Western Machinery Electric
- Based in
- Benicia
- On San Francisco permits
- Aug 2008 to Feb 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2021 | Expired or cancelled expired Nov 2025 | 353 Sacramento St | 23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location.Details
23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to size will be moved adjacent to the (e) location. | $45,000 |
| Feb 27, 2013 | Completed final sign-off Nov 2013 | 1 La Avanzada | remove extg kofy generator. install new generator. relocate kfsf generator. install new structural pads. install new epdu. connect epdu to tenant loads as detailed. connect new gas to extg site fuel system.Details
remove extg kofy generator. install new generator. relocate kfsf generator. install new structural pads. install new epdu. connect epdu to tenant loads as detailed. connect new gas to extg site fuel system. | $865,000 |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 1000 Van Ness Av | work @ residential units only. remove (e) 200 hp motor from site. transport, install, cable in & aligh a new ul fire pump. rated motor & any parts line itemed within. replace the transition times 1at for function before testing the system. change contractor set 1m to check for contact condition.Details
work @ residential units only. remove (e) 200 hp motor from site. transport, install, cable in & aligh a new ul fire pump. rated motor & any parts line itemed within. replace the transition times 1at for function before testing the system. change contractor set 1m to check for contact condition. | $10,820 |