Hugh King
- Listed as
- engineer
- Firm
- Salas Obrien Engineers
- Based in
- San Jose
- On San Francisco permits
- Sep 2020 to Jul 2025
4 permits since 2000 (engineer on 4 permits): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2025 | In progress filed Jul 2025, not yet issued | 555 Pine St | modification to (e) telecommunications facility t-mobile antennas; remove (e) 6102 cabinet; replace 2 smaller cabinet b160 & 6160 within (e) lease space; remove 3 (e) antennas per sector and replace w/2 new antennas per sector; remove tmas and replace w/(n) rrus. final config 6 antennas, 6 rrus,Details
modification to (e) telecommunications facility t-mobile antennas; remove (e) 6102 cabinet; replace 2 smaller cabinet b160 & 6160 within (e) lease space; remove 3 (e) antennas per sector and replace w/2 new antennas per sector; remove tmas and replace w/(n) rrus. final config 6 antennas, 6 rrus, | $45,000 | |
| Mar 7, 2025 | In progress filed Mar 2025, not yet issued | 389 09th Av | install 2 (n) frp screens + 2 (n) radomes; remove 6 (e) antennas + install 6 (n) antennas; remove 1 (e) cadinet, install 2 (n) cabinets; install (n) batteriesDetails
install 2 (n) frp screens + 2 (n) radomes; remove 6 (e) antennas + install 6 (n) antennas; remove 1 (e) cadinet, install 2 (n) cabinets; install (n) batteries | $85,000 | |
| Jun 11, 2024 | In progress issued Mar 2025 | 650 California St | Richlen Construction | retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system toDetails
retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to | $1,786,903 |
| Sep 14, 2020 | Completed final sign-off Jun 2022 | 1 Mccoppin St | L.D. Strobel Co Ltd | rooftop only: proposed mod to e tmobile telecom facility to consist of remove 3 d rfs quad antennas 3 n rfs octo and 3 n air 6449 b41 antennas-remove and replace 6 raduis remove 3 e tmas remove 3 radios install 2 n cabinets and supporting work per planDetails
rooftop only: proposed mod to e tmobile telecom facility to consist of remove 3 d rfs quad antennas 3 n rfs octo and 3 n air 6449 b41 antennas-remove and replace 6 raduis remove 3 e tmas remove 3 radios install 2 n cabinets and supporting work per plan | $25,000 |