Design Max Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Jun 2022
- Last 24 months
- 0 permits filed
202 permits since 2000: 154 completed, 33 never finaled, 15 expired or cancelled.
Of the 33 never-finaled permits, 21 are 5 to 10 years old, 12 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 202.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2022 | Completed final sign-off Feb 2023 | 5821 Geary Bl | to comply with nov #202290060. remove extg 8' height tile and patch the wall to flat and replace tile to new.Details
to comply with nov #202290060. remove extg 8' height tile and patch the wall to flat and replace tile to new. | $2,000 |
| Jun 1, 2022 | Completed final sign-off Jun 2022 | 1458 09th Av | to comply with nov #202173848. remove plywood that enclosed under deck and footing and framing plus exterior finishes. no work on extg structural etc.Details
to comply with nov #202173848. remove plywood that enclosed under deck and footing and framing plus exterior finishes. no work on extg structural etc. | $1,000 |
| Mar 23, 2022 | Completed final sign-off Apr 2023 | 172 Denslowe Dr | remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout.Details
remodel kitchen & 2 baths. add one new bath. relocate w/d, add d.v. fireplace, replace 2 doors, add/relocate recepticles, new lighting throughout. | $90,000 |
| Mar 8, 2022 | Expired or cancelled cancelled Jan 2026 | 674 Broadway | windows replace at front, 6 windows, replace in kind. aluminum window, etc. u factor = 0.30 or lessDetails
windows replace at front, 6 windows, replace in kind. aluminum window, etc. u factor = 0.30 or less | $2,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 3315 Pierce St | adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room.Details
adding 1 skylight (20"x30") in bathroom. adding 2 skylights (16"x48") in living room. | $4,500 |
| Jul 28, 2021 | Completed final sign-off Jun 2022 | 650 Delancey St | unit 2: (2) in-kind bathrooms remodel: no layout change. no other workDetails
unit 2: (2) in-kind bathrooms remodel: no layout change. no other work | $18,000 |
| Jul 19, 2021 | Completed final sign-off Sep 2021 | 2008 Keith St | renew pa# 201411030494 for final inspection. unit aDetails
renew pa# 201411030494 for final inspection. unit a | |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 674 Broadway | commencement of work not started under previously approved bpa#201602038720Details
commencement of work not started under previously approved bpa#201602038720 | $20,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 3315 Pierce St | 2 bathrooms remodel (1 upstair, 1 downstair). no layout change.Details
2 bathrooms remodel (1 upstair, 1 downstair). no layout change. | $18,000 |
| Jun 22, 2021 | Never finaled filed Jun 2021, never issued | 2689 23rd Av | to renew expired building permit. commencement of work not started under previously approved permit application no: 201509308493 - horizontal additioin to add (1) bedroomDetails
to renew expired building permit. commencement of work not started under previously approved permit application no: 201509308493 - horizontal additioin to add (1) bedroom | |
| Jun 22, 2021 | Never finaled filed Jun 2021, never issued | 2689 23rd Av | to renewal expired building permit. commencement of work not started previously approved permit application no: 201506179226.Details
to renewal expired building permit. commencement of work not started previously approved permit application no: 201506179226. | |
| Jun 22, 2021 | Never finaled filed Jun 2021, never issued | 2689 23rd Av | to renew expired building permits. (1) commencement of work not started previously approved permit app#: 201501297032 - to add (2) bedrooms, (1) bathroom at the ground flr (2) commencement of work not started previously approved permit app#: 201506179226 - to legalize a 2nd unit at ground flrDetails
to renew expired building permits. (1) commencement of work not started previously approved permit app#: 201501297032 - to add (2) bedrooms, (1) bathroom at the ground flr (2) commencement of work not started previously approved permit app#: 201506179226 - to legalize a 2nd unit at ground flr | |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 230 Lake Merced Hill St North St | hallway bath remodel, replace shower, replace vanity, no change to toilet, same locationDetails
hallway bath remodel, replace shower, replace vanity, no change to toilet, same location | $10,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 1221 Clayton St | hallway bath toilet room remodel, no change on tub, powder room remodel, non structuralDetails
hallway bath toilet room remodel, no change on tub, powder room remodel, non structural | $10,000 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 2689 23rd Av | to renewal expired building permit. commencement of work not started previously approved permit application # 201501206062.Details
to renewal expired building permit. commencement of work not started previously approved permit application # 201501206062. | |
| May 18, 2021 | Expired or cancelled withdrawn Aug 2023 | 1458 09th Av | response to the violation #202173848. legalize storage under the existing deck.Details
response to the violation #202173848. legalize storage under the existing deck. | $15,000 |
| Apr 12, 2021 | Completed final sign-off Jan 2022 | 2001 Mcallister St | master bathroom: replace toilet, vanity top only, shower wall tile, light and fan. hallway bath: replace toilet, vanity top, tub, tub wall tile, light and fan.Details
master bathroom: replace toilet, vanity top only, shower wall tile, light and fan. hallway bath: replace toilet, vanity top, tub, tub wall tile, light and fan. | $28,000 |
| Mar 12, 2021 | Completed final sign-off Dec 2021 | 1903 Eddy St | unit #1: replace washer/ ventless dryer at existing location. no wall change.Details
unit #1: replace washer/ ventless dryer at existing location. no wall change. | $2,500 |
| Feb 3, 2021 | Never finaled issued Feb 2021, no final | 2134 Franklin St | replace 12 windows at front to wood window. wood windows with true divided lites to match exactly the google 2019 photo - to match the lower unit.Details
replace 12 windows at front to wood window. wood windows with true divided lites to match exactly the google 2019 photo - to match the lower unit. | $5,000 |
| Feb 3, 2021 | Completed final sign-off Dec 2021 | 1458 09th Av | remodel powder room and replace toilet, sink at 2nd floor. replace sink, toilet and tub at 3rd floor hallway bath.Details
remodel powder room and replace toilet, sink at 2nd floor. replace sink, toilet and tub at 3rd floor hallway bath. | $15,000 |
| Feb 1, 2021 | Never finaled issued May 2021, no final | 17 Pearl St | kitchen remodel. bathroom remodel. bathroom additional at 3rd floor.Details
kitchen remodel. bathroom remodel. bathroom additional at 3rd floor. | $60,000 |
| Jan 22, 2021 | Completed final sign-off Aug 2021 | 330 03rd Av | new concrete at rear yard, 632 sf w/ slope 1/2%. toward to the main buildingDetails
new concrete at rear yard, 632 sf w/ slope 1/2%. toward to the main building | $5,000 |
| Jan 22, 2021 | Completed final sign-off Jul 2021 | 1219 Clayton St | remodel hallway bath at 2nd floor only. repair siding at rear approx. 30 sq. ft.Details
remodel hallway bath at 2nd floor only. repair siding at rear approx. 30 sq. ft. | $10,000 |
| Jan 22, 2021 | Completed final sign-off Dec 2021 | 1458 09th Av | kitchen remodel, fixtures at same location. replace cabinets and countertop.Details
kitchen remodel, fixtures at same location. replace cabinets and countertop. | $10,000 |
| Jan 21, 2021 | Expired or cancelled withdrawn Apr 2021 | 308 Francisco St | add a new wall at garage level.Details
add a new wall at garage level. | $1,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2021 | 553 Wildwood Wy | complaint#202069791, replace floor tile at front stair.Details
complaint#202069791, replace floor tile at front stair. | $3,000 |
| Dec 14, 2020 | Completed final sign-off Aug 2023 | 135 Willard St | replace a window to sliding door & add guard rail at roof top to comply w/ nov 202009043 & 202029525.Details
replace a window to sliding door & add guard rail at roof top to comply w/ nov 202009043 & 202029525. | $1,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 109 Stratford Dr | remodel hallway bath, add outlet for fire place, add subpanel @ hallway for hallway bathDetails
remodel hallway bath, add outlet for fire place, add subpanel @ hallway for hallway bath | $10,000 |
| Oct 6, 2020 | Completed final sign-off Nov 2020 | 308 Francisco St | replace lower level bath vanity toilet and light fixtures. tile to remainDetails
replace lower level bath vanity toilet and light fixtures. tile to remain | $2,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2023 | 475 Fell St | first time tenant. install a grocery produce retail store in a new commercial space, (n) type ii hood and electrical equipment. (n) accessible counter. (n) ansul fire suppression system under seperate permit.Details
first time tenant. install a grocery produce retail store in a new commercial space, (n) type ii hood and electrical equipment. (n) accessible counter. (n) ansul fire suppression system under seperate permit. | $80,000 |
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 79 Seward St | remodel (e) hallway bathroom in-kind.Details
remodel (e) hallway bathroom in-kind. | $9,000 |
| Mar 12, 2020 | Expired or cancelled cancelled Jan 2026 | 5801 Geary Bl | electric wall sign ( ha da la taiwanese asian fusion)Details
electric wall sign ( ha da la taiwanese asian fusion) | $2,000 |
| Feb 27, 2020 | Expired or cancelled expired May 2022 | 3621 Broderick St | 1 bathroom remodel, replace toilet, tub and shower fixtures and vanity etcDetails
1 bathroom remodel, replace toilet, tub and shower fixtures and vanity etc | $10,000 |
| Feb 21, 2020 | Completed final sign-off Dec 2020 | 135 Willard North St | to comply with nov 201921582 item 6 & 7 only: replace 2 fire doors on the rooftop & the basement.Details
to comply with nov 201921582 item 6 & 7 only: replace 2 fire doors on the rooftop & the basement. | $1,000 |
| Feb 21, 2020 | Completed final sign-off Nov 2020 | 308 Francisco St | remodel 1 ktichen & bathroom in kind.Details
remodel 1 ktichen & bathroom in kind. | $20,000 |
| Feb 3, 2020 | Completed final sign-off Sep 2021 | 22 06th St | remodel extg restaurant. install new appliances. build new counter etc., occupant load not exceed 49, sign to be postedDetails
remodel extg restaurant. install new appliances. build new counter etc., occupant load not exceed 49, sign to be posted | $30,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 314 Francisco St | kitchen remodel in kind.Details
kitchen remodel in kind. | $10,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 312 Francisco St | kitchen remodel in kind.Details
kitchen remodel in kind. | $10,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 308 Francisco St | kitchen and bath remodelDetails
kitchen and bath remodel | $15,000 |
| Oct 10, 2019 | Completed final sign-off Aug 2022 | 3132 Ulloa St | structural revision to 2018 0117 8839Details
structural revision to 2018 0117 8839 | $5,000 |
| Sep 18, 2019 | Completed final sign-off Jan 2020 | 255 Maywood Dr | to comply with nov #201885321. rmeove a bath at garage level. remove deck at rear.Details
to comply with nov #201885321. rmeove a bath at garage level. remove deck at rear. | $3,000 |
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 1914 30th Av | kitchen remodel, no wall removed, 11 ft. x 11 ft. approximatelyDetails
kitchen remodel, no wall removed, 11 ft. x 11 ft. approximately | $8,000 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 255 Maywood Dr | replace two downspouts replace in kindDetails
replace two downspouts replace in kind | $1,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 713 Shrader St | replace kitchen counter top only. (e) cabinets remain. install washer/dryer into (e) closet. replace sink, no ateration on walls, etc.Details
replace kitchen counter top only. (e) cabinets remain. install washer/dryer into (e) closet. replace sink, no ateration on walls, etc. | $4,500 |
| Jun 6, 2019 | Expired or cancelled cancelled Jan 2026 | 532 Hugo St | add a bath at attic spaceDetails
add a bath at attic space | $12,000 |
| May 31, 2019 | Completed final sign-off Aug 2019 | 738 North Point St | convert a storage to 1/2 bathDetails
convert a storage to 1/2 bath | $4,500 |
| May 21, 2019 | Completed final sign-off Aug 2019 | 209 Onondaga Av | add a shower at 2nd flr (e) half-bath. remodel 2nd flr hallway bath.Details
add a shower at 2nd flr (e) half-bath. remodel 2nd flr hallway bath. | $15,000 |
| May 14, 2019 | Completed final sign-off Aug 2019 | 503 Hugo St | remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan.Details
remodeling existing bath, change kitchen counter top & rewire entire unit. no change to (e) floor plan. | $10,000 |
| Apr 18, 2019 | Completed final sign-off Sep 2020 | 1259 21st Av | remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a **Details
remove a illegal kitchen at ground floor. comply to planning information center research no. 2019-004182pic. floor infill & 2 bathroom remodel. ** maher: n/a ** | $1,500 |
| Mar 6, 2019 | Never finaled issued May 2019, no final | 530 Hugo St | add 2 bedrooms, 2 bathrooms and 1 family rm at ground flrDetails
add 2 bedrooms, 2 bathrooms and 1 family rm at ground flr | $50,000 |
| Jan 30, 2019 | Completed final sign-off Oct 2019 | 1851 18th Av | 1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms.Details
1/f: add 2 bedrooms, an exercise room, one bathroom. 2/f: remodel (e) kitchen & bathrooms. | $68,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 1614 Cayuga Av | 1/f: add 2 bedrooms, an exercise room, two full bathrooms.Details
1/f: add 2 bedrooms, an exercise room, two full bathrooms. | $50,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 1260 16th Av | 1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bathDetails
1st fl - convert (e) storage space to family room, exercise room, 1 full bath; repair exissting slab and footing; 2nd fl - remodel (e) kitchen and toilet; 3rd fl - remodel (e) bathroom, add a full bath | $100,000 |
| Jan 3, 2019 | Completed final sign-off Jun 2021 | 2418 17th Av | 2nd floor: relocate kitchen, move door & add closetDetails
2nd floor: relocate kitchen, move door & add closet | $10,000 |
| Nov 30, 2018 | Never finaled issued Apr 2019, no final | 377 Franconia St | remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl.Details
remodel kitchen, remove walls between kitchen/living/dining, replace(3) 3rd fl. windows and (1) door in (e) locations, replace and widen rear sliding door on 3rd fl. replace galvanized steel deck railings with new glass railings, new recessed lights, 3rd fl. | $95,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2018 | 3525 Broderick St | remodel one bathroom at upper level (2nd floor hallway). remodel in-kind. no structural work. comply with cec150.0(k) 5Details
remodel one bathroom at upper level (2nd floor hallway). remodel in-kind. no structural work. comply with cec150.0(k) 5 | $10,000 |
| Oct 15, 2018 | Completed final sign-off Jan 2020 | 45 Mclaren Av | at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slabDetails
at basement, relocate (e) bathroom and laundry, add new playroom and sauna rooms w/ shower, replace (e) concrete slab | $49,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2018 | 500 Masonic Av | powder room remodel, replace sink, led light fixrtures & toilet (1.28 gpf) only 4x7Details
powder room remodel, replace sink, led light fixrtures & toilet (1.28 gpf) only 4x7 | $2,500 |
| Sep 12, 2018 | Completed final sign-off Sep 2019 | 144 Townsend St | abe program: update entrance and stair to ada compliance. n/a for maherDetails
abe program: update entrance and stair to ada compliance. n/a for maher | $3,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 144 Townsend St | install new gas meter maher naDetails
install new gas meter maher na | $2,000 |
| May 25, 2018 | Never finaled issued May 2018, no final | 530 Hugo St | remodel existing 2 bath & 1 kitchen. all fixtures remain at same location.Details
remodel existing 2 bath & 1 kitchen. all fixtures remain at same location. | $48,000 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 1346 27th Av | to obtain final inspection for work approved under app#201703171678. all work is complete.Details
to obtain final inspection for work approved under app#201703171678. all work is complete. | |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 3817 Anza St | comply with complaint # 201726241, item # 2, replacement of wall heater. relocate the dryer vent to the back yard less than 14'.Details
comply with complaint # 201726241, item # 2, replacement of wall heater. relocate the dryer vent to the back yard less than 14'. | $500 |
| Mar 13, 2018 | Never finaled issued Mar 2018, no final | 882 York St | interior residential remodel of e 3rd fl unit includes new interior finishes at 3 bdrms, bath, kitche, living areas. 1 full bath addition 3rd fl inter, new windows door at rear yard exterior 3rd fl. replace all other e windows in kind 3rd fl. new structural post and footingDetails
interior residential remodel of e 3rd fl unit includes new interior finishes at 3 bdrms, bath, kitche, living areas. 1 full bath addition 3rd fl inter, new windows door at rear yard exterior 3rd fl. replace all other e windows in kind 3rd fl. new structural post and footing | $86,000 |
| Mar 6, 2018 | Never finaled issued Mar 2018, no final | 4138 Geary Bl | comply with nov # 201832631 & 201721233Details
comply with nov # 201832631 & 201721233 | $1,000 |
| Feb 8, 2018 | Expired or cancelled cancelled Jun 2018 | 567 Greenwich St | kitchen remodel all fixtures at same location no alteration of wall, windows or doorsDetails
kitchen remodel all fixtures at same location no alteration of wall, windows or doors | $10,000 |
| Feb 6, 2018 | Completed final sign-off Jul 2018 | 154 Oshaughnessy Bl | comply with 201830681, add 2 bedrooms and 2 baths at gr flDetails
comply with 201830681, add 2 bedrooms and 2 baths at gr fl | $40,000 |
| Dec 8, 2017 | Completed final sign-off Nov 2018 | 144 Townsend St | add lockers and bike storage. maher naDetails
add lockers and bike storage. maher na | $10,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2018 | 79 Bruce Av | interior room addition on basement. add 1 bedroom, family room and 2 bathroomsDetails
interior room addition on basement. add 1 bedroom, family room and 2 bathrooms | $25,000 |
| Jun 14, 2017 | Completed final sign-off Feb 2019 | 8 Springfield Dr | revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath doorDetails
revision to pa 2016-0422-5514 - change proposed storage room under kitchen to new media room; new conc stair to media room; relocate half bath door | $1,500 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 375 Madrid St | to comply with complaint #201765481. remove storage at back yardDetails
to comply with complaint #201765481. remove storage at back yard | $3,000 |
| May 30, 2017 | Completed final sign-off Dec 2018 | 2214 36th Av | per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f.Details
per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f. | $5,000 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 79 Bruce Av | remodel bathrooms @ upper floors; electrical rewire of entire house.Details
remodel bathrooms @ upper floors; electrical rewire of entire house. | $10,000 |
| Jan 6, 2017 | Completed final sign-off Jun 2020 | 1017 Brussels St | legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans.Details
legalize a 2nd dwelling unit on the ground flr of an (e) single family dwelling per unit legalization ord 43-14. (2) bdrms, bathrooms, kitchen and living room on the ground flr to be legalized per plans. | $5,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 1353 Church St | kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5.Details
kitchen remodel in the residential unit: replace old cabinet countertop with new; patch walls; electrical lines and lights. no new wall and no existing wall relocation. add recessed lights in bathroom. lighting shall comply with cec 150.0(k)3 and 150.0(k)5. | $8,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2017 | 70 Blair Tr | 3rd floor - convert (e) washroom to full bathroom; new wall mounted instantneous tankless water heater to attic and replace (e) tub with shower at (e) bathroomDetails
3rd floor - convert (e) washroom to full bathroom; new wall mounted instantneous tankless water heater to attic and replace (e) tub with shower at (e) bathroom | $15,000 |
| Jun 20, 2016 | Completed final sign-off Sep 2016 | 930 Pacific Av | to install an access window to fire escapeDetails
to install an access window to fire escape | $2,500 |
| Apr 22, 2016 | Completed final sign-off Feb 2019 | 8 Springfield Dr | construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrmDetails
construct 2-story rear addition 1st fl, (n) family & breakfast. remodel kitchen & convert (e) storage for (n) home office, bath & bedrm @ 2nd fl. (n) bathrm & enlarge (e) bedrm | $49,000 |
| Mar 30, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stairDetails
on 1st floor: add 1 bedroom, 1 family rm, 1 bath. add cabinets, approx 8', new interior stair | $45,000 |
| Mar 25, 2016 | Never finaled issued Mar 2016, no final | 1239 21st Av | window replace at facade, on 2nd 7 3rd., total 12 windows. all wooden windows, double hung window except two side on 3rd floor are double casement.Details
window replace at facade, on 2nd 7 3rd., total 12 windows. all wooden windows, double hung window except two side on 3rd floor are double casement. | $2,000 |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 1419 Stockton St | to comply with nov# 201602157, 1)cosmetic work: interior wall painting. 2)install dancing pole less than 40 occupancyDetails
to comply with nov# 201602157, 1)cosmetic work: interior wall painting. 2)install dancing pole less than 40 occupancy | $4,000 |
| Nov 20, 2015 | Completed final sign-off Nov 2017 | 72 Harrington St | interior addition on 1st floor - add 2 bedrooms and 2 bathsDetails
interior addition on 1st floor - add 2 bedrooms and 2 baths | $20,000 |
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 3431 Moraga St | add one bath, one bedroom, one family at garage level.Details
add one bath, one bedroom, one family at garage level. | $25,000 |
| Oct 30, 2015 | Expired or cancelled expired Nov 2017 | 1640 Balboa St | repair stucco approximately 80 square feet visible from the street.Details
repair stucco approximately 80 square feet visible from the street. | $2,500 |
| Aug 14, 2015 | Completed final sign-off May 2016 | 144 Townsend St | 3rd floor: ti work. new walls, doors, glazing, and ceiling grid system. revision to pa 201506260064. maher naDetails
3rd floor: ti work. new walls, doors, glazing, and ceiling grid system. revision to pa 201506260064. maher na | $100,000 |
| Jun 30, 2015 | Completed final sign-off Mar 2016 | 329 Silver Av | abatement of nov #201546701 & #201544481 - remove walls & illegal bathroom at garage level. n/a maher ordinanceDetails
abatement of nov #201546701 & #201544481 - remove walls & illegal bathroom at garage level. n/a maher ordinance | $8,000 |
| Jun 26, 2015 | Completed final sign-off May 2016 | 144 Townsend St | 3rd floor tenant improvement, new walls, doors per plans. core and shell works including ada compliance rest rooms & elevator are under approved permit bpa# 201503201524. all electrical and mechanical work under separate permit.Details
3rd floor tenant improvement, new walls, doors per plans. core and shell works including ada compliance rest rooms & elevator are under approved permit bpa# 201503201524. all electrical and mechanical work under separate permit. | $90,000 |
| Jun 25, 2015 | Completed final sign-off May 2016 | 144 Townsend St | 2/f - t.i. -construct new walls, doors, per plan. core & shell works incld ada compliance restroom & elevator under approved 201503050095; all elec & mech work will be under separate permit;maher n/aDetails
2/f - t.i. -construct new walls, doors, per plan. core & shell works incld ada compliance restroom & elevator under approved 201503050095; all elec & mech work will be under separate permit;maher n/a | $90,000 |
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 735 Montgomery St | electrical & plumbing work per plan. ref pa#201204188589. n/a maher ordinanceDetails
electrical & plumbing work per plan. ref pa#201204188589. n/a maher ordinance | $5,000 |
| Jun 16, 2015 | Completed final sign-off Jun 2016 | 144 Townsend St | mechanical work per plan for 3rd floor only. t.i. pa#201503201524. n/a ordinance #155-13Details
mechanical work per plan for 3rd floor only. t.i. pa#201503201524. n/a ordinance #155-13 | $8,000 |
| Jun 15, 2015 | Completed final sign-off Jun 2016 | 144 Townsend St | electrical work per plan. ref app#201503201524. n/a for the maher.Details
electrical work per plan. ref app#201503201524. n/a for the maher. | $8,000 |
| Jun 1, 2015 | Expired or cancelled withdrawn Jul 2019 | 1259 21st Av | revision to pa 2013 0429 5719 - remove spiral staircaseDetails
revision to pa 2013 0429 5719 - remove spiral staircase | |
| May 26, 2015 | Expired or cancelled cancelled Jan 2026 | 40 Rosewood Dr | foundatin drain at right. add egress window and convert playroom to bedroomDetails
foundatin drain at right. add egress window and convert playroom to bedroom | $10,000 |
| Apr 3, 2015 | Completed final sign-off Jun 2016 | 144 Townsend St | 2nd flr: rewire entire floor. maher - not req'dDetails
2nd flr: rewire entire floor. maher - not req'd | $10,000 |
| Apr 2, 2015 | Completed final sign-off Jul 2016 | 144 Townsend St | all work is on the 1st fl and consist of minor demo and construction as follows. new walls, doors, sidelights, power, lighting, finishes, ada restrooms and shower. n/a ordinance #155-13Details
all work is on the 1st fl and consist of minor demo and construction as follows. new walls, doors, sidelights, power, lighting, finishes, ada restrooms and shower. n/a ordinance #155-13 | $250,000 |
| Apr 1, 2015 | Completed final sign-off May 2015 | 706 Sacramento St | revision to appl #201502128149 - remov etwo showers & add one treatment room. n/a maher ordinanceDetails
revision to appl #201502128149 - remov etwo showers & add one treatment room. n/a maher ordinance | |
| Mar 20, 2015 | Completed final sign-off Oct 2015 | 144 Townsend St | 2 ada restrooms and storage rooms. all work at 3rd floor. n/a for the maher. mep, sprinkler & life safety under separate permit.Details
2 ada restrooms and storage rooms. all work at 3rd floor. n/a for the maher. mep, sprinkler & life safety under separate permit. | $40,000 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 31 Cambon Dr | revision to pa #2014 0513 5563 - relocate service area. no work on exterior.Details
revision to pa #2014 0513 5563 - relocate service area. no work on exterior. | |
| Mar 5, 2015 | Completed final sign-off Oct 2015 | 144 Townsend St | all works at 2nd floor. consists of minor demo and construction. remove existing walls, doors, fixtures and finish. construct new walls, doors, lighting and ada restroom. occupancy not to change. n/a ordinance #155-13Details
all works at 2nd floor. consists of minor demo and construction. remove existing walls, doors, fixtures and finish. construct new walls, doors, lighting and ada restroom. occupancy not to change. n/a ordinance #155-13 | $60,000 |
| Mar 2, 2015 | Completed final sign-off Jun 2015 | 1333 Balboa St | convert walk-in closet to bathroom in each unit (4). convert two-family rooms facing street to bedrooms (2 units)Details
convert walk-in closet to bathroom in each unit (4). convert two-family rooms facing street to bedrooms (2 units) | $40,000 |