- Apr 2021 to Jul 2026
77 permits since 2000 (contractor on 77 permits, authorized agent-others on 1 permit): 47 completed, 21 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 3637 Washington St | Mcguinness Mccann Group | additonal grouting required due to soil conditions found on site while working under 202501309411Details
additonal grouting required due to soil conditions found on site while working under 202501309411 | $16,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3647 Washington St | Mcguinness Mccann Group | additional grouting required due to soil conditions found on site while working under 202501309411Details
additional grouting required due to soil conditions found on site while working under 202501309411 | $16,000 |
| May 5, 2026 | In progress issued May 2026 | 1327 20th Av | Mcguinness Mccann Group | revision to previously approved permit 2026-0317-7706 to include widening stairs to match original configuration-add new footings under side walls.Details
revision to previously approved permit 2026-0317-7706 to include widening stairs to match original configuration-add new footings under side walls. | $4,000 |
| May 1, 2026 | In progress issued Jul 2026 | 3647 Washington St | Mcguinness Mccann Group | strengthening of a short existing site retaining wall that runs perpendicular to the east property line. near the entrance to the residence.Details
strengthening of a short existing site retaining wall that runs perpendicular to the east property line. near the entrance to the residence. | $5,000 |
| Mar 19, 2026 | In progress issued Mar 2026 | 1327 20th Av | Mcguinness Mccann Group | work at rear cottage only to include: lower floor framing to achieve 9'-0" ceiling ht. replace entry door & windows. replace entry steps & railing.Details
work at rear cottage only to include: lower floor framing to achieve 9'-0" ceiling ht. replace entry door & windows. replace entry steps & railing. | $10,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 1327 20th Av | Mcguinness Mccann Group | replace (e) front stairs, sidewalls design change to match previous configurationDetails
replace (e) front stairs, sidewalls design change to match previous configuration | $25,000 |
| Feb 19, 2026 | In progress issued Mar 2026 | 2030 Fell St | Mcguinness Mccann Group | 4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom.Details
4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom. | $30,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 2565 Sacramento St | Mcguinness Mccann Group | replace back yard fence in kind on east side.Details
replace back yard fence in kind on east side. | $10,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 3409 Jackson St | Mcguinness Mccann Group | renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard.Details
renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard. | $150,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 2030 Fell St | Mcguinness Mccann Group | unit #5: replace all finishes and fixtures in-kindDetails
unit #5: replace all finishes and fixtures in-kind | $30,000 |
| Aug 22, 2025 | In progress issued Aug 2025 | 76 Sussex St | Mcguinness Mccann Group | replace 2 sections of corner trim on the front facade of the building in kind due to rot.Details
replace 2 sections of corner trim on the front facade of the building in kind due to rot. | $1,500 |
| Jul 28, 2025 | In progress issued Jul 2025 | 401 Euclid Av | Mcguinness Mccann Group | dry-rot repairs on siding & trims(no structural work). not visible from the street.Details
dry-rot repairs on siding & trims(no structural work). not visible from the street. | $40,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 3281 Jackson St | Mcguinness Mccann Group | rotted joists (approx 5) to be replaced in garage.Details
rotted joists (approx 5) to be replaced in garage. | $15,000 |
| May 13, 2025 | In progress issued May 2025 | 2948 Steiner St | Mcguinness Mccann Group | replacement of rotted siding in various areas on rear + side exterior walls. (not visible from the street) - replacement of roof on separate permit. not visible from streetDetails
replacement of rotted siding in various areas on rear + side exterior walls. (not visible from the street) - replacement of roof on separate permit. not visible from street | $80,000 |
| Apr 24, 2025 | Completed final sign-off Sep 2025 | 1356 Vallejo St | Mcguinness Mccann Group | replace areas of rotted siding and trim pieces on front, back and lightwell of building. found by painters.Details
replace areas of rotted siding and trim pieces on front, back and lightwell of building. found by painters. | $50,000 |
| Apr 7, 2025 | Completed final sign-off Mar 2026 | 2077 Broadway | Mcguinness Mccann Group | remodel (e) kitchen change location of door to the basement. widen opening from entry to living roomcDetails
remodel (e) kitchen change location of door to the basement. widen opening from entry to living roomc | $78,000 |
| Mar 26, 2025 | In progress issued Aug 2025 | 3645 Washington St | Mcguinness Mccann Group | replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space.Details
replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space. | $213,462 |
| Jan 28, 2025 | Completed final sign-off Dec 2025 | 135 Wool St | Gadi Construction Inc, Mcguinness Mccann Group | replace 7 windows in kind, all over the house not including the garage (aluminum a250). two windows at the front - same operation.Details
replace 7 windows in kind, all over the house not including the garage (aluminum a250). two windows at the front - same operation. | $12,000 |
| Jan 15, 2025 | Completed final sign-off Feb 2025 | 771 41st Av | Mcguinness Mccann Group | replace the railings and repair some dryrot. less than 50% repair.Details
replace the railings and repair some dryrot. less than 50% repair. | $15,000 |
| Jan 14, 2025 | In progress issued Jan 2025 | 1438 Filbert St | Mcguinness Mccann Group | replair leaking windows on the front facade. half the 1st floor, all of the second floor and all of the 3rd floor only. install missing flashing & reinstall the windows, trim, and siding.Details
replair leaking windows on the front facade. half the 1st floor, all of the second floor and all of the 3rd floor only. install missing flashing & reinstall the windows, trim, and siding. | $20,000 |
| Jan 14, 2025 | Completed final sign-off Jan 2025 | 33 Juanita Wy | Mcguinness Mccann Group | replace 3 front windows with new wood windows that match current sytle/architecture.Details
replace 3 front windows with new wood windows that match current sytle/architecture. | $12,000 |
| Dec 16, 2024 | Completed final sign-off Jan 2025 | 3337 Clay St | Mcguinness Mccann Group | adminstrative review permit for deletion of jomy ladder and footing that was previously not approved but was left on the plans. pa#: 202310118446Details
adminstrative review permit for deletion of jomy ladder and footing that was previously not approved but was left on the plans. pa#: 202310118446 | |
| Dec 13, 2024 | Completed final sign-off May 2025 | 1977 Bush St | Mcguinness Mccann Group | rev 202310309767- replace (e) 2 windows on west property line with (n) fire rated windows.Details
rev 202310309767- replace (e) 2 windows on west property line with (n) fire rated windows. | $3,800 |
| Nov 27, 2024 | Completed final sign-off Feb 2025 | 771 41st Av | Mcguinness Mccann Group | replace less than 10x10' of fire damaged siding. no structural, not changing materials. not visible from the street.Details
replace less than 10x10' of fire damaged siding. no structural, not changing materials. not visible from the street. | $15,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 2030 Fell St | Mcguinness Mccann Group | unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists.Details
unit #2: relocate walls on 2/f in apt# 2. add garage ceiling beams and joists. | $40,000 |
| Oct 9, 2024 | In progress issued Oct 2024 | 2030 Fell St | Mcguinness Mccann Group | unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removalDetails
unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removal | $20,000 |
| Aug 16, 2024 | Completed final sign-off Apr 2025 | 3409 Jackson St | Mcguinness Mccann Group | revision to bpa: 2024.0412.9858 during install of windows substantial dry rot has been found on the substrate boards and in some areas a little of the framing also has rot, replace any framing in kind (approx. 100 sq.ft.) and install new plywood...Details
revision to bpa: 2024.0412.9858 during install of windows substantial dry rot has been found on the substrate boards and in some areas a little of the framing also has rot, replace any framing in kind (approx. 100 sq.ft.) and install new plywood... | $35,000 |
| Jul 2, 2024 | In progress issued Jul 2024 | 120 Moffitt St | Mcguinness Mccann Group | replace a few pieces of framing due to rot, including the header above the garage door. all new stucco and plywood due to rot. approx 10sf for framing and 400sf of stucco.Details
replace a few pieces of framing due to rot, including the header above the garage door. all new stucco and plywood due to rot. approx 10sf for framing and 400sf of stucco. | $30,000 |
| Jul 2, 2024 | In progress issued Jul 2024 | 406 Funston Av | Mcguinness Mccann Group | remodel a kitchen, 1 bathroom and 1 half bath. finishes only no structural. plumbing and electrical by owner's subs.Details
remodel a kitchen, 1 bathroom and 1 half bath. finishes only no structural. plumbing and electrical by owner's subs. | $50,000 |
| May 17, 2024 | Completed final sign-off Sep 2024 | 75 Roosevelt Wy | Mcguinness Mccann Group | to obtain final inspection for work approved under pa#: 202107023669. all work is complete.Details
to obtain final inspection for work approved under pa#: 202107023669. all work is complete. | |
| May 8, 2024 | Completed final sign-off Nov 2024 | 85 Roosevelt Wy | Mcguinness Mccann Group | unit #1: remodel of (e) bathroom + kitchen no structural work. new flooring throughout. plumbing + electrical by others.Details
unit #1: remodel of (e) bathroom + kitchen no structural work. new flooring throughout. plumbing + electrical by others. | $65,000 |
| Apr 29, 2024 | Completed final sign-off Aug 2024 | 3409 Jackson St | Mcguinness Mccann Group | add new curb mounted skylight at existing stairDetails
add new curb mounted skylight at existing stair | $7,500 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 20 Cotter St | Mcguinness Mccann Group, Dunros Construction | remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street)Details
remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street) | $30,000 |
| Apr 12, 2024 | Completed final sign-off Apr 2025 | 3409 Jackson St | Mcguinness Mccann Group | replace front side and repair windows in kind. same on 2nd and 3rd (non to be replaced on the ground floor) patching stucco will be necessary around the windows. tot of 25 u=.30maxDetails
replace front side and repair windows in kind. same on 2nd and 3rd (non to be replaced on the ground floor) patching stucco will be necessary around the windows. tot of 25 u=.30max | $45,000 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 60 Badger St | Mcguinness Mccann Group | replace front and rear windows in kind. relace rotted trim work around the windows where necessary. u=.30max total of 11Details
replace front and rear windows in kind. relace rotted trim work around the windows where necessary. u=.30max total of 11 | $30,000 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 70 Hartford St | Mcguinness Mccann Group | replace all finishes and fixtures in (2) bathrooms. no structural work. no plumbing moving. no layout changes.Details
replace all finishes and fixtures in (2) bathrooms. no structural work. no plumbing moving. no layout changes. | $30,000 |
| Jan 18, 2024 | Completed final sign-off Oct 2024 | 2168 Fell St | Mcguinness Mccann Group | remove and replace in kind front rotted siding and stucco and some framing around the windows. replace windows and deck doors in kind. front facade work only.Details
remove and replace in kind front rotted siding and stucco and some framing around the windows. replace windows and deck doors in kind. front facade work only. | $40,000 |
| Jan 18, 2024 | Completed final sign-off Nov 2024 | 36 Darrell Pl | Mcguinness Mccann Group | rear of bldg not visible to the street. replace less than 10% rotted siding in kind, replace trim pieces around windows in kind, add flashing.Details
rear of bldg not visible to the street. replace less than 10% rotted siding in kind, replace trim pieces around windows in kind, add flashing. | $10,000 |
| Oct 30, 2023 | Completed final sign-off May 2025 | 1977 Bush St | Mcguinness Mccann Group | remove (e) rear stairs, walls and windows. replace in kind. repair dry rot. no work to front facadeDetails
remove (e) rear stairs, walls and windows. replace in kind. repair dry rot. no work to front facade | $25,000 |
| Oct 11, 2023 | Completed final sign-off Jan 2025 | 3337 Clay St | Mcguinness Mccann Group | 1) remove and replace 4 balconies 2) remove (e) front fire escape and reaplce at east side 3) repair dry rotted material 4) repair and replace affected stucco in kind replacementDetails
1) remove and replace 4 balconies 2) remove (e) front fire escape and reaplce at east side 3) repair dry rotted material 4) repair and replace affected stucco in kind replacement | $20,000 |
| Sep 14, 2023 | Completed final sign-off Nov 2024 | 38 Elsie St | Mcguinness Mccann Group | revision of permit 202306260841. construction to add 4 x 10's at grid line a and b at 2/f, 1 & 3 @ 2/fDetails
revision of permit 202306260841. construction to add 4 x 10's at grid line a and b at 2/f, 1 & 3 @ 2/f | |
| Sep 13, 2023 | Completed final sign-off Dec 2024 | 34 Darrell Pl | Mcguinness Mccann Group | replace rotted front siding discovered by painters. replace in kind. approx. one hundred square ft.Details
replace rotted front siding discovered by painters. replace in kind. approx. one hundred square ft. | $18,000 |
| Sep 13, 2023 | Completed final sign-off Mar 2024 | 2030 Fell St | Mcguinness Mccann Group | replacement of cracked and rotted siding in east side lightwell. replace in kind. approx one hundred square feet.Details
replacement of cracked and rotted siding in east side lightwell. replace in kind. approx one hundred square feet. | $18,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 2760 Bush St | Mcguinness Mccann Group | bathroom remodel- new shower/ tube tile new shower glass- plumbing and electrical by others. no removal of wallsDetails
bathroom remodel- new shower/ tube tile new shower glass- plumbing and electrical by others. no removal of walls | $50,000 |
| Jul 7, 2023 | Completed final sign-off Aug 2023 | 114 Moffitt St | Mcguinness Mccann Group | remove 2 leaking front windows and cracked stucco around the windows. replace in kind (wood).Details
remove 2 leaking front windows and cracked stucco around the windows. replace in kind (wood). | $5,000 |
| Jun 26, 2023 | Completed final sign-off Nov 2024 | 38 Elsie St | Mcguinness Mccann Group | rev to pa 201712217106-s1: framing revision per structural engineer to accomodate field conditions. at west wallDetails
rev to pa 201712217106-s1: framing revision per structural engineer to accomodate field conditions. at west wall | |
| Jun 9, 2023 | Never finaled issued Jun 2023, no final | 40 Elsie St | Mcguinness Mccann Group | replace siding on front facade due to rot no structural work. ~200 sqftDetails
replace siding on front facade due to rot no structural work. ~200 sqft | $8,500 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 2565 Sacramento St | Mcguinness Mccann Group | replace some handrail/handrail post on rear deck in kind, 50% or less, due to dryrot, replace section of front siding/side alley door, 10 foot section of fence on front garden. fence less than or equal 6 ft tall.Details
replace some handrail/handrail post on rear deck in kind, 50% or less, due to dryrot, replace section of front siding/side alley door, 10 foot section of fence on front garden. fence less than or equal 6 ft tall. | $7,500 |
| May 25, 2023 | Completed final sign-off Mar 2024 | 1586 24th Av | Mcguinness Mccann Group | install (2) matching windows in front facade. replace in kind, repair rotted and leaking edges around the windows. patch in stucco to match existing.Details
install (2) matching windows in front facade. replace in kind, repair rotted and leaking edges around the windows. patch in stucco to match existing. | $15,000 |
| May 23, 2023 | Completed final sign-off Sep 2023 | 411 Teresita Bl | Mcguinness Mccann Group | structural revision to 202208059991. no arch scope. clarifications of framing, connections, repair cracked post, add hucq at post to beam connections, add new post to existing post at crawl spaceDetails
structural revision to 202208059991. no arch scope. clarifications of framing, connections, repair cracked post, add hucq at post to beam connections, add new post to existing post at crawl space | $5,000 |
| Apr 28, 2023 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | Mcguinness Mccann Group | rev to pa# 202210144350, 202211216913 & 202304075327, to eliminate hvac from scope. extg mech equip to remian. no structural work. no other architechtural work. previous plans showed heat pump on roof. revised plans does not.Details
rev to pa# 202210144350, 202211216913 & 202304075327, to eliminate hvac from scope. extg mech equip to remian. no structural work. no other architechtural work. previous plans showed heat pump on roof. revised plans does not. | |
| Apr 7, 2023 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | Mcguinness Mccann Group | revision to #2022-1014-4350 & 2022-1121-6913 to widen rear facing master window - required structural (not street facing)Details
revision to #2022-1014-4350 & 2022-1121-6913 to widen rear facing master window - required structural (not street facing) | $10,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 924 Grove St | Mcguinness Mccann Group | exploratory removal of various pieces on the facade to find cause of leaks on front facades and sides. repair in kind. save the pieces for reattaching. no plans, no changes. historical pictures show the uilding facade was already altered previously. approx 4% of facade of building needs piecesDetails
exploratory removal of various pieces on the facade to find cause of leaks on front facades and sides. repair in kind. save the pieces for reattaching. no plans, no changes. historical pictures show the uilding facade was already altered previously. approx 4% of facade of building needs pieces | $2,000 |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 5725 Diamond Heights Bl | Mcguinness Mccann Group | replace (2) rear sliding doors and one window plus siding due to rot and leaks. no structural. replace in kind. not visible from the street. only top level has siding. u is 0.30 maxDetails
replace (2) rear sliding doors and one window plus siding due to rot and leaks. no structural. replace in kind. not visible from the street. only top level has siding. u is 0.30 max | $10,000 |
| Mar 29, 2023 | Completed final sign-off Jan 2024 | 403 Filbert St | Mcguinness Mccann Group | change out all finishes in unit 403, 1 bathroom and 1 kitchen. no change in layouts, new floor coverings, and tiles. plumbing and electrical by others. new cabinets, sinks, toilet, shower etc.Details
change out all finishes in unit 403, 1 bathroom and 1 kitchen. no change in layouts, new floor coverings, and tiles. plumbing and electrical by others. new cabinets, sinks, toilet, shower etc. | $28,000 |
| Mar 2, 2023 | In progress issued Jan 2024 | 120 Moffitt St | Mcguinness Mccann Group, Daylight Construction | replace rotted siding and remove stucco in front facade to repair any substrate rot and replace (4) windows. front facade work only.Details
replace rotted siding and remove stucco in front facade to repair any substrate rot and replace (4) windows. front facade work only. | $30,000 |
| Nov 22, 2022 | Completed final sign-off Oct 2024 | 1438 Filbert St | Mcguinness Mccann Group | amendment to permit # 202210315491:aditional work: minor dryrot repairs on wood framing around windows. install new 1/2 plywood and densglass.Details
amendment to permit # 202210315491:aditional work: minor dryrot repairs on wood framing around windows. install new 1/2 plywood and densglass. | $10,000 |
| Nov 21, 2022 | Expired or cancelled withdrawn Nov 2023 | 1467 Kearny St | Mcguinness Mccann Group | extend portion of interior basement retaining wall height along kearny, modify kearny street structure. also extend portion of basement retaining wall height along filbert st. remodel entry lobby and remove stairs to basement (per prj).Details
extend portion of interior basement retaining wall height along kearny, modify kearny street structure. also extend portion of basement retaining wall height along filbert st. remodel entry lobby and remove stairs to basement (per prj). | $20,000 |
| Nov 21, 2022 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | Mcguinness Mccann Group | revision to 202210144350. structural framing changes to reflect + address field conditions. roof ridge kicked down to center bearing wall.Details
revision to 202210144350. structural framing changes to reflect + address field conditions. roof ridge kicked down to center bearing wall. | |
| Nov 10, 2022 | Completed final sign-off Jul 2023 | 2030 Fell St | Mcguinness Mccann Group | unit 6: relocate walls of 4/f, strengthening ceiling joists in partial garage ceilingDetails
unit 6: relocate walls of 4/f, strengthening ceiling joists in partial garage ceiling | $5,000 |
| Oct 31, 2022 | Completed final sign-off Oct 2024 | 1438 Filbert St | Mcguinness Mccann Group | replace rotted siding on the front facade, westside and some on the east side replace rotted trims around the windows on front, rear and east wall replace all windows on the front, of the building and some other rotted windows.Details
replace rotted siding on the front facade, westside and some on the east side replace rotted trims around the windows on front, rear and east wall replace all windows on the front, of the building and some other rotted windows. | $70,000 |
| Oct 27, 2022 | Completed final sign-off Apr 2023 | 2423 Green St | Mcguinness Mccann Group | add concrete foundation to support kitchen floor joists.Details
add concrete foundation to support kitchen floor joists. | $4,000 |
| Oct 25, 2022 | Completed final sign-off Jul 2023 | 2030 Fell St | Mcguinness Mccann Group | unit #6: exploratory demo only in unit #6 to facilitate the engineer drawings if necessary for future permits. top floor unit. patch ceiling after.Details
unit #6: exploratory demo only in unit #6 to facilitate the engineer drawings if necessary for future permits. top floor unit. patch ceiling after. | $3,000 |
| Oct 14, 2022 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | Mcguinness Mccann Group | replace roofing at sloped and low slope roofs, reconfigure drains, insulate roof install new heat pump sytem at roof w/access hatch (will serve top story only) replace kitchen skylight(s) at (e) opening, add 2 sklights at (e) m.bath & powder, replace 2 rear exterior doors at top storyDetails
replace roofing at sloped and low slope roofs, reconfigure drains, insulate roof install new heat pump sytem at roof w/access hatch (will serve top story only) replace kitchen skylight(s) at (e) opening, add 2 sklights at (e) m.bath & powder, replace 2 rear exterior doors at top story | $10,000 |
| Sep 23, 2022 | Never finaled issued Sep 2022, no final | 244 30th St | Mcguinness Mccann Group | removal of cracked sttucco on front facade and replace in kind. replace 12 windows on the front in kind with wood windows or wood aluminum clad single hung and 2 rear windows.Details
removal of cracked sttucco on front facade and replace in kind. replace 12 windows on the front in kind with wood windows or wood aluminum clad single hung and 2 rear windows. | $28,000 |
| Sep 23, 2022 | Completed final sign-off Jan 2023 | 941 Broderick St | Mcguinness Mccann Group | dry rot repsir on rear wall of building. approx 100 sfDetails
dry rot repsir on rear wall of building. approx 100 sf | $8,000 |
| Aug 12, 2022 | Completed final sign-off Jan 2023 | 3733 17th St | Mcguinness Mccann Group | remove stucco and leave original siding at rear of building. install 8 new windows rear of buildingDetails
remove stucco and leave original siding at rear of building. install 8 new windows rear of building | $25,000 |
| Aug 12, 2022 | Completed final sign-off Apr 2023 | 2423 Green St | Mcguinness Mccann Group | one kitchen remodel, new cabinets, countertops, appliances. electrical and plumbing by others.Details
one kitchen remodel, new cabinets, countertops, appliances. electrical and plumbing by others. | $25,000 |
| Aug 12, 2022 | Completed final sign-off Oct 2022 | 192 Downey St | Mcguinness Mccann Group | replace rear deck boards in kind (on 2nd flr), with azek composite boards. no structural. work on 2nd floorDetails
replace rear deck boards in kind (on 2nd flr), with azek composite boards. no structural. work on 2nd floor | $8,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 411 Teresita Bl | Mcguinness Mccann Group | new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage,Details
new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage, | $40,000 |
| Aug 3, 2022 | Completed final sign-off Sep 2023 | 1931 Lyon St | Mcguinness Mccann Group | remodel 1 fullb athroom & 1/2 bathroom at 2/f. cover over glass block at interior side of msater shower. no structural & no exterior facade changes.Details
remodel 1 fullb athroom & 1/2 bathroom at 2/f. cover over glass block at interior side of msater shower. no structural & no exterior facade changes. | $30,000 |
| Jun 22, 2022 | Completed final sign-off Aug 2022 | 2760 Bush St | Mcguinness Mccann Group | front stairs are leaking. remove the slab treads and tile rises. replace the waterproofing. reinstall slabs and new matching tile risers.Details
front stairs are leaking. remove the slab treads and tile rises. replace the waterproofing. reinstall slabs and new matching tile risers. | $8,000 |
| May 2, 2022 | Expired or cancelled withdrawn Mar 2025 | 226 Rutledge St | Mcguinness Mccann Group, S Mc Cann Construction Inc | replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundryDetails
replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundry | $300,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2022 | 5725 Diamond Heights Bl | Mcguinness Mccann Group | replace rotten thi siding on south side of bldg. replace with lap siding with half inch structural ply underneath. replace rotted windows in south wall in-kind with new wood windows with aluminum cladding. not street visible.Details
replace rotten thi siding on south side of bldg. replace with lap siding with half inch structural ply underneath. replace rotted windows in south wall in-kind with new wood windows with aluminum cladding. not street visible. | $18,000 |
| Mar 30, 2022 | Completed final sign-off Aug 2022 | 834 Castro St | Mcguinness Mccann Group | rev to pa202111051885 & 202106021504: structural chagnes to due to field changes for balconies.Details
rev to pa202111051885 & 202106021504: structural chagnes to due to field changes for balconies. | |
| Mar 18, 2022 | Completed final sign-off Feb 2023 | 161 06th Av | Mcguinness Mccann Group | (2) bath remodel on 3/f, electrical, plumbing scope. not visible from prow, no structural.Details
(2) bath remodel on 3/f, electrical, plumbing scope. not visible from prow, no structural. | $20,000 |
| Apr 15, 2021 | Completed final sign-off Nov 2022 | 30 Loma Vista Tr | Untitled Labs Inc Dba Made Renovation, Mcguinness Mccann Group | 2 bathroom remodels in-kind. bath 1: 54 sqft, new tub/shower, vanity, toilet. bath 2: 55 sqft, new curbed shower, vanity, toilet.Details
2 bathroom remodels in-kind. bath 1: 54 sqft, new tub/shower, vanity, toilet. bath 2: 55 sqft, new curbed shower, vanity, toilet. | $29,000 |