Inon Meir Cohen
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Gadi Construction Inc
- Based in
- Santa Clara,
- On San Francisco permits
- Jun 2020 to Sep 2026
133 permits since 2000 (contractor on 133 permits, authorized agent-others on 5 permits, designer on 3 permits): 103 completed, 15 in progress, 7 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 133.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 807 Fell St | Gadi Construction Inc | convert (e) closet to new powder room. new plumbing fixtures and associated electrical work per plans. no structural, nochange to building footprint or occupancy.Details
convert (e) closet to new powder room. new plumbing fixtures and associated electrical work per plans. no structural, nochange to building footprint or occupancy. | $10,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 1570 Palou Av | Gadi Construction Inc | partial bathroom remodel in kind -convert tub to walk in shower, no change for toilet or vanity, no layout change. no curbless shower. no change to floor layout. no change to wall layout. no structural work.Details
partial bathroom remodel in kind -convert tub to walk in shower, no change for toilet or vanity, no layout change. no curbless shower. no change to floor layout. no change to wall layout. no structural work. | $10,000 |
| Aug 20, 2026 | Completed final sign-off Aug 2026 | 425 Liberty St | Gadi Construction Inc | to obtain final inspection for work approved under pa#202506108358. all work is complete.Details
to obtain final inspection for work approved under pa#202506108358. all work is complete. | |
| Aug 6, 2026 | Completed final sign-off Oct 2026 | 119 Melrose Av | Gadi Construction Inc | 1 bathroom remodel like for like, no tub to shower conversion. tub to tub, new vanity, new toilet.Details
1 bathroom remodel like for like, no tub to shower conversion. tub to tub, new vanity, new toilet. | $10,000 |
| Jul 7, 2026 | Completed final sign-off Sep 2026 | 678 Page St | Gadi Construction Inc | bathroom remodel like for like, tub to tub. remodel in kind. no moving walls, no layout changes. approx 40 sq ft.Details
bathroom remodel like for like, tub to tub. remodel in kind. no moving walls, no layout changes. approx 40 sq ft. | $10,000 |
| Jun 22, 2026 | Completed final sign-off Sep 2026 | 678 Page St | Gadi Construction Inc | kitchen remodel, demo walls to open space, relocate range, fridge and sink, update mep as needed per codeDetails
kitchen remodel, demo walls to open space, relocate range, fridge and sink, update mep as needed per code | $40,000 |
| Jun 11, 2026 | In progress issued Jul 2026 | 12 Carnelian Wy | Gadi Construction Inc | install (n) wall at ground floor garage area to convert into living space, approx 180sfDetails
install (n) wall at ground floor garage area to convert into living space, approx 180sf | $14,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 356 Valley St | Gadi Construction Inc | 3rd floor - full bathroom remodel tube to shower. mep upgrade, demo non bearing wall, creating opening on load beating wall in the 2nd flr.Details
3rd floor - full bathroom remodel tube to shower. mep upgrade, demo non bearing wall, creating opening on load beating wall in the 2nd flr. | $25,000 |
| May 29, 2026 | In progress issued Jun 2026 | 12 Carnelian Wy | Gadi Construction Inc | removal of (e) wall at 2/f dining area. like for like kitchen remodel.Details
removal of (e) wall at 2/f dining area. like for like kitchen remodel. | $30,000 |
| May 29, 2026 | In progress issued Jul 2026 | 115 Wool St | Gadi Construction Inc | new concrete slab (1st floor - living room area and 2ft master bedroom - ref permit 202603268364). new sliding door and windows. master bathroom remodel like for like.Details
new concrete slab (1st floor - living room area and 2ft master bedroom - ref permit 202603268364). new sliding door and windows. master bathroom remodel like for like. | $35,000 |
| May 20, 2026 | Completed final sign-off Sep 2026 | 546 Central Av | Gadi Construction Inc | work in unit 546 central ave only: like for like bathroom remodel, shower to shower replacing vanity toilet and fan. same location. no removal of wallsDetails
work in unit 546 central ave only: like for like bathroom remodel, shower to shower replacing vanity toilet and fan. same location. no removal of walls | $12,000 |
| Mar 26, 2026 | In progress issued Apr 2026 | 115 Wool St | Gadi Construction Inc | foundation repair at existing single family residence. no change to building footing or layout.Details
foundation repair at existing single family residence. no change to building footing or layout. | $45,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 322 Rutledge St | Gadi Construction Inc | like for like bathroom remodel approx 100 sq ft, replace existing tub and shower toilet and vanity, no change to layout, no structural work.Details
like for like bathroom remodel approx 100 sq ft, replace existing tub and shower toilet and vanity, no change to layout, no structural work. | $25,000 |
| Feb 17, 2026 | Completed final sign-off Mar 2026 | 75 San Andreas Wy | Gadi Construction Inc | 35 sq ft like for like bathroom remodel. convert (e) tub to shower in same location. replace finsih and fixtures no structural work.Details
35 sq ft like for like bathroom remodel. convert (e) tub to shower in same location. replace finsih and fixtures no structural work. | $10,660 |
| Jan 21, 2026 | Completed final sign-off Mar 2026 | 251 Andover St | Gadi Construction Inc | demolition non bearing wall to expand closet. no structural, exterior or sq changes.Details
demolition non bearing wall to expand closet. no structural, exterior or sq changes. | $5,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 115 Wool St | Gadi Construction Inc | remove existing exterior stairs and handrails and construct new exterior stairs with new stringers, treads, risers and well mounted handrails.Details
remove existing exterior stairs and handrails and construct new exterior stairs with new stringers, treads, risers and well mounted handrails. | $20,000 |
| Dec 31, 2025 | Completed final sign-off Mar 2026 | 5800 03rd St | Gadi Construction Inc | unit #1404: bathroom remodel- rip and replace like for like, convert tub to shower, vanity to remain only replace countertop. update mep as needed per code.Details
unit #1404: bathroom remodel- rip and replace like for like, convert tub to shower, vanity to remain only replace countertop. update mep as needed per code. | $18,000 |
| Dec 30, 2025 | Expired or cancelled cancelled Feb 2026 | 322 Rutledge St | Gadi Construction Inc | bathroom remodel like for like with new window.Details
bathroom remodel like for like with new window. | $25,000 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 535 Gates St | Gadi Construction Inc | waterproofing of shower walls in 2 bathrooms.Details
waterproofing of shower walls in 2 bathrooms. | $15,000 |
| Sep 22, 2025 | Completed final sign-off Nov 2025 | 193 Corbett Av | Gadi Construction Inc | bathroom remodel like for like; new subpanel 100amp.Details
bathroom remodel like for like; new subpanel 100amp. | $38,000 |
| Jul 31, 2025 | Completed final sign-off Nov 2025 | 10 Appleton Av | Gadi Construction Inc | unit 12 -adding (n) half bathDetails
unit 12 -adding (n) half bath | $20,000 |
| Jul 30, 2025 | Completed final sign-off Jan 2026 | 38 Bryant St | Gadi Construction Inc | unit 406: convert powder room to full bath at 1/f. convert (e) den to new bedroom. master bath remodeling. bathroom #1 remodeling.Details
unit 406: convert powder room to full bath at 1/f. convert (e) den to new bedroom. master bath remodeling. bathroom #1 remodeling. | $68,000 |
| Jul 8, 2025 | In progress issued Aug 2025 | 2466 19th Av | Gadi Construction Inc, Vazquez Construction | replace existing entrance stairs with new casr in place concrete stairs, terazzo to be replaced inkindDetails
replace existing entrance stairs with new casr in place concrete stairs, terazzo to be replaced inkind | $12,000 |
| Jun 10, 2025 | Expired or cancelled expired Aug 2026 | 425 Liberty St | Gadi Construction Inc | revision to pa # 2024-1218-7099 reduction in sliding glass door size, reduction in the number of skylights, removal of (e) balcony and minor structural revisions based on field conditionsDetails
revision to pa # 2024-1218-7099 reduction in sliding glass door size, reduction in the number of skylights, removal of (e) balcony and minor structural revisions based on field conditions | |
| Apr 8, 2025 | Completed final sign-off Jun 2025 | 1730 Clement St | Gadi Construction Inc | revision to pa# 202501319481 to replace all (e) drywall and insulation in entire house (r30 ceiling and r15 walls).Details
revision to pa# 202501319481 to replace all (e) drywall and insulation in entire house (r30 ceiling and r15 walls). | $55,000 |
| Apr 8, 2025 | Completed final sign-off Jun 2025 | 1732 Clement St | Gadi Construction Inc | 1-bathroom remodel like for likeDetails
1-bathroom remodel like for like | $25,000 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes.Details
revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes. | |
| Mar 3, 2025 | Completed final sign-off Mar 2025 | 2040 Sutter St | Gadi Construction Inc | unit #302: bathroom remodel - like for like. replace tub with tub, no relocation.Details
unit #302: bathroom remodel - like for like. replace tub with tub, no relocation. | $20,000 |
| Feb 18, 2025 | Completed final sign-off Dec 2025 | 135 Wool St | Gadi Construction Inc | garage conversion into living space. creating family room, laundry, bath, officeDetails
garage conversion into living space. creating family room, laundry, bath, office | $65,000 |
| Feb 2, 2025 | Completed final sign-off Aug 2026 | 425 Liberty St | Gadi Construction Inc | remodel to an (e) single family residence: enclose front room, replace separate interior stairs with combined new stair. relocate bathroom on main level, relocate kitchen, new doors to rear from kitchen/living space, (n) skywell well, remodel (e) upstairs bathroom, add new bathroom adjacent to (e).Details
remodel to an (e) single family residence: enclose front room, replace separate interior stairs with combined new stair. relocate bathroom on main level, relocate kitchen, new doors to rear from kitchen/living space, (n) skywell well, remodel (e) upstairs bathroom, add new bathroom adjacent to (e). | $300,000 |
| Jan 31, 2025 | Completed final sign-off Jun 2025 | 1730 Clement St | Gadi Construction Inc | kitchen and 2 bath remodel, like for like. main panel box upgrade.Details
kitchen and 2 bath remodel, like for like. main panel box upgrade. | $60,000 |
| Jan 28, 2025 | Completed final sign-off Dec 2025 | 135 Wool St | Gadi Construction Inc, Mcguinness Mccann Group | replace 7 windows in kind, all over the house not including the garage (aluminum a250). two windows at the front - same operation.Details
replace 7 windows in kind, all over the house not including the garage (aluminum a250). two windows at the front - same operation. | $12,000 |
| Dec 10, 2024 | Completed final sign-off Aug 2025 | 421 Molimo Dr | Gadi Construction Inc | kitchen remodel like for like, no wall demolition or construction, no change in plumbing fixture count.Details
kitchen remodel like for like, no wall demolition or construction, no change in plumbing fixture count. | $16,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 4630 19th St | Gadi Construction Inc | revision to pa #2024-0329-8899 structural detail and calculation to be changedDetails
revision to pa #2024-0329-8899 structural detail and calculation to be changed | |
| Nov 5, 2024 | Completed final sign-off Nov 2024 | 827 Peru Av | Gadi Construction Inc | to obtain a final inspectin for work approved under pa# 202009254951 all work is completeDetails
to obtain a final inspectin for work approved under pa# 202009254951 all work is complete | |
| Nov 5, 2024 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | to comply w/ physical inspection report condo conversion 8588: legalize window replacement for entire dwelling. 717 de haro - 2 windows front facing aluminum. 715 de haro - 3 windows north facing/3east facing. all aluminum. cc #8588. - page 2 (bid & his) item #9 onlyDetails
to comply w/ physical inspection report condo conversion 8588: legalize window replacement for entire dwelling. 717 de haro - 2 windows front facing aluminum. 715 de haro - 3 windows north facing/3east facing. all aluminum. cc #8588. - page 2 (bid & his) item #9 only | $5,000 |
| Oct 29, 2024 | Completed final sign-off Feb 2025 | 2054 31st Av | Gadi Construction Inc | 1 bathroom shower and tub, plumbing fixtures, 4 recess liights, 2gfci, replace fan. no moving walls. fixtures to remain in same location. approx. 56 sq ft. no moving walls fixtures remain in same locationDetails
1 bathroom shower and tub, plumbing fixtures, 4 recess liights, 2gfci, replace fan. no moving walls. fixtures to remain in same location. approx. 56 sq ft. no moving walls fixtures remain in same location | $20,000 |
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 632 05th Av | Gadi Construction Inc | create room in (e) bonus room at the upper fl 3rd lvlDetails
create room in (e) bonus room at the upper fl 3rd lvl | $27,000 |
| Oct 11, 2024 | Completed final sign-off Aug 2025 | 421 Molimo Dr | Gadi Construction Inc | hallway bath remodeling at upper fl (n) master bath at upper flDetails
hallway bath remodeling at upper fl (n) master bath at upper fl | $40,000 |
| Sep 26, 2024 | Completed final sign-off Dec 2024 | 2178 40th Av | Gadi Construction Inc | bathroom remodel like for like to replace shower, vanity toiletm (n) fan, 2 new recess lights, 2 switches. no wall removalDetails
bathroom remodel like for like to replace shower, vanity toiletm (n) fan, 2 new recess lights, 2 switches. no wall removal | $25,000 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 650 40th Av | Gadi Construction Inc | remove unpermitted staircase connecting gr fl and 2nd fl. remove door at master bedroom at lower unit.Details
remove unpermitted staircase connecting gr fl and 2nd fl. remove door at master bedroom at lower unit. | $5,000 |
| Jul 16, 2024 | Completed final sign-off Nov 2024 | 322 Rutledge St | Gadi Construction Inc | bathroom remodel like for like. replace all plumbing fixtures, 2 outlets, recessed lights, tubDetails
bathroom remodel like for like. replace all plumbing fixtures, 2 outlets, recessed lights, tub | $20,000 |
| Jun 18, 2024 | Completed final sign-off Feb 2025 | 116 Wool St | Gadi Construction Inc | revision to pa# 202310108263. mech installation of 7 mini split units and 2 exterior condensers . cancel furance and duct.Details
revision to pa# 202310108263. mech installation of 7 mini split units and 2 exterior condensers . cancel furance and duct. | $12,000 |
| May 30, 2024 | In progress issued May 2024 | 146 Hamerton Av | Gadi Construction Inc | 1 master bathroom remodeling, relocate plumbing fixtures toilet and vanity, replace tub with shower, replace lights, replace outletsDetails
1 master bathroom remodeling, relocate plumbing fixtures toilet and vanity, replace tub with shower, replace lights, replace outlets | $35,000 |
| May 9, 2024 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | extend deck 6' to comply with physical inspector report condo conversion 8588Details
extend deck 6' to comply with physical inspector report condo conversion 8588 | $20,000 |
| May 6, 2024 | In progress issued May 2024 | 271 06th Av | Gadi Construction Inc | revision to 202306139961. water proofing for deck needs to be changed gaco western ub64 water proof membrance for wood substrate deckDetails
revision to 202306139961. water proofing for deck needs to be changed gaco western ub64 water proof membrance for wood substrate deck | $4,000 |
| Apr 9, 2024 | Completed final sign-off Oct 2024 | 285 Mullen Av | Gadi Construction Inc | kitchen and (1) bathroom remodel like for likeDetails
kitchen and (1) bathroom remodel like for like | $45,000 |
| Mar 29, 2024 | Completed final sign-off Mar 2025 | 4630 19th St | Gadi Construction Inc | kitchen remodel, remove bearing wall, install new construction window.Details
kitchen remodel, remove bearing wall, install new construction window. | $30,000 |
| Mar 14, 2024 | Completed final sign-off Jul 2024 | 2419 22nd Av | Gadi Construction Inc | upper floor -bathroom remodel like for like. convert tub to shower. frame off door. relocate toilet, heated flooring. replace vanity. 6-8 recess lights. replace outlet to gfci.1/f: add subpanel.Details
upper floor -bathroom remodel like for like. convert tub to shower. frame off door. relocate toilet, heated flooring. replace vanity. 6-8 recess lights. replace outlet to gfci.1/f: add subpanel. | $20,000 |
| Mar 1, 2024 | Completed final sign-off Mar 2025 | 116 Wool St | Gadi Construction Inc | revision to (e) permit # 202310108263: to construct additive 12 sf at the sw corner of lower level.Details
revision to (e) permit # 202310108263: to construct additive 12 sf at the sw corner of lower level. | |
| Feb 27, 2024 | Completed final sign-off May 2024 | 615 06th Av | Gadi Construction Inc | one bathroom remodel with walls removal & demo closet to create one new master bathroomDetails
one bathroom remodel with walls removal & demo closet to create one new master bathroom | $50,000 |
| Jan 30, 2024 | Completed final sign-off May 2025 | 126 Park St | Gadi Construction Inc | convert wood fire place into gas line fire place. 1 outlet, (1 gasline).Details
convert wood fire place into gas line fire place. 1 outlet, (1 gasline). | $8,000 |
| Dec 21, 2023 | In progress issued Dec 2023 | 717 De Haro St | Gadi Construction Inc | to comply with physical inspection report. #cc8588. condon conversion.Details
to comply with physical inspection report. #cc8588. condon conversion. | $2,000 |
| Dec 21, 2023 | Completed final sign-off Jan 2024 | 1783 Turk St | Gadi Construction Inc | exterior staircase repair per plan approx 20%.Details
exterior staircase repair per plan approx 20%. | $6,500 |
| Nov 30, 2023 | Expired or cancelled cancelled Jan 2026 | 1334 Utah St | Gadi Construction Inc | widening sliding door form 5' to 9' replace door on the back side of the house and on the left side of the houseDetails
widening sliding door form 5' to 9' replace door on the back side of the house and on the left side of the house | $7,000 |
| Nov 2, 2023 | In progress filed Nov 2023, not yet issued | 328 Lawton St | Gadi Construction Inc | kitchen alteration - (e) wall between kitchen and dining room could be removed. the (e) chimney should be removed.Details
kitchen alteration - (e) wall between kitchen and dining room could be removed. the (e) chimney should be removed. | $50,000 |
| Nov 2, 2023 | Completed final sign-off Jan 2024 | 30 Abbey St | Gadi Construction Inc | replace damaged midfloor like for like (stair at back of the house) repair like for like for dry rot/ rotten woodDetails
replace damaged midfloor like for like (stair at back of the house) repair like for like for dry rot/ rotten wood | $6,000 |
| Nov 2, 2023 | Completed final sign-off Jan 2024 | 275 28th St | Gadi Construction Inc | convert the vanity in the bathroom from single to double sink- add insulation interior lathDetails
convert the vanity in the bathroom from single to double sink- add insulation interior lath | $15,000 |
| Oct 16, 2023 | Completed final sign-off Apr 2024 | 767 Bryant St | Gadi Construction Inc | unit #405: (2) bathroom remodels - (1) tub to tub. convert tub to shower. upgrade e/m/p up to code. replace plumbing fixtures. recessed lights in bathroomDetails
unit #405: (2) bathroom remodels - (1) tub to tub. convert tub to shower. upgrade e/m/p up to code. replace plumbing fixtures. recessed lights in bathroom | $40,000 |
| Oct 10, 2023 | Completed final sign-off Feb 2025 | 116 Wool St | Gadi Construction Inc | construct rear addition of 62 sf at garage level. convert 508 sf of garage to new living space. remocel e living room and dining room area. new lighting at remodeled area.Details
construct rear addition of 62 sf at garage level. convert 508 sf of garage to new living space. remocel e living room and dining room area. new lighting at remodeled area. | $150,000 |
| Oct 4, 2023 | Completed final sign-off Mar 2024 | 506 Rockdale Dr | Gadi Construction Inc | basement remodel. remove non-load bearing wall, frame new wall to create (n) laundry room, new wet bar area, (6) new can lights. 6 total. update mep to meet code.Details
basement remodel. remove non-load bearing wall, frame new wall to create (n) laundry room, new wet bar area, (6) new can lights. 6 total. update mep to meet code. | $40,000 |
| Sep 5, 2023 | Completed final sign-off Dec 2023 | 1287 17th Av | Gadi Construction Inc | unit #301: kitchen remodel like for like. replace plumbing fixtures, appliances. update m/e/p/ up to code. 6 new recessed lights.Details
unit #301: kitchen remodel like for like. replace plumbing fixtures, appliances. update m/e/p/ up to code. 6 new recessed lights. | $30,000 |
| Aug 18, 2023 | Completed final sign-off Dec 2023 | 154 08th Av | Gadi Construction Inc | 1 kitchen and 1 bathroom like for likeDetails
1 kitchen and 1 bathroom like for like | $30,000 |
| Aug 16, 2023 | Completed final sign-off Oct 2023 | 850 Capitol Av | Gadi Construction Inc | replace two window headers, headers, the corner, like-for-like, same size as (e), and the corner post like for like, same sizw=e as existing. drywall reair.Details
replace two window headers, headers, the corner, like-for-like, same size as (e), and the corner post like for like, same sizw=e as existing. drywall reair. | $20,000 |
| Aug 8, 2023 | Completed final sign-off Apr 2025 | 30 Berkeley Wy | Gadi Construction Inc | kitchen remodel, powder room remodel washer dryer installation new drainage and water line for washer new vent for dryer new elctricalDetails
kitchen remodel, powder room remodel washer dryer installation new drainage and water line for washer new vent for dryer new elctrical | $40,000 |
| Aug 8, 2023 | Completed final sign-off May 2024 | 999 Green St | Gadi Construction Inc | kitchen remodel like for likeDetails
kitchen remodel like for like | $20,000 |
| Jul 27, 2023 | Expired or cancelled expired Mar 2026 | 219 Oxford St | Gadi Construction Inc | entry remodel - rebuild stairs and modify to new elevation view.Details
entry remodel - rebuild stairs and modify to new elevation view. | $7,000 |
| Jul 13, 2023 | Completed final sign-off Jul 2024 | 439 Connecticut St | Gadi Construction Inc | remodel kitchen: remove non-=load bearing wall - verified by engineer on-site.cDetails
remodel kitchen: remove non-=load bearing wall - verified by engineer on-site.c | $25,000 |
| Jul 6, 2023 | Completed final sign-off Oct 2023 | 1912 10th Av | Gadi Construction Inc | kitchen remodelDetails
kitchen remodel | $30,000 |
| Jun 20, 2023 | Completed final sign-off Sep 2023 | 4630 19th St | Gadi Construction Inc | replace 4 windows to wood , (2) front facing, (2) on on back of house in kind. same size, same location.Details
replace 4 windows to wood , (2) front facing, (2) on on back of house in kind. same size, same location. | $7,500 |
| Jun 13, 2023 | In progress issued Dec 2023 | 271 06th Av | Gadi Construction Inc | 1/f: rebuild balcony. reuse (e) fire exit, new railingDetails
1/f: rebuild balcony. reuse (e) fire exit, new railing | $31,000 |
| Jun 8, 2023 | Completed final sign-off Jun 2025 | 1627 35th Av | Gadi Construction Inc | lowel level remodel: remodel bathroom. new wall to create a separation for laundry. replace 2 windows and a sliding door at rear.Details
lowel level remodel: remodel bathroom. new wall to create a separation for laundry. replace 2 windows and a sliding door at rear. | $40,000 |
| Jun 1, 2023 | Completed final sign-off Mar 2024 | 506 Rockdale Dr | Gadi Construction Inc | rev to pa202304206115. alterations were made the roposed new walls layout on page a1.1.Details
rev to pa202304206115. alterations were made the roposed new walls layout on page a1.1. | |
| May 23, 2023 | Completed final sign-off Aug 2023 | 10 Southard Pl | Gadi Construction Inc | bathroom remodel, like for like.Details
bathroom remodel, like for like. | $30,000 |
| May 2, 2023 | Completed final sign-off Jul 2023 | 2598 Diamond St | Gadi Construction Inc | 2100 sqft of siding replacement from wood to fiber glass cemen t for the back of the two sides. at visible side, smooth lap plank siding.Details
2100 sqft of siding replacement from wood to fiber glass cemen t for the back of the two sides. at visible side, smooth lap plank siding. | $30,000 |
| Apr 20, 2023 | Completed final sign-off Mar 2024 | 506 Rockdale Dr | Gadi Construction Inc | frame new walls to separate laundry and utilities; replace water heater to tankless; install 6 new can lightsDetails
frame new walls to separate laundry and utilities; replace water heater to tankless; install 6 new can lights | $20,000 |
| Apr 20, 2023 | Completed final sign-off Oct 2023 | 1479 Van Dyke Av | Gadi Construction Inc | bathroom remodel like for like;Details
bathroom remodel like for like; | $30,000 |
| Apr 14, 2023 | Expired or cancelled cancelled Jul 2023 | 999 Green St | Gadi Construction Inc, Aaa Construction & Design | 1 kitchen remodel like for like: new cabinets, new appliancesDetails
1 kitchen remodel like for like: new cabinets, new appliances | $25,000 |
| Apr 13, 2023 | Completed final sign-off May 2024 | 1339 Vallejo St | Gadi Construction Inc, Turley Construction | 1 bathroom like for like. no str work.Details
1 bathroom like for like. no str work. | $35,000 |
| Apr 13, 2023 | Completed final sign-off Mar 2024 | 25 Grand View Av | Gadi Construction Inc | 2 bathroom remodel, demo interior wall. 1 powder room remodel like for like and infill existing east side 3rd floor bathroom window. close window in bathroomDetails
2 bathroom remodel, demo interior wall. 1 powder room remodel like for like and infill existing east side 3rd floor bathroom window. close window in bathroom | $80,000 |
| Mar 28, 2023 | Completed final sign-off Jul 2023 | 1940 Sacramento St | Gadi Construction Inc | unit 1: remodel 2 bathroosm. convert tub to shower in the master. in the guest remove a non load bearing wall.Details
unit 1: remodel 2 bathroosm. convert tub to shower in the master. in the guest remove a non load bearing wall. | $60,000 |
| Mar 28, 2023 | Completed final sign-off Aug 2023 | 715 De Haro St | Gadi Construction Inc | convert (1) bathrooms into (2) bathrooms. reconfigure non-bearing wall & add (n) wall & doorway for (n) bedwoom on 1st fl. install (n) vanity & shower. (n) bathroom layout w/ addition of (n) free standing tub. walk in closet in bedroom 1 to expand & relocate door for bedroomDetails
convert (1) bathrooms into (2) bathrooms. reconfigure non-bearing wall & add (n) wall & doorway for (n) bedwoom on 1st fl. install (n) vanity & shower. (n) bathroom layout w/ addition of (n) free standing tub. walk in closet in bedroom 1 to expand & relocate door for bedroom | $48,000 |
| Mar 22, 2023 | Completed final sign-off Aug 2023 | 1634 Dolores St | Gadi Construction Inc | kitchen remodel like for like.Details
kitchen remodel like for like. | $40,000 |
| Mar 16, 2023 | Completed final sign-off Aug 2023 | 12 Commonwealth Av | Gadi Construction Inc | unit #8: bathroom remodel & convert closet to laundry create washer and dryerDetails
unit #8: bathroom remodel & convert closet to laundry create washer and dryer | $20,000 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 2598 Diamond St | Gadi Construction Inc | bathroom remodel - tub to shower.Details
bathroom remodel - tub to shower. | $40,000 |
| Feb 22, 2023 | Completed final sign-off Mar 2023 | 7 Delano Av | Gadi Construction Inc | repair of 50 sq ft approx wood siding like for like - not visible from street.Details
repair of 50 sq ft approx wood siding like for like - not visible from street. | $4,000 |
| Jan 26, 2023 | Completed final sign-off Mar 2023 | 25 Colonial Wy | Gadi Construction Inc | install a wet bar om the first floor.Details
install a wet bar om the first floor. | $20,000 |
| Jan 17, 2023 | Completed final sign-off May 2023 | 350 Alabama St | Gadi Construction Inc | unit 19: powder room remodel like for like, removing a non load bearing wall, installation of (4) recessed lights (2) hanging lightsDetails
unit 19: powder room remodel like for like, removing a non load bearing wall, installation of (4) recessed lights (2) hanging lights | $27,000 |
| Dec 27, 2022 | Completed final sign-off Jul 2023 | 1078 Sutter St | Prosper Construction Dev Inc., Gadi Construction Inc | ground flr: ti includes removing all existing walls and bathroom vanity and install new bathroom vanity and casework as room divider.Details
ground flr: ti includes removing all existing walls and bathroom vanity and install new bathroom vanity and casework as room divider. | $25,000 |
| Dec 27, 2022 | Completed final sign-off Oct 2023 | 827 Peru Av | Gadi Construction Inc | installation of a detached 100 sq. ft. of prefab shed for storage use.Details
installation of a detached 100 sq. ft. of prefab shed for storage use. | $25,000 |
| Dec 20, 2022 | Completed final sign-off Feb 2023 | 2230 Pacific Av | Gadi Construction Inc | patch and repair drywall. lights,install 4 outlets, a recessed lights, maintain rating separation.Details
patch and repair drywall. lights,install 4 outlets, a recessed lights, maintain rating separation. | $1,500 |
| Nov 14, 2022 | Completed final sign-off Mar 2023 | 1303 Masonic Av | Gadi Construction Inc | removing a non-load bearing wall. install new 125 amp subpanel. install pan to washer machine-create drainage line.Details
removing a non-load bearing wall. install new 125 amp subpanel. install pan to washer machine-create drainage line. | $10,000 |
| Nov 14, 2022 | Completed final sign-off Mar 2023 | 110 Channel St | Gadi Construction Inc | unit # 433: 1 bathroom remodel. like for like.Details
unit # 433: 1 bathroom remodel. like for like. | $10,000 |
| Nov 10, 2022 | Never finaled issued Nov 2022, no final | 707 Guerrero St | Gadi Construction Inc | unit 2: run a dedicated line for new washer/dryer and new outlet, connect dryer vent to (e) exhaust duct riser, 100 sq. inch door louver @ closetDetails
unit 2: run a dedicated line for new washer/dryer and new outlet, connect dryer vent to (e) exhaust duct riser, 100 sq. inch door louver @ closet | $3,000 |
| Nov 10, 2022 | Completed final sign-off Jan 2023 | 25 Colonial Wy | Gadi Construction Inc | (1) bathroom remodel like for like. convert tub to walk in shower. no alteration of wall, window or door.Details
(1) bathroom remodel like for like. convert tub to walk in shower. no alteration of wall, window or door. | $10,000 |
| Nov 4, 2022 | Never finaled issued Nov 2022, no final | 2929 Pierce St | Gadi Construction Inc | demo and installation of (2) fire place gas inserts. in the first, opening will be lowered almost to the same level as the floor (lower in almost 1 ft).Details
demo and installation of (2) fire place gas inserts. in the first, opening will be lowered almost to the same level as the floor (lower in almost 1 ft). | $2,500 |
| Oct 27, 2022 | Completed final sign-off Jan 2023 | 980 Ashbury St | Gadi Construction Inc | re-wire (3) bedrooms in the house. demo and installing new drywall (in bedrooms) replacing a faucet in the guest bathroom.Details
re-wire (3) bedrooms in the house. demo and installing new drywall (in bedrooms) replacing a faucet in the guest bathroom. | $18,000 |
| Oct 27, 2022 | Expired or cancelled cancelled Jan 2026 | 898 Francisco St | Gadi Construction Inc | (2) bathrooms remodel. removing a non-load bearing wall.Details
(2) bathrooms remodel. removing a non-load bearing wall. | $80,000 |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 4630 19th St | Gadi Construction Inc | to create powder room to an extg foot print of house.Details
to create powder room to an extg foot print of house. | $21,500 |
| Oct 24, 2022 | Completed final sign-off Jan 2023 | 3253 Harrison St | Gadi Construction Inc | to comply with physical inpsection report #cc-8533Details
to comply with physical inpsection report #cc-8533 | $500 |