Spe Construction Inc.
- Based in
- San Mateo
- On San Francisco permits
- May 2000 to Nov 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2023 | In progress filed Nov 2023, not yet issued | 2496 43rd Av | revision to pa# 202103267407, west facing (e) deck 42" stucco railing/ guardrail @ 3/ to be converted top 24" portion to be glass railing, west facing facade (e) 12" canopy to be extended to 36" on west facing facade.Details
revision to pa# 202103267407, west facing (e) deck 42" stucco railing/ guardrail @ 3/ to be converted top 24" portion to be glass railing, west facing facade (e) 12" canopy to be extended to 36" on west facing facade. | $30,000 |
| Mar 26, 2021 | Completed final sign-off Nov 2024 | 2496 43rd Av | new vertical addition to (e) 2-story sfd. 3rd story: 2 new bedrooms, 2 full baths, entertainment/living room 2 & study. new pneumatic elevator. new exterior roof terrace & cantilevered balcony. new internal staircase from 2nd to 3rd floor. convert partial (e) 1st floor to caregiver suite, bedroom,Details
new vertical addition to (e) 2-story sfd. 3rd story: 2 new bedrooms, 2 full baths, entertainment/living room 2 & study. new pneumatic elevator. new exterior roof terrace & cantilevered balcony. new internal staircase from 2nd to 3rd floor. convert partial (e) 1st floor to caregiver suite, bedroom, | $750,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rdDetails
remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rd | $185,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652.Details
new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652. | $85,000 |
| May 14, 2013 | Completed final sign-off Mar 2014 | 690 Sutter St | interior demolition of existing apartments. -new interior renovation both apartments. -no structural work involvedDetails
interior demolition of existing apartments. -new interior renovation both apartments. -no structural work involved | $100,000 |
| Aug 9, 2007 | Completed final sign-off Oct 2007 | 2524 Clay St | revision to 200705222005 stair and wall veneer material change from stucco to pre cast veneer. no structural change, cosmetic revision.Details
revision to 200705222005 stair and wall veneer material change from stucco to pre cast veneer. no structural change, cosmetic revision. | $2,000 |
| Jul 18, 2007 | Completed final sign-off Oct 2007 | 2524 Clay St | structural revision #2 to pa 200607207197 and 200705222005: 1. new opening 2x2 at conc wall of driveway. thicker wind wall and relocate 2' forward.Details
structural revision #2 to pa 200607207197 and 200705222005: 1. new opening 2x2 at conc wall of driveway. thicker wind wall and relocate 2' forward. | |
| May 22, 2007 | Completed final sign-off Oct 2007 | 2524 Clay St | redo existing stair at exterior. enlarge existing driveway.Details
redo existing stair at exterior. enlarge existing driveway. | $2,500 |
| Mar 3, 2004 | Completed final sign-off Jun 2004 | 348 Hyde St | as built filing per request of distric ulding kispector to previous permit 9911762.(delta 9)01/30/03Details
as built filing per request of distric ulding kispector to previous permit 9911762.(delta 9)01/30/03 | |
| Jan 21, 2004 | Completed final sign-off Oct 2004 | 1520 Mason St | remove (2) windows on west side in central lightwell. to infill 1hr rate wall at west opening. removDetails
remove (2) windows on west side in central lightwell. to infill 1hr rate wall at west opening. remov | $1,000 |
| Mar 10, 2003 | Completed final sign-off Jun 2004 | 348 Hyde St | revision to 9911762:refinement f front & rear facade substitution of glazing panels w/stud wall. adDetails
revision to 9911762:refinement f front & rear facade substitution of glazing panels w/stud wall. ad | |
| Jun 27, 2000 | Expired or cancelled expired Oct 2000 | 49 Cerritos Av | delete exterior lowers & fence at patio, add storage space at studio, add utility sink at garageDetails
delete exterior lowers & fence at patio, add storage space at studio, add utility sink at garage | $3,500 |
| May 18, 2000 | Expired or cancelled expired Nov 2000 | 49 Cerritos Av | resurface & repair existing driveway at rear easement.Details
resurface & repair existing driveway at rear easement. | $15,000 |