aug 2009 | 254 22nd Av | reframe portion of ex roof to provide required headroom for relocated stairs to e attic. framing will accomodate future solar panels. reframed portion of roof will match the slope and height of e roof at the rear of building. proposed change of roofline not visible from the streetDetails
reframe portion of ex roof to provide required headroom for relocated stairs to e attic. framing will accomodate future solar panels. reframed portion of roof will match the slope and height of e roof at the rear of building. proposed change of roofline not visible from the street | $25,000 | |
| Dec 27, 2007 | Completed final sign-off Mar 2010 | 124 23rd Av | rear extension - 3-story horizontal rear addition including removal of (e) porch.Details
rear extension - 3-story horizontal rear addition including removal of (e) porch. | $200,000 | |
| Dec 12, 2007 | Completed final sign-off Sep 2008 | 2000 47th Av | remove 3 wood posts and pier footings at garage level. replace with new wood posts and concrete pier footings. revision to pa# 200710175660Details
remove 3 wood posts and pier footings at garage level. replace with new wood posts and concrete pier footings. revision to pa# 200710175660 | $1,500 | |
| Nov 30, 2007 | Completed final sign-off Sep 2008 | 2000 47th Av | new covered front porch. new 6' concrete block fence at side and rear of yard. new garden shed < 100 s.f. 8' high.Details
new covered front porch. new 6' concrete block fence at side and rear of yard. new garden shed < 100 s.f. 8' high. | $10,000 | |
| Oct 15, 2007 | Completed final sign-off Jan 2017 | 1196 Hampshire St | clarifing building is three story and legalizing 2nd unit. demo rear back porch and stairs. build new 3 structure with decks and stairs to third story.Details
clarifing building is three story and legalizing 2nd unit. demo rear back porch and stairs. build new 3 structure with decks and stairs to third story. | $75,000 | |
| Jun 15, 2007 | Never finaled issued Jan 2011, no final | 852 42nd Av | vertical addition, horizontal additon (rear) kitchen modifications, add 2nd dwelling unit.Details
vertical addition, horizontal additon (rear) kitchen modifications, add 2nd dwelling unit. | $250,000 | |
| Jul 7, 2006 | Completed final sign-off Oct 2006 | 129 Capistrano Av | Pagco Construction, Inc. | bathroom upgrade: replace plumbing fixtures in (e) toilet, new wall and floor finishes. new lighting, one gfi outlet. new in-floor electric heating system. work in the bathroom only and replace for lighting.Details
bathroom upgrade: replace plumbing fixtures in (e) toilet, new wall and floor finishes. new lighting, one gfi outlet. new in-floor electric heating system. work in the bathroom only and replace for lighting. | $7,000 |