Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2023 | Never finaled issued Aug 2023, no final | 4232 Mission St | Ampex Engineering & Co | revision to pa# 202012090669, add bathroom, level basement floor adjacent to adu. add partial height 1-hour rated wall to max 6'-8" above grade at rear yard with new electric service panel.Details
revision to pa# 202012090669, add bathroom, level basement floor adjacent to adu. add partial height 1-hour rated wall to max 6'-8" above grade at rear yard with new electric service panel. | $20,000 |
| Apr 6, 2023 | Completed final sign-off May 2025 | 2121 Webster St | Moroso Construction Inc | penthouse 5-unit 705: t.i. new partitioning, finishes, millwork, plumbing fixtures, kitchen appliances.Details
penthouse 5-unit 705: t.i. new partitioning, finishes, millwork, plumbing fixtures, kitchen appliances. | $1,413,845 |
| Apr 6, 2023 | Completed final sign-off May 2025 | 2121 Webster St | Moroso Construction Inc | penthouse 4-unit 704: t.i. renovationDetails
penthouse 4-unit 704: t.i. renovation | $413,845 |
| Mar 15, 2023 | Completed final sign-off May 2023 | 2121 Webster St | Moroso Construction Inc | unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section.Details
unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section. | $5,000 |
| Mar 15, 2023 | Completed final sign-off May 2023 | 2121 Webster St | Moroso Construction Inc | unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section.Details
unit re-allocation of 175 sq.ft. from penthouse unit 4 to penthouse unit 5 on 7/f in compliance with planning code section 317 underneath the 25% threshold in that code section. | $5,000 |
| Sep 12, 2022 | Completed final sign-off May 2023 | 668 Page St | Gadi Construction Inc | all work to be done within the existing boundary of the building. revision to 202109037758. remove kitchen remodel work from scope. remove roposed closet indressing room. remove proposed 2nd window in dressing room. change bathroom w sliding doorDetails
all work to be done within the existing boundary of the building. revision to 202109037758. remove kitchen remodel work from scope. remove roposed closet indressing room. remove proposed 2nd window in dressing room. change bathroom w sliding door | |
| Jul 8, 2022 | Completed final sign-off Dec 2022 | 126 23rd Av | build new wood deck and exterior stair at yardDetails
build new wood deck and exterior stair at yard | $15,000 | |
| Sep 3, 2021 | Never finaled issued Feb 2022, no final | 668 Page St | #668: interior kitchen and bath remodel of 1 unit. includes new finishes and fixtures, electrical, plumbing, and minor structural.Details
#668: interior kitchen and bath remodel of 1 unit. includes new finishes and fixtures, electrical, plumbing, and minor structural. | $50,000 | |
| Jun 30, 2021 | Never finaled issued Jul 2021, no final | 126 23rd Av | foundation upgrade, remodel 2nd floor bath in kind.Details
foundation upgrade, remodel 2nd floor bath in kind. | $30,000 | |
| Mar 31, 2021 | Completed final sign-off Jan 2022 | 22 Temescal Tr | Eco Logic Construction & Design Inc. | interior remodel of existing bedroom and bath to include relocating plumbing fixtures and non load bearing walls. replace finishes and fixtures.Details
interior remodel of existing bedroom and bath to include relocating plumbing fixtures and non load bearing walls. replace finishes and fixtures. | $30,000 |
| Mar 9, 2021 | Expired or cancelled withdrawn Jan 2023 | 126 23rd Av | L H Gao Construction Inc. | add new unit in single family dwelling in an rh-2 zoning district. vertical and horizontal addition to building. rebuild rear deck.Details
add new unit in single family dwelling in an rh-2 zoning district. vertical and horizontal addition to building. rebuild rear deck. | $80,000 |
| Dec 9, 2020 | Never finaled issued Mar 2022, no final | 4232 Mission St | Ampex Engineering & Co | convert existing resdiential garage/basement space to accessory dwelling unit including kitchen, full bath, (1) bedroom, and living space.Details
convert existing resdiential garage/basement space to accessory dwelling unit including kitchen, full bath, (1) bedroom, and living space. | $200,000 |
| Nov 16, 2020 | Completed final sign-off Jun 2022 | 2531 33rd Av | new slab footing at area of construction. add 784sf of living space in (e) basement & under 2/f. living area to including new bedroo, bathroom, laundry & family room.Details
new slab footing at area of construction. add 784sf of living space in (e) basement & under 2/f. living area to including new bedroo, bathroom, laundry & family room. | $514,422 | |
| Jun 2, 2020 | Completed final sign-off Jan 2021 | 1113 Fillmore St | Speedy Construction Inc | interior tenant improvement to include new partitions. new finishes, lighting throughout also new break area to include millwork and plumbing.Details
interior tenant improvement to include new partitions. new finishes, lighting throughout also new break area to include millwork and plumbing. | $20,000 |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 300 Beale St | David Ruechelle | unit 408 - remodel kitchen, master bath and half bath. update electrical and plumbing accordingly, new cabinetry, plumbing and electrical fixturesDetails
unit 408 - remodel kitchen, master bath and half bath. update electrical and plumbing accordingly, new cabinetry, plumbing and electrical fixtures | $180,000 |
| May 16, 2019 | Completed final sign-off Aug 2021 | 1440 Montgomery St | Abide International Inc | unit #41 - interior remodel - kitchen cabinetry & finishes, master bath and closet remodel, new bath fixtures and finishes, new flooring throughout, ele & hvac upgrades as neededDetails
unit #41 - interior remodel - kitchen cabinetry & finishes, master bath and closet remodel, new bath fixtures and finishes, new flooring throughout, ele & hvac upgrades as needed | $450,000 |
| Mar 28, 2019 | Completed final sign-off Oct 2020 | 51 Pond St | Broc Built Construction | relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes.Details
relocate existing exterior door & add new landing to existing exterior stairs, add new bath to include plumbing fixtures & finishes. | $60,000 |
| Nov 2, 2018 | Completed final sign-off Apr 2019 | 2425 Market St | Ryzup Construction Incorporated | unit 12: kitchen update remodel: ele, plm. mechDetails
unit 12: kitchen update remodel: ele, plm. mech | $18,750 |
| Oct 30, 2018 | Never finaled issued Jun 2019, no final | 2820 Pacific Av | Talcon Builders | interior remodel of (e) bath and converting (e) closet into (n) bath in single-family residence. to include replacement of fixtures & finishes in (e) bath & adding (n) windows in (n) bath.Details
interior remodel of (e) bath and converting (e) closet into (n) bath in single-family residence. to include replacement of fixtures & finishes in (e) bath & adding (n) windows in (n) bath. | $65,000 |
| Jun 19, 2018 | Completed final sign-off Dec 2019 | 354 Greenwich St | Scott & Warner Builders Inc | interior remodel of condominium in 4 unit building to include replacement of fixtures in bathroom and kitchen, new finishes and millwork throughout. replacement of e windows and swinging glass door with newDetails
interior remodel of condominium in 4 unit building to include replacement of fixtures in bathroom and kitchen, new finishes and millwork throughout. replacement of e windows and swinging glass door with new | $60,000 |
| May 18, 2018 | Expired or cancelled cancelled Jan 2026 | 59 Santa Marina St | add int stair to lower lavel and covert e interior storage space to new master bedroom and bath.Details
add int stair to lower lavel and covert e interior storage space to new master bedroom and bath. | $75,000 | |
| Mar 30, 2018 | Completed final sign-off Aug 2018 | 1310 Minnesota St | Pivot Pools Construction And Design Inc | #23: remodel 2 bathrooms & kithen - replace cabinets, replace countertop, replace backsplash. plumbing, electrical, mechanical in kind. no changes, update with fixtures type state code. maher naDetails
#23: remodel 2 bathrooms & kithen - replace cabinets, replace countertop, replace backsplash. plumbing, electrical, mechanical in kind. no changes, update with fixtures type state code. maher na | $15,000 |
| Feb 28, 2018 | Completed final sign-off Sep 2018 | 2420 Gough St | Broc Built Construction | residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind.Details
residential remodel to include: kitchen remodel including new finishes, cabinetry & appliances. relocaion of (e) non-structural wall; demo of (e) shower & addition of new bathroom vanity; repair dry rot at (e) rear deck-less than 50%, replace in kind. | $60,000 |
| Feb 26, 2018 | Never finaled issued Mar 2018, no final | 130 Vienna St | Pivot Pools Construction And Design Inc | 1st floor: kitchen remodeling, replacing cabinets, countertops. opening on interior wall/window 4'x6'Details
1st floor: kitchen remodeling, replacing cabinets, countertops. opening on interior wall/window 4'x6' | $45,000 |
| Jan 19, 2018 | Expired or cancelled cancelled Jan 2026 | 2121 Webster St | condo remodel to include demo of walls and construction of new exits to the main hallway. maher na combine 2 unitsDetails
condo remodel to include demo of walls and construction of new exits to the main hallway. maher na combine 2 units | $25,000 | |
| Jul 28, 2017 | Expired or cancelled cancelled Jan 2026 | 2814 Lyon St | replace 3rd fl roof (approx 500 sf). (e) 4th fl fenestration & add tub to 4th fl bathroom, add 2 new skylights and replace one (e) skylight; install sprinklers in upper unit, remodel kitchen & bath, structural reinforcements throughout for possible future roof deckDetails
replace 3rd fl roof (approx 500 sf). (e) 4th fl fenestration & add tub to 4th fl bathroom, add 2 new skylights and replace one (e) skylight; install sprinklers in upper unit, remodel kitchen & bath, structural reinforcements throughout for possible future roof deck | $85,000 | |
| Jul 6, 2017 | Expired or cancelled cancelled Nov 2022 | 2814 Lyon St | add new flat roof deck at rear of building with glass/metal guardrail; (n) gas grill & storage. ** maher: n/a **Details
add new flat roof deck at rear of building with glass/metal guardrail; (n) gas grill & storage. ** maher: n/a ** | $25,000 | |
| May 3, 2017 | Never finaled issued Oct 2021, no final | 78 Carmelita St | Phollies Inc | remodel & addition to lowest fl. replace (e) brick foundation, extend ground fl to footprint of (e) upper fl, add plumbing for future kitchenette. relocate structural walls/columns. interior partitions & plumbing & replace interior finishes, cabinetry & light fixtureDetails
remodel & addition to lowest fl. replace (e) brick foundation, extend ground fl to footprint of (e) upper fl, add plumbing for future kitchenette. relocate structural walls/columns. interior partitions & plumbing & replace interior finishes, cabinetry & light fixture | $60,000 |
| Feb 15, 2017 | Expired or cancelled cancelled Jan 2026 | 1143 Fell St | install (n) skylight and lighting in living room & hall. flat roof, not visable from streetDetails
install (n) skylight and lighting in living room & hall. flat roof, not visable from street | $18,000 | |
| May 23, 2016 | Completed final sign-off Jan 2017 | 2274 16th Av | David Ruechelle | remodel extg kitchen, relocate doors to kitchen cabinetry, lighting, and electrical.Details
remodel extg kitchen, relocate doors to kitchen cabinetry, lighting, and electrical. | $45,000 |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 172 Cervantes Bl | Hadley General Contractors Inc | kitchen remodel, relocate plumbing, electerical cabinetry, remove wall to open up between kitchen and dining rm, relocate/replace door,windows at rear of house. n/a ordinance #155-13Details
kitchen remodel, relocate plumbing, electerical cabinetry, remove wall to open up between kitchen and dining rm, relocate/replace door,windows at rear of house. n/a ordinance #155-13 | $350,000 |
| Sep 3, 2015 | Completed final sign-off Feb 2016 | 742 Valencia St | C R C Builders Inc. | remodel of restaurant to include removal of banquet seating & chef's counter, add partitions to partially enclose and add privacy to (e) kitchen & prep. area. add (2) new bars & area for beer brewing. remodel entry door, (n) door to be wood to match (e) at 740 valencia streetDetails
remodel of restaurant to include removal of banquet seating & chef's counter, add partitions to partially enclose and add privacy to (e) kitchen & prep. area. add (2) new bars & area for beer brewing. remodel entry door, (n) door to be wood to match (e) at 740 valencia street | $35,000 |
| Sep 2, 2015 | Expired or cancelled cancelled Jan 2026 | 92 Virgil St | voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street.Details
voluntary addition of attic draft stopping to subdivide attic spaces between unit. total 8 units of 2 buildings in the lot. 4 units facing to s van ness ave and 4 units facing virgil street. | $1,000 | |
| Apr 1, 2015 | Completed final sign-off Feb 2016 | 2106 Jackson St | Cook Construction | unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'dDetails
unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'd | $150,000 |
| Apr 25, 2014 | Expired or cancelled cancelled Nov 2024 | 221 San Jose Av | add new 4/f: new kitchen, living,dining, powder rm, laundry 3 bedrms, 2 full baths & 2 exterior decks. merge 2 units on 2/f into 1 unit, merged unit will have: kitchen, 1 bathrm, 2 bedrms & living rm. seismic upgrade and rear addition w/(m) egress stairs for 4th floorDetails
add new 4/f: new kitchen, living,dining, powder rm, laundry 3 bedrms, 2 full baths & 2 exterior decks. merge 2 units on 2/f into 1 unit, merged unit will have: kitchen, 1 bathrm, 2 bedrms & living rm. seismic upgrade and rear addition w/(m) egress stairs for 4th floor | $1,500,000 | |
| Nov 8, 2013 | Completed final sign-off May 2014 | 1760 Pacific Av | Bashland Inc. Dba Bashland Builders | unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match newDetails
unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match new | $75,000 |
| Dec 1, 2011 | Expired or cancelled expired Mar 2015 | 2747 Green St | full interior renovation & addition of (e) single family home w/ 3 story plus basement & new roof deck.Details
full interior renovation & addition of (e) single family home w/ 3 story plus basement & new roof deck. | $250,000 | |
| Sep 2, 2011 | Completed final sign-off May 2013 | 3378 18th St | proposed remodel for 1st floor restaurant. change of use from noodle factory (classification b) to noodle restaurant (classification b). approved occupant load 48 persons. hood & duct fire suppression system under separate permitDetails
proposed remodel for 1st floor restaurant. change of use from noodle factory (classification b) to noodle restaurant (classification b). approved occupant load 48 persons. hood & duct fire suppression system under separate permit | $5,000 | |
| Jan 5, 2011 | Completed final sign-off Oct 2011 | 2106 Jackson St | Matarozzi/Pelsinger Builders Inc. | new roof deck with perimeter wind screen & stair enclosure serving unit# 8.Details
new roof deck with perimeter wind screen & stair enclosure serving unit# 8. | $100,000 |
| Jun 9, 2008 | Completed final sign-off Jul 2008 | 375 Alabama St | 4th floor, ste. 400: tenant improvement, new 8'0" high walls for office/conference room. ( no lightting and hvac modifications)Details
4th floor, ste. 400: tenant improvement, new 8'0" high walls for office/conference room. ( no lightting and hvac modifications) | $23,500 |