- Aug 2005 to Apr 2026
43 permits since 2000 (architect on 37 permits, authorized agent-others on 6 permits): 22 completed, 12 in progress, 5 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 20, 2026 | Completed final sign-off Jun 2026 | 1791 17th Av | revision 202308295508- update heating system in title 24 from gas furnace to heat pump split systemDetails
revision 202308295508- update heating system in title 24 from gas furnace to heat pump split system | ||
| Mar 3, 2026 | In progress issued Mar 2026 | 39 Santa Rosa Av | Cabrillo Construction Co. Inc. | reference to pa#202110291497 (s-1) to revise ground floor adu/ garagae. internal entrance. cancel gas meter to have full electric for the entire house.Details
reference to pa#202110291497 (s-1) to revise ground floor adu/ garagae. internal entrance. cancel gas meter to have full electric for the entire house. | |
| Aug 7, 2025 | Completed final sign-off Jun 2026 | 354 Stratford Dr | 1578 Indiana Corp Dba Advance Building | revision 202212128118- replace propsed front facade aluminum clad wood windows and aluminum windows around the house to vinly windows. replace propsed stucco on south east exterior elevation to horizontal fibercement sidingDetails
revision 202212128118- replace propsed front facade aluminum clad wood windows and aluminum windows around the house to vinly windows. replace propsed stucco on south east exterior elevation to horizontal fibercement siding | |
| Jul 28, 2025 | In progress filed Jul 2025, not yet issued | 2830 Sloat Bl | increase area of retail unit# 1(cafe) from 1029 sf to 1294 sf. install exterior louver at curtain wall for air intake. provide rough mech, elect and plumbing for future cafe tenant (retail# 4) and future restaurant tenant(retail# 1); both spaces remain vacantDetails
increase area of retail unit# 1(cafe) from 1029 sf to 1294 sf. install exterior louver at curtain wall for air intake. provide rough mech, elect and plumbing for future cafe tenant (retail# 4) and future restaurant tenant(retail# 1); both spaces remain vacant | $80,000 | |
| Jul 9, 2025 | In progress issued Jul 2025 | 2148 17th Av | install new 34.5" x 46.6" curb mounted fixed skylight 6-feet away from inner side of exterior property wall. infill 1 existing, property line window at kitchen.Details
install new 34.5" x 46.6" curb mounted fixed skylight 6-feet away from inner side of exterior property wall. infill 1 existing, property line window at kitchen. | $5,000 | |
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 2813 Bush St | Cabrillo Construction Co. Inc. | revision to pa #201801309887. reconfigure existing 3rd floor master bathroom. (reduce size). replace in kind window with existing bathroom location of closet and new full bathroom will be flipped. no fireplace within master bedroom.Details
revision to pa #201801309887. reconfigure existing 3rd floor master bathroom. (reduce size). replace in kind window with existing bathroom location of closet and new full bathroom will be flipped. no fireplace within master bedroom. | $20,000 |
| Apr 21, 2025 | Completed final sign-off Nov 2025 | 4440 20th St | main house rear ext. stairs reconfiguration; stair from 2nd fl to the ground fl to be taken out. infill (e) door to the stairs to create new window. extend deck landing on ground floor; new fire wall along property line @ rear stairs w/new footing; add skylights @ bathroom & above interior stairs.Details
main house rear ext. stairs reconfiguration; stair from 2nd fl to the ground fl to be taken out. infill (e) door to the stairs to create new window. extend deck landing on ground floor; new fire wall along property line @ rear stairs w/new footing; add skylights @ bathroom & above interior stairs. | $10,000 | |
| Jan 31, 2025 | In progress issued May 2026 | 30 Cresta Vista Dr | Waters And Waters | revise p/a 2017-0608-8752 s/1r2 to convert bathroom #3 (half bath) to full bath, remove cover sheet, fire sprinkler note #45 to eliminate sprinkler system from project scope, enlarge rear window 101, install gas furnace to serve basement. remove w/d from 2nd lvl and added a laundry sink to lower lvlDetails
revise p/a 2017-0608-8752 s/1r2 to convert bathroom #3 (half bath) to full bath, remove cover sheet, fire sprinkler note #45 to eliminate sprinkler system from project scope, enlarge rear window 101, install gas furnace to serve basement. remove w/d from 2nd lvl and added a laundry sink to lower lvl | $4,000 |
| Oct 21, 2024 | Completed final sign-off Jul 2025 | 1465 Valencia St | Triond Remodeling Inc | convert (e) powder room to ada all gender bathroom on ground floor. barrier removalDetails
convert (e) powder room to ada all gender bathroom on ground floor. barrier removal | $40,000 |
| Oct 1, 2024 | In progress issued Oct 2024 | 1791 17th Av | Puac Construction Llc | backyard remodeling consisting of a construction of a new 8 ft fence south and north property line abutting (e) subject property fence.Details
backyard remodeling consisting of a construction of a new 8 ft fence south and north property line abutting (e) subject property fence. | $30,000 |
| Aug 5, 2024 | In progress issued Aug 2024 | 2148 17th Av | Bay C T Construction Inc. | new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace.Details
new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace. | $100,000 |
| Jun 18, 2024 | In progress issued Jul 2024 | 39 Santa Rosa Av | Cabrillo Construction Co. Inc. | to comply with board of appeals decision boa # 24-008. revise building permit 202110291497 - property line wall abutting 35 santa rosa ave to be raised to six feet and be one-hour fire rated. this permit does not authorize any work until the first addendum of site permit 202110291497 is issued.Details
to comply with board of appeals decision boa # 24-008. revise building permit 202110291497 - property line wall abutting 35 santa rosa ave to be raised to six feet and be one-hour fire rated. this permit does not authorize any work until the first addendum of site permit 202110291497 is issued. | |
| May 14, 2024 | Completed final sign-off Dec 2024 | 480 Andover St | Cabrillo Construction Co. Inc. | rev 202008222423 (site permit)- revise heating from fau to radiant heat, garage space reconfig, rear wall doors reducing size of openings, remove and fill bay windows at 2nd floor, replace all windows to aluminum clad, reconfig exterior rear stairs, add (n) electric fireplace, enlarge window locatedDetails
rev 202008222423 (site permit)- revise heating from fau to radiant heat, garage space reconfig, rear wall doors reducing size of openings, remove and fill bay windows at 2nd floor, replace all windows to aluminum clad, reconfig exterior rear stairs, add (n) electric fireplace, enlarge window located | $10,000 |
| Mar 6, 2024 | Completed final sign-off Mar 2024 | 4465 Mission St | revision to pa# 202304145779. update da checklist to not check "c" on question #5. correct answer upgrade front entry to be fully accessiable. remove plan check note "this permit not to be finalized until pa# 202212299424 abe is finalized. abe to 4465 mission st.Details
revision to pa# 202304145779. update da checklist to not check "c" on question #5. correct answer upgrade front entry to be fully accessiable. remove plan check note "this permit not to be finalized until pa# 202212299424 abe is finalized. abe to 4465 mission st. | ||
| Jan 23, 2024 | Completed final sign-off May 2024 | 1759 08th Av | landscaping and replacing (e) fence 8' redwood.Details
landscaping and replacing (e) fence 8' redwood. | $8,900 | |
| Nov 6, 2023 | In progress filed Nov 2023, not yet issued | 2496 43rd Av | Spe Construction Inc. | revision to pa# 202103267407, west facing (e) deck 42" stucco railing/ guardrail @ 3/ to be converted top 24" portion to be glass railing, west facing facade (e) 12" canopy to be extended to 36" on west facing facade.Details
revision to pa# 202103267407, west facing (e) deck 42" stucco railing/ guardrail @ 3/ to be converted top 24" portion to be glass railing, west facing facade (e) 12" canopy to be extended to 36" on west facing facade. | $30,000 |
| Aug 29, 2023 | Completed final sign-off Jun 2026 | 1791 17th Av | Puac Construction Llc, Bay C T Construction Inc. | g/f interior remodeling consist of an addition of 1 bedroom, 1 bathroom, new entertainment room, & relocation of (e) bathroom. add a kitchenette w/ 2 or less burner w/ no full size oven. seismic upgrade at ground floor.Details
g/f interior remodeling consist of an addition of 1 bedroom, 1 bathroom, new entertainment room, & relocation of (e) bathroom. add a kitchenette w/ 2 or less burner w/ no full size oven. seismic upgrade at ground floor. | $150,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 490 Post St | Westport Construction | 12/f suite 1230: tenant improvement. remodeling consists of an ada toilet, new conference room and storage, new treatment room. no exterior work to be done.Details
12/f suite 1230: tenant improvement. remodeling consists of an ada toilet, new conference room and storage, new treatment room. no exterior work to be done. | $20,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 1327 Columbus Av | revision to pa# 201605177611. remove approved 1 class 2 bike rack as proposed/approved. instead an in-lieu fee will be applied for the removal of the bike rack.Details
revision to pa# 201605177611. remove approved 1 class 2 bike rack as proposed/approved. instead an in-lieu fee will be applied for the removal of the bike rack. | ||
| May 1, 2023 | Completed final sign-off Apr 2025 | 1759 08th Av | Puac Construction Llc | interior remodeling of a 2 story single family house. infill portion (e) 1/f breezeway and (e) 2/f interior lightwell (not visible from the street). no exterior work to be done except widen garage door width.Details
interior remodeling of a 2 story single family house. infill portion (e) 1/f breezeway and (e) 2/f interior lightwell (not visible from the street). no exterior work to be done except widen garage door width. | $300,000 |
| Apr 19, 2023 | In progress issued Apr 2026 | 278 18th Av | Bay Concept Builder Group | 2-unit remodel w/horizontal addition at rear. remodeled g/f unit consist of bedrms, 1 full bath, & 1 half bath, & an open living/dining/kitchen. 2nd unit on 2/f & 3/f consist of an open living/dining/kitchen & a guest bath w/access to balcony deck @2/f. 3/f: master bedrm, bath, 2 bedrm, 1 full bath.Details
2-unit remodel w/horizontal addition at rear. remodeled g/f unit consist of bedrms, 1 full bath, & 1 half bath, & an open living/dining/kitchen. 2nd unit on 2/f & 3/f consist of an open living/dining/kitchen & a guest bath w/access to balcony deck @2/f. 3/f: master bedrm, bath, 2 bedrm, 1 full bath. | $800,000 |
| Apr 3, 2023 | Expired or cancelled cancelled Jan 2026 | 1700 Cayuga Av | interior ground floor remodeling & minor change @ 2nd fl living rm; convert portion of the garge space into (n) bedrm & 1 bathrm, and removing wall of (e) ground fl bedrm to create a (n) family rm; add 1 (n) exterior window for (n) bedrm; remove portion of 2nd fl wallt o make an opening living.Details
interior ground floor remodeling & minor change @ 2nd fl living rm; convert portion of the garge space into (n) bedrm & 1 bathrm, and removing wall of (e) ground fl bedrm to create a (n) family rm; add 1 (n) exterior window for (n) bedrm; remove portion of 2nd fl wallt o make an opening living. | $80,000 | |
| Mar 28, 2023 | Expired or cancelled withdrawn Apr 2023 | 1759 08th Av | interior remodeling of a 2 story single family residence; infill (e) 1st floor breezeway and (e) 2nd fl lightwell; no exterior work to be done except widen garageDetails
interior remodeling of a 2 story single family residence; infill (e) 1st floor breezeway and (e) 2nd fl lightwell; no exterior work to be done except widen garage | $500,000 | |
| Mar 3, 2023 | Completed final sign-off Oct 2023 | 2467 17th Av | Macro Builder Inc | mitigate code violation at front yard. add landscape and permeable surface. planning code enf case no. 2021-002644enfDetails
mitigate code violation at front yard. add landscape and permeable surface. planning code enf case no. 2021-002644enf | $5,000 |
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 4 Embarcadero Center | W. Wong Construction Co. Inc. | add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit.Details
add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit. | $50,000 |
| Dec 12, 2022 | In progress issued Apr 2024 | 354 Stratford Dr | 1578 Indiana Corp Dba Advance Building | (sfd + adu) vertical & horizontal addition & adu addition on a sfd, 2 story split level. main unit will be @ (e) 1st & new 2nd fl above. adu will be @ (e) first fl & (e) 2nd fl. main unit will consist of a 3 bed/3 bath unit & adu will be a 3bd/3bath. new storage at (e) crawl space.Details
(sfd + adu) vertical & horizontal addition & adu addition on a sfd, 2 story split level. main unit will be @ (e) 1st & new 2nd fl above. adu will be @ (e) first fl & (e) 2nd fl. main unit will consist of a 3 bed/3 bath unit & adu will be a 3bd/3bath. new storage at (e) crawl space. | $400,000 |
| Jun 21, 2022 | Never finaled issued Jul 2022, no final | 2023 Beach St | Kalix Inc Dbalara Construction | adding elevator within interior of building. connecting all 3 stories. minor interior renovation on kitchen on 2nd & 3rd fl.Details
adding elevator within interior of building. connecting all 3 stories. minor interior renovation on kitchen on 2nd & 3rd fl. | $150,000 |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 4440 20th St | rear cottage - interior remodeling of single family. 2 story cottage. reconfigure the (e) bathroom; a new open plan kitchen - living room and expansion of room in 2nd floor by using some attic space (rear bldg)Details
rear cottage - interior remodeling of single family. 2 story cottage. reconfigure the (e) bathroom; a new open plan kitchen - living room and expansion of room in 2nd floor by using some attic space (rear bldg) | $150,000 | |
| Jun 13, 2022 | Completed final sign-off Feb 2023 | 4440 20th St | interior remodel of a single family 2-story main house. add new connecting internal stairs. connecting ground & 2nd fl. new master bedroom with walk-in closet & bathroom on ground floor. remodel on existing bathroom. new open kitchen on 2nd fl.Details
interior remodel of a single family 2-story main house. add new connecting internal stairs. connecting ground & 2nd fl. new master bedroom with walk-in closet & bathroom on ground floor. remodel on existing bathroom. new open kitchen on 2nd fl. | $200,000 | |
| Oct 29, 2021 | In progress issued Jan 2024 | 39 Santa Rosa Av | Cabrillo Construction Co. Inc. | to erect a 3-story, type 5b, single family building with an adu.Details
to erect a 3-story, type 5b, single family building with an adu. | $1,200,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2022 | 2139 14th Av | Cabrillo Construction Co. Inc. | in kind replace of rear deck, hardie plank lap siding at rear building. slidng doores and windwos at rear of building.Details
in kind replace of rear deck, hardie plank lap siding at rear building. slidng doores and windwos at rear of building. | $6,000 |
| Apr 19, 2021 | Expired or cancelled withdrawn Apr 2023 | 1791 17th Av | ground floor interior remodeling turning existing study room and storage room into adu unit, and addition of new deck at backyard.Details
ground floor interior remodeling turning existing study room and storage room into adu unit, and addition of new deck at backyard. | $120,000 | |
| Aug 22, 2020 | Completed final sign-off Dec 2024 | 480 Andover St | Cabrillo Construction Co. Inc. | adding a new 3rd floor on an exisitng 2-story bldg. exterior renovation on the facade of the bldg. new grand room at the 1st flr w/ a new wet bar and full bathroom. the new added 3rd flr will be furnished w/ one master suite and 2 bedrooms.Details
adding a new 3rd floor on an exisitng 2-story bldg. exterior renovation on the facade of the bldg. new grand room at the 1st flr w/ a new wet bar and full bathroom. the new added 3rd flr will be furnished w/ one master suite and 2 bedrooms. | $250,000 |
| Aug 17, 2020 | Completed final sign-off Jun 2023 | 1327 Columbus Av | Molina And Associates Inc Dba Molari Con | new revised retaining walls structural design. as after demolition, site condition is different than the original structure design of the retaining wall.Details
new revised retaining walls structural design. as after demolition, site condition is different than the original structure design of the retaining wall. | $500 |
| Dec 20, 2019 | Never finaled filed Dec 2019, never issued | 616 19th Av | horizontal extension on ground floor and second floor. adding 1 master suite @ ground floor reconfigure kitchen and guest bathroom on second floor.Details
horizontal extension on ground floor and second floor. adding 1 master suite @ ground floor reconfigure kitchen and guest bathroom on second floor. | $100,000 | |
| Jun 8, 2017 | Never finaled issued Mar 2019, no final | 30 Cresta Vista Dr | Molina And Associates Inc Dba Molari Con, Waters And Waters | addition of a 2nd floor above the main level. renovation of the main floor aligning to mid level rear wall. renovation of the basement level into storage and exercise room.Details
addition of a 2nd floor above the main level. renovation of the main floor aligning to mid level rear wall. renovation of the basement level into storage and exercise room. | $800,000 |
| May 15, 2017 | Expired or cancelled cancelled Nov 2018 | 2126 47th Av | horizontal extension of house toward the rear yard. renovation of two bed bedroom and addition of a full bath on 1st flr. renovation of recreation room on basement level. addition of a guest bedroom & computer room.Details
horizontal extension of house toward the rear yard. renovation of two bed bedroom and addition of a full bath on 1st flr. renovation of recreation room on basement level. addition of a guest bedroom & computer room. | $110,000 | |
| May 15, 2017 | Completed final sign-off Apr 2020 | 752 24th Av | Molina And Associates Inc Dba Molari Con | horizontal extension. building rear extension on 1st, 2nd, 3rd flr. add bedrooms @ 1st & 3rd flr. (n) guest bath @ 2nd floor. (n) bathroom @ 3rd & 1st floor.Details
horizontal extension. building rear extension on 1st, 2nd, 3rd flr. add bedrooms @ 1st & 3rd flr. (n) guest bath @ 2nd floor. (n) bathroom @ 3rd & 1st floor. | $200,000 |
| May 17, 2016 | Completed final sign-off Jun 2023 | 1327 Columbus Av | Molina And Associates Inc Dba Molari Con | to demolish 2-story retail building. ** maher: n/a **Details
to demolish 2-story retail building. ** maher: n/a ** | $30,000 |
| May 17, 2016 | Completed final sign-off Jun 2023 | 1327 Columbus Av | Molina And Associates Inc Dba Molari Con | to construct 4 stories, no basement, single residential & retail commercial building. (r-3,m) ** maher: n/a **Details
to construct 4 stories, no basement, single residential & retail commercial building. (r-3,m) ** maher: n/a ** | $1,100,000 |
| Jun 21, 2012 | Completed final sign-off Jul 2014 | 1886 15th Av | 1st floor: interior renovations consisted of family room, bedroom & 2 car tandem garage. 2nd floor: horizontal extension, added 1 bathroom.Details
1st floor: interior renovations consisted of family room, bedroom & 2 car tandem garage. 2nd floor: horizontal extension, added 1 bathroom. | $60,000 | |
| Dec 18, 2007 | Never finaled issued Dec 2007, no final | 310 Sutter St | revision to p/a #2007.10.30.6879. add new lighting in the entire office.Details
revision to p/a #2007.10.30.6879. add new lighting in the entire office. | $2,500 | |
| Aug 10, 2005 | Completed final sign-off Aug 2006 | 2249 Broderick St | 3 bathrooms & 1 kitchen remodeling. 1 new bath. add new bar @ 1st floor unit.Details
3 bathrooms & 1 kitchen remodeling. 1 new bath. add new bar @ 1st floor unit. | $100,000 |