Aaa Construction & Design
- Based in
- Novato
- On San Francisco permits
- Jan 2014 to Apr 2023
- Last 24 months
- 0 permits filed
91 permits since 2000: 84 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2023 | Completed final sign-off Dec 2023 | 2167 Hayes St | 1 hallway bathroom remodel like for like: new tub, ne wtub faucet, new shower, new shower faucet, new vanity, new toilet. non structuralDetails
1 hallway bathroom remodel like for like: new tub, ne wtub faucet, new shower, new shower faucet, new vanity, new toilet. non structural | $22,000 |
| Apr 14, 2023 | Expired or cancelled cancelled Jul 2023 | 999 Green St | 1 kitchen remodel like for like: new cabinets, new appliancesDetails
1 kitchen remodel like for like: new cabinets, new appliances | $25,000 |
| Dec 22, 2022 | Completed final sign-off Mar 2023 | 240 Richland Av | (1) kitchen remodel like for like; new cabinets, new appliances.Details
(1) kitchen remodel like for like; new cabinets, new appliances. | $25,000 |
| Dec 22, 2022 | Completed final sign-off Apr 2023 | 290 San Carlos St | (1) 2 bath remodel: master bathroom remodel like for like. (1) guest bathroom remodel like for like.Details
(1) 2 bath remodel: master bathroom remodel like for like. (1) guest bathroom remodel like for like. | $45,000 |
| Nov 1, 2022 | Completed final sign-off Feb 2023 | 176 Arguello Bl | master bathroom remodel: new tub, new valve, new vanity. guest bathroom remodel: new shower pan, new valve, new vanity. no structural work.Details
master bathroom remodel: new tub, new valve, new vanity. guest bathroom remodel: new shower pan, new valve, new vanity. no structural work. | $32,000 |
| Aug 19, 2022 | Completed final sign-off Oct 2022 | 1235 Bay St | unit 2: (1) hallway bathroom remodel like for like: new tub new vanity, new toilet, new tile.Details
unit 2: (1) hallway bathroom remodel like for like: new tub new vanity, new toilet, new tile. | $22,000 |
| Jul 14, 2022 | Completed final sign-off Feb 2024 | 32 Peralta Av | 2/f: remodel bathroom, kitchen, dining & living room.enlarge rear window opening.Details
2/f: remodel bathroom, kitchen, dining & living room.enlarge rear window opening. | $38,600 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 165 Ripley St | one bathroom remodel, like for like. new tub. keep (e) shower/tub faucet,toilet and vanity.Details
one bathroom remodel, like for like. new tub. keep (e) shower/tub faucet,toilet and vanity. | $15,000 |
| Apr 11, 2022 | Completed final sign-off Nov 2023 | 46 Douglass St | (1) kitchen remodel: new cabinets, new coutnertop, new appliances (1) bathroom remodel: new shower pan, new shower valve, new vanity new toiletDetails
(1) kitchen remodel: new cabinets, new coutnertop, new appliances (1) bathroom remodel: new shower pan, new shower valve, new vanity new toilet | $50,000 |
| Apr 11, 2022 | Completed final sign-off Jan 2023 | 1919 Quesada Av | (1) hallway bathroom remodel: new shower pan, new pocket door, new vanity new shower valve, new fan, new toiletDetails
(1) hallway bathroom remodel: new shower pan, new pocket door, new vanity new shower valve, new fan, new toilet | $30,000 |
| Mar 15, 2022 | Completed final sign-off Apr 2022 | 31 Emerson St | non structural (1) bathroom remodel: keep existing tub valve, replace bathtub, new toilet, new vanity.Details
non structural (1) bathroom remodel: keep existing tub valve, replace bathtub, new toilet, new vanity. | $18,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2022 | 125 Miraloma Dr | revision to nn-plan permit 202110049777. replace the wall b/t 2 bathrooms like for like. replace 2 windows in both bathrooms (one in each bath with tempered glass window) close the door opening from master bedroom. windows not visible from the street.Details
revision to nn-plan permit 202110049777. replace the wall b/t 2 bathrooms like for like. replace 2 windows in both bathrooms (one in each bath with tempered glass window) close the door opening from master bedroom. windows not visible from the street. | $10,000 |
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 125 Miraloma Dr | 2- existing bathroom remodel: 1- master bath remodel- 1 tub, shower, vanity, toilet 1- guest bath (3/4 bath) shower, vanity, toilet like for like, no structural modifications. comply w/ cec (150.0(k)5Details
2- existing bathroom remodel: 1- master bath remodel- 1 tub, shower, vanity, toilet 1- guest bath (3/4 bath) shower, vanity, toilet like for like, no structural modifications. comply w/ cec (150.0(k)5 | $70,000 |
| Aug 30, 2021 | Completed final sign-off Dec 2023 | 66 Clifford Tr | full bath remodel, replace in kind shower, double vanity toilet, light, exhaust fan. lights per cenc 150.0 (k). no structural. no layout change.Details
full bath remodel, replace in kind shower, double vanity toilet, light, exhaust fan. lights per cenc 150.0 (k). no structural. no layout change. | $25,000 |
| Aug 30, 2021 | Completed final sign-off Jun 2022 | 425 01st St | unit #1708: kitchen remodel replacement in kind full bath remodel replacement in kind. lights per cenc 150.0 (k). no structural.Details
unit #1708: kitchen remodel replacement in kind full bath remodel replacement in kind. lights per cenc 150.0 (k). no structural. | $50,000 |
| Aug 30, 2021 | Completed final sign-off Mar 2022 | 1101 Green St | unit# 202: kitchen remodel is replacement in kind new sink, appliances, (garbage disposal) refridgerator, dishwasher, range, exhaust hood, high efficency, lights, cabinetry,Details
unit# 202: kitchen remodel is replacement in kind new sink, appliances, (garbage disposal) refridgerator, dishwasher, range, exhaust hood, high efficency, lights, cabinetry, | $40,000 |
| Jun 11, 2021 | Completed final sign-off Jan 2023 | 2843 Balboa St | one 87sf kitchen remodel like for like. one 35sf bath (full) remodel like for like with new shower over tub. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 and (k) 5.Details
one 87sf kitchen remodel like for like. one 35sf bath (full) remodel like for like with new shower over tub. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 3 and (k) 5. | $47,765 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 1845 Leavenworth St | full bath (40sf) and half bath (15sf) remodel with new shower pan in full bath to replace existing. like for like remodel, no structural modification. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 5.Details
full bath (40sf) and half bath (15sf) remodel with new shower pan in full bath to replace existing. like for like remodel, no structural modification. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k) 5. | $30,000 |
| May 27, 2021 | Completed final sign-off Apr 2022 | 16 Carnelian Wy | revision to 202010217037 delete heat pump system, install radiant heating system in media room. replace tank water heater with an on demand type. fur the east wall 6"Details
revision to 202010217037 delete heat pump system, install radiant heating system in media room. replace tank water heater with an on demand type. fur the east wall 6" | $10,000 |
| May 3, 2021 | Never finaled issued May 2021, no final | 50 Lansing St | 1.5 bathroom remodel like for like. no structural work, no framing modificationDetails
1.5 bathroom remodel like for like. no structural work, no framing modification | $35,000 |
| May 3, 2021 | Completed final sign-off Oct 2021 | 33 Prosper St | bathroom remodel like for like. no structural work, no framing modificationDetails
bathroom remodel like for like. no structural work, no framing modification | $25,000 |
| May 3, 2021 | Completed final sign-off Sep 2021 | 1885 Jackson St | bathroom remodel like for like. no structural work, no framing modificationDetails
bathroom remodel like for like. no structural work, no framing modification | $25,000 |
| Mar 31, 2021 | Completed final sign-off Aug 2021 | 1339 22nd Av | master bathroom remodel: replace tub, toilet, vanity - like for like.Details
master bathroom remodel: replace tub, toilet, vanity - like for like. | $20,000 |
| Mar 31, 2021 | Completed final sign-off Jul 2021 | 2255 Franklin St | master bathroom remodel: new shower pan, toilet, vanity - like for like.Details
master bathroom remodel: new shower pan, toilet, vanity - like for like. | $20,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2021 | 1845 Leavenworth St | master bathroom remodel: replce shower pan, toilet, vanity - like for like.Details
master bathroom remodel: replce shower pan, toilet, vanity - like for like. | $27,000 |
| Mar 17, 2021 | Completed final sign-off Aug 2021 | 1413 Guerrero St | (1) bathroom remodel: new shower pan, new shower valve, new toilet, new vanity, new tile.Details
(1) bathroom remodel: new shower pan, new shower valve, new toilet, new vanity, new tile. | $28,683 |
| Mar 17, 2021 | Completed final sign-off Jun 2021 | 215 Cole St | master bathroom remodel: new shower pan, new shower valve, new toilet, new vanity, new tile.Details
master bathroom remodel: new shower pan, new shower valve, new toilet, new vanity, new tile. | $22,970 |
| Jan 28, 2021 | Completed final sign-off Mar 2021 | 214 Molimo Dr | 1) bathroom remodel. like for like. replace tub, faucet, fan, window, light, electrical upgrade for dedicated gfci.Details
1) bathroom remodel. like for like. replace tub, faucet, fan, window, light, electrical upgrade for dedicated gfci. | $20,000 |
| Jan 28, 2021 | Completed final sign-off Feb 2023 | 863 Haight St | unit 3: (1) kitchen remodel. like for like. cabinet counters, appliance replacement, electrical upgrade and dedicated lines, gfci, new lighting.Details
unit 3: (1) kitchen remodel. like for like. cabinet counters, appliance replacement, electrical upgrade and dedicated lines, gfci, new lighting. | $35,000 |
| Jan 28, 2021 | Completed final sign-off Feb 2022 | 1201 California St | (1) kitchen remodel. like for like - cabinets, appliances, recessed lights, gfci. (1) bathroom remodel: like for like, vanity, toilet, fan, gfci, faucet, light replacement, electrical panel.Details
(1) kitchen remodel. like for like - cabinets, appliances, recessed lights, gfci. (1) bathroom remodel: like for like, vanity, toilet, fan, gfci, faucet, light replacement, electrical panel. | $50,000 |
| Nov 5, 2020 | Completed final sign-off Feb 2021 | 2010 Broderick St | bathroom remodel like for like: new tub, new faucet, new toilet, new vanity.Details
bathroom remodel like for like: new tub, new faucet, new toilet, new vanity. | $22,450 |
| Oct 21, 2020 | Completed final sign-off Apr 2022 | 16 Carnelian Wy | 1/f: convert an (e) utility room & storage to a media room & new bathroom.Details
1/f: convert an (e) utility room & storage to a media room & new bathroom. | $44,595 |
| Aug 28, 2020 | Completed final sign-off Feb 2021 | 57 Theresa St | remodel bathroomDetails
remodel bathroom | $15,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2021 | 57 Theresa St | interior kitchen remodel. remove 2 non load-bearing interior partitions, replace ( e ) rear window w/ exterior french doors. remodel kitchen - cabinets, counters, appliances. electrical upgrade.Details
interior kitchen remodel. remove 2 non load-bearing interior partitions, replace ( e ) rear window w/ exterior french doors. remodel kitchen - cabinets, counters, appliances. electrical upgrade. | $30,000 |
| Aug 3, 2020 | Completed final sign-off Oct 2021 | 1099 23rd St | remodel 2 bathrooms, like for like. master bath - 55 sq ft, half bath - 25 sq ft.Details
remodel 2 bathrooms, like for like. master bath - 55 sq ft, half bath - 25 sq ft. | $31,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 88 King St | bathroom remodel, like for likeDetails
bathroom remodel, like for like | $20,000 |
| Jun 11, 2020 | Completed final sign-off Nov 2020 | 10 Clayton St | 2 bathroom remodels - like for like. no layout changeDetails
2 bathroom remodels - like for like. no layout change | $39,000 |
| May 26, 2020 | Completed final sign-off Aug 2020 | 207 Flood Av | bathroom remodel like for like, electrical upgrade.Details
bathroom remodel like for like, electrical upgrade. | $12,000 |
| Apr 23, 2020 | Completed final sign-off Sep 2020 | 2255 Franklin St | comply w/ complaint #202027689, #202027880, #202028301: kitchen remodel like for like - new cabinets, new sink, new appliances, new faucet & garbage disposal. electrical outlets upgrade through out the house, sub-panel upgrade, new recess led lights 14 units, 4 ceiling lights.Details
comply w/ complaint #202027689, #202027880, #202028301: kitchen remodel like for like - new cabinets, new sink, new appliances, new faucet & garbage disposal. electrical outlets upgrade through out the house, sub-panel upgrade, new recess led lights 14 units, 4 ceiling lights. | $10,000 |
| Mar 12, 2020 | Completed final sign-off Jun 2020 | 123 Corwin St | hallway bathroom remodel like for like. new tub, new valve, new toilet, new vanityDetails
hallway bathroom remodel like for like. new tub, new valve, new toilet, new vanity | $20,000 |
| Mar 12, 2020 | Completed final sign-off Oct 2020 | 213 06th Av | amend permit #2020 0211 4113. change from half bath to hallway bathroom new tub, new sink, new toilet, 65 sq ft.Details
amend permit #2020 0211 4113. change from half bath to hallway bathroom new tub, new sink, new toilet, 65 sq ft. | |
| Feb 11, 2020 | Completed final sign-off Oct 2020 | 213 06th Av | unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanitiesDetails
unit b. remodel kitchen, master bath and half bath. new cabinets, appliances, sinks, shower pan, toilets, vanities | $50,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2020 | 945 Capp St | 1 hallway 150 sq ft bathroom remodel, like for like. keep existing bathtub, new shower valve, new toilet, new vanity, new tileDetails
1 hallway 150 sq ft bathroom remodel, like for like. keep existing bathtub, new shower valve, new toilet, new vanity, new tile | $19,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2020 | 54 Allen St | 2 bath remodel in kind. no layout change. replacing toilets, vanities, bath tubs. gfci outlets, replace fans.Details
2 bath remodel in kind. no layout change. replacing toilets, vanities, bath tubs. gfci outlets, replace fans. | $40,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 3701 Divisadero St | unit #203; bathroom remodel, install new vanity, toilet, bathtub new fan and reussed lights, moisture sensing switchDetails
unit #203; bathroom remodel, install new vanity, toilet, bathtub new fan and reussed lights, moisture sensing switch | $18,000 |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 82 Idora Av | bath remodel, shower to tub connection. install new plumbing , vanity, tile, replace light fixtures, replace fan, 5x8 bathDetails
bath remodel, shower to tub connection. install new plumbing , vanity, tile, replace light fixtures, replace fan, 5x8 bath | $22,000 |
| Aug 5, 2019 | Completed final sign-off Oct 2019 | 2595 20th Av | bathroom remodel - replace shower pan, new tub, new toilet, new vanity. all plumbing stays in same location. update electrical, replace outlet with gfci. replace fan.Details
bathroom remodel - replace shower pan, new tub, new toilet, new vanity. all plumbing stays in same location. update electrical, replace outlet with gfci. replace fan. | $18,000 |
| Jun 28, 2019 | Completed final sign-off Oct 2019 | 1839 15th St | remodel kitchen & bathroom, like for like. install 24 new led reccessed lights, replace switches and outlets, and gfi.Details
remodel kitchen & bathroom, like for like. install 24 new led reccessed lights, replace switches and outlets, and gfi. | $49,950 |
| May 21, 2019 | Completed final sign-off Jan 2020 | 2831 Bryant St | water damage repair. new shower pan. no plumbing, valve or elec repair/replacementDetails
water damage repair. new shower pan. no plumbing, valve or elec repair/replacement | $15,500 |
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 4775 19th St | one bathroom remodel: new faucet new shower pan, new toilet and new vanity. no change on wallsDetails
one bathroom remodel: new faucet new shower pan, new toilet and new vanity. no change on walls | $33,000 |
| Feb 20, 2019 | Completed final sign-off May 2019 | 610 Teresita Bl | lower level bathroom remodel. new vanity, toilet, new shower pan. remodel in kind. no structural work. comply w cecDetails
lower level bathroom remodel. new vanity, toilet, new shower pan. remodel in kind. no structural work. comply w cec | $20,000 |
| Jan 22, 2019 | Completed final sign-off Jul 2019 | 88 King St | 2 guest baths, new faucets, new toilets, new vanities, keeping existing tubs, master bath 8x6: new shower pan, new toilet and new vanityDetails
2 guest baths, new faucets, new toilets, new vanities, keeping existing tubs, master bath 8x6: new shower pan, new toilet and new vanity | $60,000 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 1255 California St | remodel kitchen like for like: new cabinets, counter tops, faucet, appliances, garbage disposal, 6 recessed lights, and 8 outlets.Details
remodel kitchen like for like: new cabinets, counter tops, faucet, appliances, garbage disposal, 6 recessed lights, and 8 outlets. | $12,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2019 | 51 Dalewood Wy | revision for permit 201809049033Details
revision for permit 201809049033 | $2,000 |
| Sep 4, 2018 | Completed final sign-off Feb 2019 | 51 Dalewood Wy | (1) guest bathroom remodel like for like: new tub, new shower pan, new vanity, new toilet. (1) sub-panel upgrade. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
(1) guest bathroom remodel like for like: new tub, new shower pan, new vanity, new toilet. (1) sub-panel upgrade. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $35,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2018 | 785 Golden Gate Av | one bathroom remodel like for like, new tub, new faucet, new vanity and new toilet. all extg locationDetails
one bathroom remodel like for like, new tub, new faucet, new vanity and new toilet. all extg location | $25,000 |
| Jun 26, 2018 | Completed final sign-off Feb 2019 | 645 Haight St | unit #3b - new bath at (e) stub out location at upper level. bringing ele upto code. all work is interior only. no stuctrual changesDetails
unit #3b - new bath at (e) stub out location at upper level. bringing ele upto code. all work is interior only. no stuctrual changes | $25,000 |
| Jun 21, 2018 | Completed final sign-off Dec 2018 | 401 Peninsula Av | kitchen remodel, like for likeDetails
kitchen remodel, like for like | $30,000 |
| May 16, 2018 | Completed final sign-off Feb 2019 | 645 Haight St | ste 3b; 1 kitchen remodel like for like; new cabinets, new counter tops, new appliances. 1 guest bathroom remodel like for like; new tub, new tile, new faucet, new toilet, new vanity, 1 subpanel upgrade.Details
ste 3b; 1 kitchen remodel like for like; new cabinets, new counter tops, new appliances. 1 guest bathroom remodel like for like; new tub, new tile, new faucet, new toilet, new vanity, 1 subpanel upgrade. | $45,000 |
| May 9, 2018 | Completed final sign-off Jan 2019 | 3485 16th St | all (e) fire ratings to be maintained. changing the hallway floor plan to add a standing shower to the (e) half bath. no structural work.Details
all (e) fire ratings to be maintained. changing the hallway floor plan to add a standing shower to the (e) half bath. no structural work. | $30,000 |
| Mar 23, 2018 | Completed final sign-off May 2018 | 142 Beaumont Av | bathroom remodel in-kind, replace tile/fixtures, no structural changes, upgrade electrical & plumbingDetails
bathroom remodel in-kind, replace tile/fixtures, no structural changes, upgrade electrical & plumbing | $18,000 |
| Feb 27, 2018 | Completed final sign-off May 2018 | 863 Haight St | guest bathroom remodel like for like new tub new faucet new tile new vanity new toiletDetails
guest bathroom remodel like for like new tub new faucet new tile new vanity new toilet | $16,300 |
| Feb 27, 2018 | Completed final sign-off May 2018 | 2211 California St | unit 300 ,kitchen remodel like for like, new cabinets, new appliances, new sink, new faucetDetails
unit 300 ,kitchen remodel like for like, new cabinets, new appliances, new sink, new faucet | $21,900 |
| Feb 13, 2018 | Completed final sign-off Jul 2018 | 403 Main St | unit #215: (1) kitchen remodel like for like: new cabinet, new sink, new appliances. no rough framing. maher n/aDetails
unit #215: (1) kitchen remodel like for like: new cabinet, new sink, new appliances. no rough framing. maher n/a | $25,000 |
| Feb 13, 2018 | Completed final sign-off Jul 2018 | 403 Main St | unit #215: (1) master bathroom remodel like for like: new tub, new toilet, new vanity, new tile. (1) guest bathroom remodel: new shower pan, new vanity, new toilet, new tile. maher n/aDetails
unit #215: (1) master bathroom remodel like for like: new tub, new toilet, new vanity, new tile. (1) guest bathroom remodel: new shower pan, new vanity, new toilet, new tile. maher n/a | $35,000 |
| Jan 10, 2018 | Completed final sign-off Feb 2019 | 920 Harrison St | unit 8: (1) kitchen remodel- new cabinets, new countertop, new appliances, new sink, new faucet, new garbage disposal. (1) master bathroom remodel- new vinity, new toilet, new shower pan, new faucet, new tiles.Details
unit 8: (1) kitchen remodel- new cabinets, new countertop, new appliances, new sink, new faucet, new garbage disposal. (1) master bathroom remodel- new vinity, new toilet, new shower pan, new faucet, new tiles. | $35,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 286 Parnassus Av | remdel guest bathroom, like for likeDetails
remdel guest bathroom, like for like | $16,000 |
| Sep 29, 2017 | Never finaled issued Sep 2017, no final | 831 33rd Av | remodel bathroom - like for likeDetails
remodel bathroom - like for like | $12,500 |
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 2211 California St | unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tileDetails
unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tile | $35,000 |
| May 19, 2017 | Completed final sign-off Jan 2021 | 2926 Kirkham St | kitchen remodel, upgrade electrical system under separate permit, no structural work, no wall modification/removalDetails
kitchen remodel, upgrade electrical system under separate permit, no structural work, no wall modification/removal | $15,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 601 Van Ness Av | remove (e) kitchen cabinets, faucet, countertops, sink, re-do plumbing. replace with new ones. replace (e) carpets and laminate floors with engineered hardwood floors. n/a for maher.Details
remove (e) kitchen cabinets, faucet, countertops, sink, re-do plumbing. replace with new ones. replace (e) carpets and laminate floors with engineered hardwood floors. n/a for maher. | $30,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2017 | 2760 Sacramento St | 1 kitchen remodel like for like: new cabinets, new appliancess, new sink and faucet, new counter tops, new washer and dryer. upgrade electrical subpanel.Details
1 kitchen remodel like for like: new cabinets, new appliancess, new sink and faucet, new counter tops, new washer and dryer. upgrade electrical subpanel. | $25,750 |
| Apr 24, 2017 | Completed final sign-off Oct 2017 | 200 Whitney St | one kitchen remodel, like for like. new kitchen cabinets, new counter top, new sink and existing appliances.Details
one kitchen remodel, like for like. new kitchen cabinets, new counter top, new sink and existing appliances. | $15,500 |
| Jan 3, 2017 | Never finaled issued Jan 2017, no final | 3485 16th St | guest bathroom remodel, new shower valve new shower pan new toilet, new vanity new tile, new fan sub panel upgrade add 7 led lights in hte hallway and dining room soffit, add 30 outlets, in al lthe bedrooms.Details
guest bathroom remodel, new shower valve new shower pan new toilet, new vanity new tile, new fan sub panel upgrade add 7 led lights in hte hallway and dining room soffit, add 30 outlets, in al lthe bedrooms. | $25,000 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 1460 Webster St | unit 5: half bathroom remodel: replace vanity, toilet, vanity light, washer & ductless dryer. no structural workDetails
unit 5: half bathroom remodel: replace vanity, toilet, vanity light, washer & ductless dryer. no structural work | $6,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2017 | 900 Bush St | bathroom remodel like for like - no strucal work- n/a maher ord. 155-13Details
bathroom remodel like for like - no strucal work- n/a maher ord. 155-13 | $10,000 |
| Aug 22, 2016 | Completed final sign-off Oct 2016 | 101 Harrison St | bathroom remodel (like for like), no structural removed, cosmetic upgrade.Details
bathroom remodel (like for like), no structural removed, cosmetic upgrade. | $5,000 |
| Jul 11, 2016 | Completed final sign-off May 2017 | 2453 Chestnut St | revision to 201507161701 and 201507302948 to revise shearwall design and detail to (n) steel moment frame at internal stair, maher not reqDetails
revision to 201507161701 and 201507302948 to revise shearwall design and detail to (n) steel moment frame at internal stair, maher not req | $5,000 |
| May 9, 2016 | Completed final sign-off Jan 2017 | 617 Capp St | like for like: guest bathroom remodel: new bathrub, new rough-in valve, new tile, new tiolet, new vanity.Details
like for like: guest bathroom remodel: new bathrub, new rough-in valve, new tile, new tiolet, new vanity. | $10,000 |
| Feb 18, 2016 | Completed final sign-off May 2017 | 2453 Chestnut St | revision to 201507302948 to add 1 sink in laundry room on 2fl,change fixture locations at bath 2 and 4,change closets and entry door at bedrm 3, remove door at bath 1, add door at laundry 3rd floorDetails
revision to 201507302948 to add 1 sink in laundry room on 2fl,change fixture locations at bath 2 and 4,change closets and entry door at bedrm 3, remove door at bath 1, add door at laundry 3rd floor | |
| Feb 2, 2016 | Completed final sign-off May 2017 | 2453 Chestnut St | construct (n) rear yard fence (10' high). n/a ordinance #155-13.Details
construct (n) rear yard fence (10' high). n/a ordinance #155-13. | $3,000 |
| Jan 25, 2016 | Completed final sign-off Jul 2016 | 1259 18th Av | 2nd floor: kitchen renovation. like for like. all lighting to be led. install built-in shelves in living room. 3rd floor: 1.5 hall bath renovation. like for like. electrical panel upgrade in garage in garage. no walls removed or relocated.Details
2nd floor: kitchen renovation. like for like. all lighting to be led. install built-in shelves in living room. 3rd floor: 1.5 hall bath renovation. like for like. electrical panel upgrade in garage in garage. no walls removed or relocated. | $15,000 |
| Jan 5, 2016 | Completed final sign-off May 2017 | 2453 Chestnut St | revisions to permit 201507302948; structural modifications only. new psl framing at roof, new post @3rd flr, new psl at 2nd flr; maher n/aDetails
revisions to permit 201507302948; structural modifications only. new psl framing at roof, new post @3rd flr, new psl at 2nd flr; maher n/a | $2,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2017 | 787 25th Av | revision to 201507302930. relocate plywood sheathing 1st and 2nd flrs. remove e load bearing wall, provide new beam and postsDetails
revision to 201507302930. relocate plywood sheathing 1st and 2nd flrs. remove e load bearing wall, provide new beam and posts | $5,000 |
| Oct 27, 2015 | Completed final sign-off May 2016 | 2443 Clement St | new shower valve, new wall tile, new vanity.Details
new shower valve, new wall tile, new vanity. | $8,000 |
| Aug 12, 2015 | Completed final sign-off May 2016 | 2443 Clement St | master bathroom remodel, new lighting, new toilet, new shower valve, new vanity. no change on wallsDetails
master bathroom remodel, new lighting, new toilet, new shower valve, new vanity. no change on walls | $10,000 |
| Jul 30, 2015 | Completed final sign-off Mar 2017 | 787 25th Av | remodel(e)residence,plan reconfiguration,replace all(e)doors/windows,garage door expansion,n/garage door/n bathroom add'n at the top floor, new skylights. re-create original columns at garage, recess street windows 3" .note: 9/10/2015, mpang replaced all arch'l sheets and 4 struc'l per preservationDetails
remodel(e)residence,plan reconfiguration,replace all(e)doors/windows,garage door expansion,n/garage door/n bathroom add'n at the top floor, new skylights. re-create original columns at garage, recess street windows 3" .note: 9/10/2015, mpang replaced all arch'l sheets and 4 struc'l per preservation | $150,000 |
| Jul 30, 2015 | Completed final sign-off May 2017 | 2453 Chestnut St | interior remodel of 2 residences. 2453: addition of 2 bathrooms, relocate kitchen from 2nd floor to 1st floor. update extg bathroom & add nw bedroom on 2nd floor. add interior staircase connection 1st & 2nd fl. 2455: add 1 bathroom. add 1 bedroom. update bathroom & kitchen. ref app# 201507161701.Details
interior remodel of 2 residences. 2453: addition of 2 bathrooms, relocate kitchen from 2nd floor to 1st floor. update extg bathroom & add nw bedroom on 2nd floor. add interior staircase connection 1st & 2nd fl. 2455: add 1 bathroom. add 1 bedroom. update bathroom & kitchen. ref app# 201507161701. | $200,000 |
| Jul 20, 2015 | Completed final sign-off May 2017 | 2453 Chestnut St | in both units and garage - remove sheetrocks for electrical upgrade.(wall coverings) not remodelling or removing walls. n/a ordinance #155-13Details
in both units and garage - remove sheetrocks for electrical upgrade.(wall coverings) not remodelling or removing walls. n/a ordinance #155-13 | $10,000 |
| Jul 16, 2015 | Completed final sign-off May 2017 | 2453 Chestnut St | xint. remodel of 1st fl. residence. excavtion @ 1st fl. to increase ceiling hght & patio. 1st flr: new living room, dinig, room, bedroom & bath. replace 30 windows in-kind. all new windows to be wd. clad casement. int stair, kitchen, 2nd & 3rd fl. work under separate permit. excavation <50 c.y.Details
xint. remodel of 1st fl. residence. excavtion @ 1st fl. to increase ceiling hght & patio. 1st flr: new living room, dinig, room, bedroom & bath. replace 30 windows in-kind. all new windows to be wd. clad casement. int stair, kitchen, 2nd & 3rd fl. work under separate permit. excavation <50 c.y. | $300,000 |
| Jan 17, 2014 | Completed final sign-off May 2014 | 300 03rd St | unit#914: replace bathtub, toilet & vanity in same position. change water controls from 2 to 1. tile on floor and walls to be removed/replaced. quiet rolled underlayment i/c rating 54. replace ceiling sheetrock from water damage. replace fan/light in same location. repaint.Details
unit#914: replace bathtub, toilet & vanity in same position. change water controls from 2 to 1. tile on floor and walls to be removed/replaced. quiet rolled underlayment i/c rating 54. replace ceiling sheetrock from water damage. replace fan/light in same location. repaint. | $6,500 |