Henry Holbrook Hyde Iii
- Listed as
- engineer
- Firm
- Hyde Engineering Services
- Based in
- Brisbane
- On San Francisco permits
- Jun 2018 to Feb 2021
16 permits since 2000 (engineer on 16 permits): 1 completed, 1 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2021 | Expired or cancelled expired Nov 2025 | 353 Sacramento St | Western Machinery Electric, The Electrical Testing Company Llc | 23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location.Details
23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location. | $45,000 |
| Nov 12, 2020 | Completed final sign-off Jul 2022 | 1800 Pacific Av | Gil Construction & Assoc Inc., Beyond Basics Construction | install new 2 hr. fire rated walls to enlarge existing electrical room, 90 minute double doors at fire rated wall, new install new switchgear and residential meters. install temporary meters to facilitate replacement.Details
install new 2 hr. fire rated walls to enlarge existing electrical room, 90 minute double doors at fire rated wall, new install new switchgear and residential meters. install temporary meters to facilitate replacement. | $5,000 |
| Nov 26, 2019 | Expired or cancelled cancelled Nov 2022 | 50 Fremont St | installation of (11) lithium ion battery energy storage system 915kw/2393kwh. installation includes: battery meters, site meters, ac disconnects & 500kvc transformer, 400 kvc transformer to be installed in parking garage utility room.Details
installation of (11) lithium ion battery energy storage system 915kw/2393kwh. installation includes: battery meters, site meters, ac disconnects & 500kvc transformer, 400 kvc transformer to be installed in parking garage utility room. | $500,000 | |
| Jun 28, 2018 | Expired or cancelled cancelled Nov 2022 | 499 Illinois St | garage level. install 588 kwh energy storage. system will reduce peak demand in bldg.Details
garage level. install 588 kwh energy storage. system will reduce peak demand in bldg. | $24,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Feb 2024 | 360 03rd St | installation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a **Details
installation of (2) stem lithium ion battery energy storage system (ess) will be used to offset peak demand charges by discharging directly into the facilities elec. distributtion system. the monitoring and control system detects both when to charge, and when to discharge. ** maher: n/a ** | $30,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 201 03rd St | installation of (2) stem lithium battery eneryg storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system, the monitoring and control system detects both when to charge, and when to dischageDetails
installation of (2) stem lithium battery eneryg storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system, the monitoring and control system detects both when to charge, and when to dischage | $30,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Jun 2024 | 250 Beach St | installation of 2 stem lithium ion battery energy storage systems ess. the ess will be used to offset peak demand charges by discharging directly into facilities electricla distribution system. monitoring and constorlling detects both when to charge and dischargeDetails
installation of 2 stem lithium ion battery energy storage systems ess. the ess will be used to offset peak demand charges by discharging directly into facilities electricla distribution system. monitoring and constorlling detects both when to charge and discharge | $7,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 200 Beach St | installation of 1 stem lithium ion battery energy storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution syste. the monitoring and controlling detects both wen to charge and discharge. ** maher: n/a **Details
installation of 1 stem lithium ion battery energy storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution syste. the monitoring and controlling detects both wen to charge and discharge. ** maher: n/a ** | $7,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 345 Spear St | installation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge.Details
installation of (6) stem lithium ion battery energy storage system (ess) the ess will be used to offset peak demand charges by discharging directly into the facilities elec. distribution system. the monitoring and controlling detects both when to charge, and when to discharge. | $80,000 | |
| Jun 22, 2018 | Expired or cancelled cancelled Nov 2022 | 150 California St | installation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to dischargeDetails
installation of 2 stem lithium ion batter enery storage system ess. the ess will be used to offset peak demand charges by discharging directly into the facilities electrical distribution system. the monitoring and contnrolling detects both when to charge and when to discharge | $55,000 | |
| Jun 12, 2018 | Never finaled filed Jun 2018, never issued | 250 The Embarcadero | install 264 kw/470 kwh energy storage. the system will be monitored remotely and will reduce peak loads maher naDetails
install 264 kw/470 kwh energy storage. the system will be monitored remotely and will reduce peak loads maher na | $38,000 | |
| Jun 12, 2018 | Expired or cancelled cancelled Nov 2022 | 409 Illinois St | install 5x tower of stem power store model 3.2.2 total 330kw/587 kwh energy storage. this system is reffered to as behind the meter and will be used to reduce peakloads. the system will be minitored remotely maher naDetails
install 5x tower of stem power store model 3.2.2 total 330kw/587 kwh energy storage. this system is reffered to as behind the meter and will be used to reduce peakloads. the system will be minitored remotely maher na | $48,000 | |
| Jun 12, 2018 | Expired or cancelled cancelled Nov 2022 | 455 Mission Bay Blvd South | install energy storage system using lithium ion batteries to reduce peak bld load. the system is monitored remotely and will discharge power to reduce bld peak power load maher naDetails
install energy storage system using lithium ion batteries to reduce peak bld load. the system is monitored remotely and will discharge power to reduce bld peak power load maher na | $48,000 | |
| Jun 8, 2018 | Expired or cancelled cancelled Nov 2022 | 2 Harrison St | installation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software.Details
installation of two stem 66kw/117.7kwh lithium ion battery storage units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software. | $52,998 | |
| Jun 8, 2018 | Expired or cancelled cancelled Nov 2022 | 303 02nd St | basement - installation of 2 stem 66k/117.5kwh lithium ion battery units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoriing system will be installed as a tracking softwareDetails
basement - installation of 2 stem 66k/117.5kwh lithium ion battery units. this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoriing system will be installed as a tracking software | $45,000 | |
| Jun 6, 2018 | Expired or cancelled cancelled Nov 2022 | 100 01st St | 201805108727installation of two stem 66k/117.5kwh lithiumm ion battery energy storage units,this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking softwareDetails
201805108727installation of two stem 66k/117.5kwh lithiumm ion battery energy storage units,this will be utilized to offset peak demand charges by discharging during periods of high demand. the monitoring system will be installed as a tracking software | $26,309 |