J.F. Wood Iii
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Lpa
- Based in
- Irvine
- On San Francisco permits
- Mar 2005 to Dec 2018
6 permits since 2000 (engineer on 3 permits, architect on 2 permits, authorized agent-others on 1 permit): 5 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2018 | Completed final sign-off Jun 2019 | 150 Spear St | Truebeck Construction | revision to pa #201803294961. added 02/c02 sensor with strobe per sffd comments during final medigas inspection. location is medical gas storage room 573.Details
revision to pa #201803294961. added 02/c02 sensor with strobe per sffd comments during final medigas inspection. location is medical gas storage room 573. | $3,000 |
| Feb 1, 2016 | Completed final sign-off Sep 2016 | 1 Daniel Burnham Ct | revision to 2015-1007-9043 - change g0.10 infringement statement added, building data; a0.10 - added smoke management system notes; a0.20 - added medigas signages; a0.32, a0.30 - added hazardous material management tag; a0.32 - added medical gas code analysis; a2.20 - updated plan wall legend;Details
revision to 2015-1007-9043 - change g0.10 infringement statement added, building data; a0.10 - added smoke management system notes; a0.20 - added medigas signages; a0.32, a0.30 - added hazardous material management tag; a0.32 - added medical gas code analysis; a2.20 - updated plan wall legend; | ||
| Oct 7, 2015 | Completed final sign-off Sep 2016 | 1 Daniel Burnham Ct | ti to include an aaaa sf/medicare licensed fertility center ivf lab; procedure rooms, and physicians office. this will include the demolition and construction of walls, ceilings, flooring, plumbing, electrical and mechanical systems with specified air quality and positive pressure requirementDetails
ti to include an aaaa sf/medicare licensed fertility center ivf lab; procedure rooms, and physicians office. this will include the demolition and construction of walls, ceilings, flooring, plumbing, electrical and mechanical systems with specified air quality and positive pressure requirement | $1,200,000 | |
| Jun 3, 2015 | Completed final sign-off Feb 2018 | 5601 Anza St | remodel 1 kitchen, 3 bathrooms in kind. remove all lath & plaster. replace with new 1/2 sheetrock throughoutDetails
remodel 1 kitchen, 3 bathrooms in kind. remove all lath & plaster. replace with new 1/2 sheetrock throughout | $65,000 | |
| Mar 4, 2005 | Completed final sign-off Apr 2005 | 278 Post St | add fire alarm devices to an (e) f.a. system in a new t.i space (t.i permit #200412060741) @ lowerDetails
add fire alarm devices to an (e) f.a. system in a new t.i space (t.i permit #200412060741) @ lower | $5,500 | |
| Mar 4, 2005 | Never finaled issued Mar 2005, no final | 174 Geary St | add new fire alarm devices to an (e) f.a. system in a new t.i area. @ lower level & grd level.Details
add new fire alarm devices to an (e) f.a. system in a new t.i area. @ lower level & grd level. | $12,000 |