Felix A. Rodriguez
- Listed as
- architect
- Firm
- Garica/Wagner Assoc.
- On San Francisco permits
- Dec 2004 to May 2007
11 permits since 2000 (architect on 11 permits): 6 completed, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2007 | Completed final sign-off Jun 2007 | 185 Berry St | Dfi Construction Company | correct ada compliance issues, revision to pa# 2006082506300-re stripe stall and extend ramp curbDetails
correct ada compliance issues, revision to pa# 2006082506300-re stripe stall and extend ramp curb | $5,000 |
| Mar 29, 2007 | Completed final sign-off Nov 2008 | 185 Berry St | Merrcon Inc. | work on 2nd to 5th/fl.interior corridor finish upgrade:new carpet, suspended ceiling&gypsum board ceiling,light fixtures,fire doors @ elevator lobby 2. elec&mech work will be design-build. fire alarm system shall be the responsibility of life&safety contracator.fire alarm sprinkler on seperate appl.Details
work on 2nd to 5th/fl.interior corridor finish upgrade:new carpet, suspended ceiling&gypsum board ceiling,light fixtures,fire doors @ elevator lobby 2. elec&mech work will be design-build. fire alarm system shall be the responsibility of life&safety contracator.fire alarm sprinkler on seperate appl. | $594,800 |
| Aug 25, 2006 | Completed final sign-off Jun 2007 | 185 Berry St | the general scope of this project is to correct various ada access compliance issues that have been identified within the code defined 'path of travel' to the edd suite #200 space.Details
the general scope of this project is to correct various ada access compliance issues that have been identified within the code defined 'path of travel' to the edd suite #200 space. | $125,000 | |
| Aug 10, 2006 | Completed final sign-off May 2007 | 185 Berry St | oti-1, 2nd floor, el, sp, ls.Details
oti-1, 2nd floor, el, sp, ls. | $275,000 | |
| May 11, 2006 | Expired or cancelled expired Apr 2009 | 845 Market St | cti-1 sterling works, 3rd floor #305 el, me, ls, spDetails
cti-1 sterling works, 3rd floor #305 el, me, ls, sp | $90,000 | |
| May 11, 2006 | Expired or cancelled expired Apr 2009 | 845 Market St | sterling works, space# 305. cti-2, 3rd floor, el, me.Details
sterling works, space# 305. cti-2, 3rd floor, el, me. | $75,000 | |
| Nov 18, 2005 | Completed final sign-off Mar 2007 | 44 Montgomery St | City Building Inc. | 39th floor - enlarge (e) computer room & enhance both mechanical & electrical systems infrastructure to support current & future operational requirements of the computer room.Details
39th floor - enlarge (e) computer room & enhance both mechanical & electrical systems infrastructure to support current & future operational requirements of the computer room. | $1,500,000 |
| Oct 13, 2005 | Expired or cancelled expired May 2006 | 85 05th St | replace rusted metal,fascia w/like kind,repaint & resign lettering for repair of (e)marques.same for same.Details
replace rusted metal,fascia w/like kind,repaint & resign lettering for repair of (e)marques.same for same. | $5,500 | |
| Apr 5, 2005 | Expired or cancelled expired Apr 2008 | 185 Berry St | Gci, Inc | oti-1,6th/fl-el,me.Details
oti-1,6th/fl-el,me. | $420,000 |
| Feb 7, 2005 | Completed final sign-off Mar 2005 | 85 05th St | move dbl doors located on 5th st elevation.Details
move dbl doors located on 5th st elevation. | $2,000 | |
| Dec 16, 2004 | Never finaled issued Jul 2005, no final | 44 Montgomery St | provide new poured in places concrete pad on 2nd level roof top for new emergency generator & upgradDetails
provide new poured in places concrete pad on 2nd level roof top for new emergency generator & upgrad | $285,000 |