Untitled Labs Inc Dba Made Renovation
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Jan 2023
- Last 24 months
- 0 permits filed
245 permits since 2000: 215 completed, 27 never finaled, 3 expired or cancelled.
Of the 27 never-finaled permits, 8 are 3 to 5 years old, 19 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 245.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2023 | Completed final sign-off Mar 2023 | 2601 Chestnut St | to obtain final inspection for work approved under pa # 202104148517. all work is complete.Details
to obtain final inspection for work approved under pa # 202104148517. all work is complete. | |
| Jul 19, 2022 | Completed final sign-off Jun 2023 | 625 03rd Av | revision to permit 202110251082. label closet at the top of the stairs as a dedicated utility/mechanical closet per request of electrical inspector.Details
revision to permit 202110251082. label closet at the top of the stairs as a dedicated utility/mechanical closet per request of electrical inspector. | |
| Apr 4, 2022 | Completed final sign-off Sep 2022 | 824 Teresita Bl | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $14,500 |
| Apr 4, 2022 | Completed final sign-off Jan 2023 | 207 Juanita Wy | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Mar 28, 2022 | Completed final sign-off Aug 2022 | 188 Panorama Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $14,500 |
| Mar 21, 2022 | Completed final sign-off Mar 2023 | 35 Digby St | one 45 sqft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replace existing with (n) tub/ shower, toilet, and vanity. all (n) fixtures and finishes.Details
one 45 sqft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replace existing with (n) tub/ shower, toilet, and vanity. all (n) fixtures and finishes. | $14,500 |
| Mar 21, 2022 | Completed final sign-off Jan 2023 | 71 Sanchez St | one 34 sqft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replace existing with (n) curbed shower, vanity, and toilet. all (n) fixtures and finishes.Details
one 34 sqft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replace existing with (n) curbed shower, vanity, and toilet. all (n) fixtures and finishes. | $14,500 |
| Mar 15, 2022 | Completed final sign-off Jan 2023 | 4500 California St | one 80 sq ft bath remodel on 1st fl . no structural. no changes to walls or openings, replace (e) with new curbed shower dbl vanity and toilet. all new fixtures and finishes.Details
one 80 sq ft bath remodel on 1st fl . no structural. no changes to walls or openings, replace (e) with new curbed shower dbl vanity and toilet. all new fixtures and finishes. | $14,500 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 850 Powell St | one 100 sqft master bathroom remodel on 6th floor- replace existing with (n) toilet, vanity, all (n) fixtures and finishes curbed shower and soaking tub no structural. no changes to walls or openings.Details
one 100 sqft master bathroom remodel on 6th floor- replace existing with (n) toilet, vanity, all (n) fixtures and finishes curbed shower and soaking tub no structural. no changes to walls or openings. | $15,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 421 Diamond St | 2 bathroom remodels on 1st and 2nd floors, no structural bath (a) 19 sqft powder room on 1st floor (n) toilet vanity: bath (b) 77 sqft bathroom on 2nd floor replace existing with (n) curbed shower, soaking tub, vanity, toilet. all (n) fixtures and finishes.Details
2 bathroom remodels on 1st and 2nd floors, no structural bath (a) 19 sqft powder room on 1st floor (n) toilet vanity: bath (b) 77 sqft bathroom on 2nd floor replace existing with (n) curbed shower, soaking tub, vanity, toilet. all (n) fixtures and finishes. | $30,000 |
| Mar 15, 2022 | Completed final sign-off Nov 2022 | 609 Castro St | one 42 sq ft bathroom remodel on 3rd floor. no structural. replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
one 42 sq ft bathroom remodel on 3rd floor. no structural. replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $14,500 |
| Mar 15, 2022 | Completed final sign-off Aug 2022 | 672 Page St | 3/f: expand existing 56.8 sq.ft. bathroom into adjacent closets. add new partition wall to create 2 bathrooms totaling 98 sq.ft. bath a: 40 sf with all new curbed shower, toilet, and vanity. bath b: 58 sf replace existing with new tub/shower, toilet, and vanity. no structural work.Details
3/f: expand existing 56.8 sq.ft. bathroom into adjacent closets. add new partition wall to create 2 bathrooms totaling 98 sq.ft. bath a: 40 sf with all new curbed shower, toilet, and vanity. bath b: 58 sf replace existing with new tub/shower, toilet, and vanity. no structural work. | $30,000 |
| Mar 15, 2022 | Completed final sign-off Nov 2022 | 1239 19th Av | one 43 sq. ft. master bath remodel on 3/f. no structural. expand bathroom into adjacent bedroom closet. replace existing with new curbed shower, toilet and vanity, new fixtures and finishes. all lighting to comply with cec 150.0(k)Details
one 43 sq. ft. master bath remodel on 3/f. no structural. expand bathroom into adjacent bedroom closet. replace existing with new curbed shower, toilet and vanity, new fixtures and finishes. all lighting to comply with cec 150.0(k) | $15,000 |
| Mar 15, 2022 | Completed final sign-off Jan 2023 | 316 12th Av | one 75 sq ft bath remodel on the 3rd fl. no structural. replace e with new curbed shower, toilet, and vanity. all new fixtures and finishes. washe dryer closet in bath. no wall or layout changes.Details
one 75 sq ft bath remodel on the 3rd fl. no structural. replace e with new curbed shower, toilet, and vanity. all new fixtures and finishes. washe dryer closet in bath. no wall or layout changes. | $16,500 |
| Mar 4, 2022 | Completed final sign-off Jan 2023 | 1370 Hayes St | one 66 sqft bathroom remodel in-kind 1st floor. no structural, no changes to walls or openings. replace existing with (n) tub/shower, toilet & vanity. all (n) fixtures & finishes.Details
one 66 sqft bathroom remodel in-kind 1st floor. no structural, no changes to walls or openings. replace existing with (n) tub/shower, toilet & vanity. all (n) fixtures & finishes. | $14,500 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 5528 Fulton St | one 37sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with new curbed shower, toilet, vanity. all new fixtures and finishes.Details
one 37sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with new curbed shower, toilet, vanity. all new fixtures and finishes. | $14,500 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 850 Powell St | unit #603. one 28 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with (n) toilet & vanity. all (n) fixtures & finishes.Details
unit #603. one 28 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. replace existing with (n) toilet & vanity. all (n) fixtures & finishes. | $14,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2022 | 512 Jersey St | one 58 sqft bathroom remodel in-kind 2nd floor. no structural. replace all existing with (n) curbed shower, toilet & vanity. all (n) fixtures + finishes.Details
one 58 sqft bathroom remodel in-kind 2nd floor. no structural. replace all existing with (n) curbed shower, toilet & vanity. all (n) fixtures + finishes. | $14,500 |
| Mar 4, 2022 | Completed final sign-off Nov 2022 | 728 Alabama St | apt 105, 1/f: one 40sf bathroom remodel. no structural, no changes to walls or openings. replace existing with new curbed shower, toilet, vanity. all new fixtures and finishes.Details
apt 105, 1/f: one 40sf bathroom remodel. no structural, no changes to walls or openings. replace existing with new curbed shower, toilet, vanity. all new fixtures and finishes. | $14,500 |
| Mar 3, 2022 | Completed final sign-off Nov 2022 | 531 Kansas St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $14,500 |
| Mar 3, 2022 | Completed final sign-off Dec 2022 | 3166 Baker St | in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s). | $18,000 |
| Feb 18, 2022 | Completed final sign-off Jan 2023 | 1974 Filbert St | 2/f: one 48 sq. ft. bathroom remodel. no structural. square off bathroom wall to create a larger bathroom. replace (e) with new tub/shower, toilet, and vanity. all lights to comply with ces 150.0 (k)Details
2/f: one 48 sq. ft. bathroom remodel. no structural. square off bathroom wall to create a larger bathroom. replace (e) with new tub/shower, toilet, and vanity. all lights to comply with ces 150.0 (k) | $18,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 362 Sanchez St | bathroom remodel, non-structural. remove non-bearing wall between water closet & shower to create full bathroom. replace (e) with new tub/shower, toilet, vanity. all lighting to comply with cec 150.0.kDetails
bathroom remodel, non-structural. remove non-bearing wall between water closet & shower to create full bathroom. replace (e) with new tub/shower, toilet, vanity. all lighting to comply with cec 150.0.k | $16,000 |
| Feb 17, 2022 | Completed final sign-off Mar 2023 | 1239 19th Av | 45 sqft master bath on 2nd floor relocate interior non bearing wall to expand wic to bedroom and relocate door to bathroom. no structrual replace existing light fixtures with (n) curbed shower, toilet and vanity. all lighing to comply with cec 150.0 (k)Details
45 sqft master bath on 2nd floor relocate interior non bearing wall to expand wic to bedroom and relocate door to bathroom. no structrual replace existing light fixtures with (n) curbed shower, toilet and vanity. all lighing to comply with cec 150.0 (k) | $18,000 |
| Feb 17, 2022 | Completed final sign-off Dec 2023 | 207 Cole St | one 42 sq. ft. bathroom remodel on 2/f. no structural, no changes to walls or openings. replace (e) with new tub/shower, double vanity and toilet. all lighting to comply with cec 150.0 (k).Details
one 42 sq. ft. bathroom remodel on 2/f. no structural, no changes to walls or openings. replace (e) with new tub/shower, double vanity and toilet. all lighting to comply with cec 150.0 (k). | $14,500 |
| Feb 10, 2022 | Completed final sign-off Jan 2023 | 183 Saint Germain Av | (2) bathroom remodels on 2nd floor. no structral bath (a) 50 sqft (bedroom) bath replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. bath hall bath 43 sqft replace existing with (n) curbed shower, toilet and vanity.Details
(2) bathroom remodels on 2nd floor. no structral bath (a) 50 sqft (bedroom) bath replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. bath hall bath 43 sqft replace existing with (n) curbed shower, toilet and vanity. | $29,500 |
| Feb 10, 2022 | Completed final sign-off Aug 2022 | 900 Bush St | 41 sqft bathroom remodel on 13th floor. replace existing with new curbed shower, toilet and vanity. no structural no changes to walls openings. all lighting to comply with cec 150.0(k)Details
41 sqft bathroom remodel on 13th floor. replace existing with new curbed shower, toilet and vanity. no structural no changes to walls openings. all lighting to comply with cec 150.0(k) | $14,500 |
| Feb 8, 2022 | Completed final sign-off Aug 2022 | 1610 47th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Feb 8, 2022 | Completed final sign-off Jul 2022 | 301 Kensington Wy | in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s). | $14,500 |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 2559 33rd Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $14,500 |
| Jan 24, 2022 | Never finaled issued Jan 2022, no final | 744 Fell St | guest bath 51 sqft bathroom remodel on 3rd floor no structural no changes to walls or openings. replace existing with (n) tub shower toilet and vanity. all (n) fixture and finishes all lighting to comply with cec 150.0 (k).Details
guest bath 51 sqft bathroom remodel on 3rd floor no structural no changes to walls or openings. replace existing with (n) tub shower toilet and vanity. all (n) fixture and finishes all lighting to comply with cec 150.0 (k). | $14,500 |
| Jan 24, 2022 | Completed final sign-off Dec 2023 | 2185 Bush St | 61 sqft bathroom remodel in-kind on 2nd floor. no structural, no changes to walls or openings. replace existing with new curbed shower, double vanity + toilet. all (n) fixtures + finishes. all lighting to comply with cec 150.0(k).Details
61 sqft bathroom remodel in-kind on 2nd floor. no structural, no changes to walls or openings. replace existing with new curbed shower, double vanity + toilet. all (n) fixtures + finishes. all lighting to comply with cec 150.0(k). | $14,500 |
| Jan 24, 2022 | Completed final sign-off Jan 2023 | 744 Fell St | 105 sqft bathroom remodel on 3rd floor. no structural changes to walls or openings replace existing with (n) curbed shower, toilet vanity and soaking tub all (n) fixture and finishes all lighting to comply with cec 150.0 (k).Details
105 sqft bathroom remodel on 3rd floor. no structural changes to walls or openings replace existing with (n) curbed shower, toilet vanity and soaking tub all (n) fixture and finishes all lighting to comply with cec 150.0 (k). | $16,500 |
| Jan 24, 2022 | Completed final sign-off Nov 2022 | 2185 Bush St | 38 sqft bathroom remodel on 1st floor. no structural, no changes to walls or openings. replace existing with new tub/shower, vanity + toilet. all (n) fixtures + finishes. all lighting to comply with cec 150.0(k).Details
38 sqft bathroom remodel on 1st floor. no structural, no changes to walls or openings. replace existing with new tub/shower, vanity + toilet. all (n) fixtures + finishes. all lighting to comply with cec 150.0(k). | $14,500 |
| Jan 24, 2022 | Completed final sign-off May 2022 | 216 Sussex St | 37 sqft bathroom remodel on 2nd floor no structural. no changes to walls or openings. replace existing with (n) curbed shower, toilet, and vanity all new fixtures finishes. all lighting to comply with cec 150.0(k)Details
37 sqft bathroom remodel on 2nd floor no structural. no changes to walls or openings. replace existing with (n) curbed shower, toilet, and vanity all new fixtures finishes. all lighting to comply with cec 150.0(k) | $14,500 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 107 Capistrano Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $14,500 |
| Jan 10, 2022 | Completed final sign-off Jun 2022 | 109 Germania St | remodel bathroom in-kind (1st fl) . new curbless shower, toilet, vanity, all (n) fixtures & finishes.Details
remodel bathroom in-kind (1st fl) . new curbless shower, toilet, vanity, all (n) fixtures & finishes. | $14,500 |
| Jan 10, 2022 | Never finaled issued Jan 2022, no final | 1784 Page St | remodel main bathroom on 3/f. no structural, no changes to walls or openings. replace all (e) with (n) tub/shower, double vanity & toilet. all new fixtures & finishes. all lighting to comply with cec 150.0k.Details
remodel main bathroom on 3/f. no structural, no changes to walls or openings. replace all (e) with (n) tub/shower, double vanity & toilet. all new fixtures & finishes. all lighting to comply with cec 150.0k. | $14,500 |
| Jan 10, 2022 | Completed final sign-off Mar 2023 | 1239 19th Av | 1241 19th avenue: remodel guest bathroom in0-kind. no structural or changes to wall or other oepning. new fixtures and finishes. all lighting to comply with cec 150.0kDetails
1241 19th avenue: remodel guest bathroom in0-kind. no structural or changes to wall or other oepning. new fixtures and finishes. all lighting to comply with cec 150.0k | $14,500 |
| Jan 5, 2022 | Completed final sign-off May 2022 | 15 Almaden Ct | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Jan 5, 2022 | Completed final sign-off Jan 2023 | 260 Holyoke St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Jan 5, 2022 | Completed final sign-off Sep 2022 | 2084 14th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,500 |
| Dec 28, 2021 | Completed final sign-off Nov 2022 | 1239 19th Av | 32 sq ft. guest bathroom remodel in kind on 2nd fl. no structural no changes to walls or openings, replace (e) with (n) tub/shower toilet, and vanity all (n) fixtures and finishes, lighting to comply with ces 150.0 (k)Details
32 sq ft. guest bathroom remodel in kind on 2nd fl. no structural no changes to walls or openings, replace (e) with (n) tub/shower toilet, and vanity all (n) fixtures and finishes, lighting to comply with ces 150.0 (k) | $14,500 |
| Dec 28, 2021 | Completed final sign-off Dec 2022 | 1784 Page St | 102 sq ft. master bathrom remodel in kind on 3rd fl. no structural, no changes to walls or openings replace (e) with (n) curbed shower toilet, and double vanity all (n) fixtures and finishes lighting to comply with cec 150.0 (k)Details
102 sq ft. master bathrom remodel in kind on 3rd fl. no structural, no changes to walls or openings replace (e) with (n) curbed shower toilet, and double vanity all (n) fixtures and finishes lighting to comply with cec 150.0 (k) | $16,500 |
| Dec 23, 2021 | Completed final sign-off Aug 2022 | 1979 Broadway | remodel bathroom on 2/f. replace (e) tub with new rubed shower, toilet, vanity - new fixtures and finishes. no structural work.Details
remodel bathroom on 2/f. replace (e) tub with new rubed shower, toilet, vanity - new fixtures and finishes. no structural work. | $14,500 |
| Dec 22, 2021 | Completed final sign-off May 2022 | 1974 Filbert St | in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 2 shower pan(s). | $29,000 |
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 261 Buena Vista East Av | remodel on 2/f. expand bathroom into (e) bedroom closet. (n) tub/shower, vanity, toilet. all (n) fixture & finishes.Details
remodel on 2/f. expand bathroom into (e) bedroom closet. (n) tub/shower, vanity, toilet. all (n) fixture & finishes. | $16,000 |
| Dec 20, 2021 | Completed final sign-off Apr 2024 | 1416 44th Av | remodel on 2/f. expand bathroom into (e) bedroom closet. (n) tub/shower, vanity, toilet. all (n) fixture & finishes.Details
remodel on 2/f. expand bathroom into (e) bedroom closet. (n) tub/shower, vanity, toilet. all (n) fixture & finishes. | $16,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2022 | 731 10th Av | 55 sq ft bath room remodel on 2nd floor. in kind. structrual. no changes to walls or openings. new tub/shower, toilet, vanity. all new fixtures finishes.Details
55 sq ft bath room remodel on 2nd floor. in kind. structrual. no changes to walls or openings. new tub/shower, toilet, vanity. all new fixtures finishes. | $14,500 |
| Dec 14, 2021 | Completed final sign-off Jul 2022 | 1358 Utah St | 67 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. (n) tub/shower, toilet, vanity all (n) fixtures all lighting to comply with cec 150.0 (k).Details
67 sqft bathroom remodel in-kind. no structural, no changes to walls or openings. (n) tub/shower, toilet, vanity all (n) fixtures all lighting to comply with cec 150.0 (k). | $14,500 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 332 Spruce St | 2/f: 58 sq. ft bathroom remodel. no structural. combine existing tub/shower room with existing w/c to create a full bathroom by removing non bearing partition wall. new tub/shower, new toilet, new double vanity.Details
2/f: 58 sq. ft bathroom remodel. no structural. combine existing tub/shower room with existing w/c to create a full bathroom by removing non bearing partition wall. new tub/shower, new toilet, new double vanity. | $14,500 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 363 San Benito Wy | ground floor: 104 sq. ft. bathroom remodel. no structural. remove non bearing wall to reduce size of (e) bathroom and increase size of (e) bedroom closet. new curbed shower, toilet, double vanity, all new fixtures, soaking tub. all lighting to comply with cec 150.0 (k)Details
ground floor: 104 sq. ft. bathroom remodel. no structural. remove non bearing wall to reduce size of (e) bathroom and increase size of (e) bedroom closet. new curbed shower, toilet, double vanity, all new fixtures, soaking tub. all lighting to comply with cec 150.0 (k) | $18,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 240 Arguello Bl | expand (e) full bath into bedroom closet to allow for (e) half bath to expand to a 3/4 bath. no structural. no work on bearing walls. bath a: 54sf new curbed shower, toilet and double vanity. bath b: 53 sf new curbed shower, toilet and vanity. all new fixtures and finishes.Details
expand (e) full bath into bedroom closet to allow for (e) half bath to expand to a 3/4 bath. no structural. no work on bearing walls. bath a: 54sf new curbed shower, toilet and double vanity. bath b: 53 sf new curbed shower, toilet and vanity. all new fixtures and finishes. | $32,000 |
| Dec 13, 2021 | Completed final sign-off Jul 2022 | 195 20th Av | 66 sq ft bathroom remodel in kind. no structural. no changes to walls or openings. (n) curbed shower, toilet, double vanity, all (n) fixtures and finishes. all lighting to comply with cec 150.0 (k). 2nd floor.Details
66 sq ft bathroom remodel in kind. no structural. no changes to walls or openings. (n) curbed shower, toilet, double vanity, all (n) fixtures and finishes. all lighting to comply with cec 150.0 (k). 2nd floor. | $14,500 |
| Dec 13, 2021 | Completed final sign-off Nov 2022 | 242 Arguello Bl | expand (e) full bath into bedroom closet to allow for (e) half bath to expand to a 3/4 bath. no structural. no work on bearing walls. bath a: 54sf new curbed shower, toilet and double vanity. bath b: 53 sf new curbed shower, toilet and vanity. all new fixtures and finishes.Details
expand (e) full bath into bedroom closet to allow for (e) half bath to expand to a 3/4 bath. no structural. no work on bearing walls. bath a: 54sf new curbed shower, toilet and double vanity. bath b: 53 sf new curbed shower, toilet and vanity. all new fixtures and finishes. | $32,000 |
| Dec 13, 2021 | Completed final sign-off Oct 2022 | 1427 08th Av | apartment #2: two bathroom remodel in kind. no structural,no changes to walls or openings. bath a: 48 sq ft 2nd floor,(n) tub/shower,vanity,toilet. bath b: 88 sq ft 2nd fl,(n) curbed shower,duble vanity,toilet all (n)fixtures & finishes. all lighting to comply with ced 150.0(k)Details
apartment #2: two bathroom remodel in kind. no structural,no changes to walls or openings. bath a: 48 sq ft 2nd floor,(n) tub/shower,vanity,toilet. bath b: 88 sq ft 2nd fl,(n) curbed shower,duble vanity,toilet all (n)fixtures & finishes. all lighting to comply with ced 150.0(k) | $30,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 1288 Mcallister St | apartment #101: bathroom remodel in kind, no structural.no changes to walls or openings.(n)tub/shower,toilet,vanity,all (n) fixtures & finishes,all lighting to comply with cec 150.0.Details
apartment #101: bathroom remodel in kind, no structural.no changes to walls or openings.(n)tub/shower,toilet,vanity,all (n) fixtures & finishes,all lighting to comply with cec 150.0. | $14,500 |
| Dec 1, 2021 | Completed final sign-off Nov 2022 | 1953 Taylor St | one 40 sq ft bathroom remodel on 2nd fl no structural . no changes to walls or openings. no structural new tub shower, vanity, toilet all fixtures and finishes. all lighting to comply with cec 150.0kDetails
one 40 sq ft bathroom remodel on 2nd fl no structural . no changes to walls or openings. no structural new tub shower, vanity, toilet all fixtures and finishes. all lighting to comply with cec 150.0k | $14,500 |
| Dec 1, 2021 | Completed final sign-off Apr 2022 | 3483 18th St | one 48 sq ft bathroom remodel on 2nd fl no structural. no changes to walls or openings. new curbed shower, toilet, vanity all new fixtures and finishes. all lighting to comply with cec 150.kDetails
one 48 sq ft bathroom remodel on 2nd fl no structural. no changes to walls or openings. new curbed shower, toilet, vanity all new fixtures and finishes. all lighting to comply with cec 150.k | $14,500 |
| Dec 1, 2021 | Completed final sign-off Apr 2022 | 3485 16th St | one 37 sq ft bathroom remodel on 2nd fl. no structural . no changes to walls or openings. new tub/shower, vanity, toilet all new fixtures and finishesDetails
one 37 sq ft bathroom remodel on 2nd fl. no structural . no changes to walls or openings. new tub/shower, vanity, toilet all new fixtures and finishes | $14,500 |
| Dec 1, 2021 | Completed final sign-off May 2022 | 1325 Indiana St | unit 9: 59 sq ft bathroom remodel on 2nd fl mezz. no structural. expand (e) room 5' x 7'8" to 5'6" x 10'10" by moving non bearing partition walls, (n) new tub/shower, vanity and toilet. new finishes and fixtures, all lighting to comply w/ cec 150.0 (k)Details
unit 9: 59 sq ft bathroom remodel on 2nd fl mezz. no structural. expand (e) room 5' x 7'8" to 5'6" x 10'10" by moving non bearing partition walls, (n) new tub/shower, vanity and toilet. new finishes and fixtures, all lighting to comply w/ cec 150.0 (k) | $20,000 |
| Nov 23, 2021 | Completed final sign-off Jul 2022 | 420 Holladay Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Nov 22, 2021 | Completed final sign-off Sep 2022 | 251 Rose St | remodel one 34 sq ft bath in kind, no-structural,no changes to walls or openings,2nd fl(n)curbed shower,(n)toilet,(n) vanity,all (n)fixtures & finishes all lighting to comply with cfc 150.Details
remodel one 34 sq ft bath in kind, no-structural,no changes to walls or openings,2nd fl(n)curbed shower,(n)toilet,(n) vanity,all (n)fixtures & finishes all lighting to comply with cfc 150. | $14,500 |
| Nov 18, 2021 | Completed final sign-off Dec 2021 | 92 Putnam St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |
| Nov 17, 2021 | Completed final sign-off Aug 2022 | 50 Rockwood Ct | bathroom remodel on 3/f. no strutural work. expand (e) masterbath into adj walk-in closet. remove non-load bearing partiion wall and built-in closet. new curbed shower, tilet, sobule vbanity, fixtures & finisehs. new steam shower. all lighting to comply with cec 150.0kDetails
bathroom remodel on 3/f. no strutural work. expand (e) masterbath into adj walk-in closet. remove non-load bearing partiion wall and built-in closet. new curbed shower, tilet, sobule vbanity, fixtures & finisehs. new steam shower. all lighting to comply with cec 150.0k | $20,000 |
| Nov 16, 2021 | Completed final sign-off May 2022 | 880 Corbett Av | 2 bathroom remodels in kind on 3rd fl. all lighting to comply with cec 150.0 (k). no structural no structural, no changes to walls or openings. master guest (n) curbless shower, soaking tub, double vanity, toilet. curbed shower, vanity, toilet. all (n) fixtures & finishes.Details
2 bathroom remodels in kind on 3rd fl. all lighting to comply with cec 150.0 (k). no structural no structural, no changes to walls or openings. master guest (n) curbless shower, soaking tub, double vanity, toilet. curbed shower, vanity, toilet. all (n) fixtures & finishes. | $29,000 |
| Nov 16, 2021 | Completed final sign-off Feb 2022 | 263 Mullen Av | 43 sqft ground floor (1) bathroom remodel in-kind. no structural, no changes to walls or openings. (n) tubs/shower, vanity, toilet, fixtures + finishes. all lighting to comply with cec 150.0 (k)Details
43 sqft ground floor (1) bathroom remodel in-kind. no structural, no changes to walls or openings. (n) tubs/shower, vanity, toilet, fixtures + finishes. all lighting to comply with cec 150.0 (k) | $14,500 |
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 880 Corbett Av | bathroom remodel: 45 sq ft remodel in kind on 2nd floor. no structural.no changes to walls or openings, new tub/shower,toilet,vanity fixtures & finsihes all to comply with ced 150.o(k)Details
bathroom remodel: 45 sq ft remodel in kind on 2nd floor. no structural.no changes to walls or openings, new tub/shower,toilet,vanity fixtures & finsihes all to comply with ced 150.o(k) | $14,500 |
| Nov 16, 2021 | Completed final sign-off Nov 2022 | 715 De Haro St | bathroom remodel:50 sq ft remodel on ground fl in kind. no structural no changes to walls or openings, all lighting to comply wityh cec 150.0(k)(n) tub/shower,vanity,toilet,fixtures & finishes.Details
bathroom remodel:50 sq ft remodel on ground fl in kind. no structural no changes to walls or openings, all lighting to comply wityh cec 150.0(k)(n) tub/shower,vanity,toilet,fixtures & finishes. | $14,500 |
| Nov 16, 2021 | Completed final sign-off Sep 2022 | 279 Clinton Pk | bath remodel: 40sq ft remodel in kind on 3rd floor. no structural, no changes to walls or openings (n) curbed shwoer,toilet,vanity,fixtures & finishes.all lighting to comply with cec 150.0(k)Details
bath remodel: 40sq ft remodel in kind on 3rd floor. no structural, no changes to walls or openings (n) curbed shwoer,toilet,vanity,fixtures & finishes.all lighting to comply with cec 150.0(k) | $14,500 |
| Nov 12, 2021 | Never finaled issued Nov 2021, no final | 1779 Alabama St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,500 |
| Nov 4, 2021 | Completed final sign-off May 2022 | 1345 Lake St | one 45sqft bathroom remodel in kind. no structural. no changes to walls or openings. 3/f: new tub/shower, toilet, vanity. all new fixtures and finishes. all lighting to comply with cec 150.0(k)Details
one 45sqft bathroom remodel in kind. no structural. no changes to walls or openings. 3/f: new tub/shower, toilet, vanity. all new fixtures and finishes. all lighting to comply with cec 150.0(k) | $14,500 |
| Nov 4, 2021 | Completed final sign-off May 2022 | 45 Joost Av | one 45sqft bathroom remodel in kind. no structural. no changes to walls or openings. 2/f: new tub/shower, toilet, vanity. all new fixtures and finishes. all lighting to comply with cec 150.0(k)Details
one 45sqft bathroom remodel in kind. no structural. no changes to walls or openings. 2/f: new tub/shower, toilet, vanity. all new fixtures and finishes. all lighting to comply with cec 150.0(k) | $14,500 |
| Oct 25, 2021 | Completed final sign-off Jan 2022 | 3184 Mission St | unit #405:revision to bpa#202108106108. relocation of plumbing wall for coverd shower.Details
unit #405:revision to bpa#202108106108. relocation of plumbing wall for coverd shower. | $1,000 |
| Oct 25, 2021 | Completed final sign-off Jun 2023 | 625 03rd Av | converage existing toilet room with existing 1/2 bath to create full bathby removing interior partion wall. new tub shower, new toilet, new vanity, all fixtures. no structural.Details
converage existing toilet room with existing 1/2 bath to create full bathby removing interior partion wall. new tub shower, new toilet, new vanity, all fixtures. no structural. | $17,000 |
| Oct 25, 2021 | Completed final sign-off Jun 2022 | 380 San Carlos St | 55 sqft bathroom remodel. no structural no changes to walls or openings. (n) tub/ shower (n) toilet, (n) vanity, all (n) fixtures all lighting to comply with cec 150.0 (k)Details
55 sqft bathroom remodel. no structural no changes to walls or openings. (n) tub/ shower (n) toilet, (n) vanity, all (n) fixtures all lighting to comply with cec 150.0 (k) | $14,500 |
| Oct 4, 2021 | Completed final sign-off Nov 2021 | 88 King St | #123: relocation of interior bathroom door. no structural.Details
#123: relocation of interior bathroom door. no structural. | $3,000 |
| Oct 4, 2021 | Completed final sign-off Mar 2022 | 1556 Green St | 1 bathroom remodel on 2nd fl. in-kind no structural, no changes to walls or openings, (n) curbed shower, (n) toilet (n) vanity all (n) fixtures and finishes all lighting to comply w/cec 150.o(k)Details
1 bathroom remodel on 2nd fl. in-kind no structural, no changes to walls or openings, (n) curbed shower, (n) toilet (n) vanity all (n) fixtures and finishes all lighting to comply w/cec 150.o(k) | $14,500 |
| Oct 4, 2021 | Completed final sign-off Jun 2022 | 363 San Benito Wy | two bathroom remodel in kind all lighting to comply with cec 150.0(k) no structural no changes to walls or opening. both baths on ground floor (bath a) 48sqft full bath (n) curbed shower, (n) toilet (n) vanity (bath b) 23sqft 1/2 bath (n) toilet (n) vanity all (n) fixtures and finishesDetails
two bathroom remodel in kind all lighting to comply with cec 150.0(k) no structural no changes to walls or opening. both baths on ground floor (bath a) 48sqft full bath (n) curbed shower, (n) toilet (n) vanity (bath b) 23sqft 1/2 bath (n) toilet (n) vanity all (n) fixtures and finishes | $28,000 |
| Oct 4, 2021 | Completed final sign-off Feb 2022 | 650 Mangels Av | revison: ba# 202104148525: remove 89sqft bathroom 3rd floor from scope.Details
revison: ba# 202104148525: remove 89sqft bathroom 3rd floor from scope. | |
| Oct 4, 2021 | Completed final sign-off Sep 2022 | 283 Jersey St | 1 bath remodel in kind no structural, no changes to walls or openings, (n) curbed shower (n) toilet, (n) vanity, all (n) fixutres and finishes, all lights to comply with cec 150.0 (k)Details
1 bath remodel in kind no structural, no changes to walls or openings, (n) curbed shower (n) toilet, (n) vanity, all (n) fixutres and finishes, all lights to comply with cec 150.0 (k) | $14,500 |
| Oct 4, 2021 | Completed final sign-off Jan 2022 | 1440 Leavenworth St | one bathroom remodel in kind no structural np changes to walls or openings. (n) tub/shower, (n) toilet, (n) vanity all (n) fixtures and finishes all lighting to comply with cec (k)Details
one bathroom remodel in kind no structural np changes to walls or openings. (n) tub/shower, (n) toilet, (n) vanity all (n) fixtures and finishes all lighting to comply with cec (k) | $14,500 |
| Sep 23, 2021 | Completed final sign-off Mar 2022 | 2790 19th Av | one 46 sq feet bathroom remodel in-kind no structural no changes to walls or openings. (n) curbed shower (n) toilet, (n) vanity. lighting to comply with cec 150.0(k).Details
one 46 sq feet bathroom remodel in-kind no structural no changes to walls or openings. (n) curbed shower (n) toilet, (n) vanity. lighting to comply with cec 150.0(k). | $14,500 |
| Sep 23, 2021 | Completed final sign-off Jun 2022 | 1521 12th Av | one 48 sqft bathroom remodel in kind- no structural no changes to walls or openings. (n) tub/shower, (n) toilet (n) vanity all lighting to comply with cec 150.0(k)Details
one 48 sqft bathroom remodel in kind- no structural no changes to walls or openings. (n) tub/shower, (n) toilet (n) vanity all lighting to comply with cec 150.0(k) | $14,500 |
| Sep 21, 2021 | Completed final sign-off Apr 2022 | 242 Minerva St | in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $40,000 |
| Sep 14, 2021 | Completed final sign-off Jan 2022 | 1036 Potrero Av | 60 sq ft bath remodel. no structural. no changes to walls or openings. new curbed shower new toilet, new vanity all new fixtures. light to comply with cec 150.5 kDetails
60 sq ft bath remodel. no structural. no changes to walls or openings. new curbed shower new toilet, new vanity all new fixtures. light to comply with cec 150.5 k | $14,500 |
| Sep 7, 2021 | Completed final sign-off Mar 2022 | 115 Nevada St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,500 |
| Aug 30, 2021 | Completed final sign-off Dec 2021 | 320 Alabama St | one 43 sq ft bathrom remodel on 3rd floor in kind, no structual no changes to walls or openings. new curbed shower, new toilet, new vanity & all new fixtures. lighting to compy with cec 150.0(k)Details
one 43 sq ft bathrom remodel on 3rd floor in kind, no structual no changes to walls or openings. new curbed shower, new toilet, new vanity & all new fixtures. lighting to compy with cec 150.0(k) | $14,500 |
| Aug 30, 2021 | Completed final sign-off Jan 2022 | 2001 Mcallister St | 63 sq ft bathroom remodel on 2/f in-kind. no structural work or changes to walls or openings. new tub/shower, toilet, vanity & fixtures. all new fixtures lighting to compy withcec 150.0(k).Details
63 sq ft bathroom remodel on 2/f in-kind. no structural work or changes to walls or openings. new tub/shower, toilet, vanity & fixtures. all new fixtures lighting to compy withcec 150.0(k). | $14,500 |
| Aug 30, 2021 | Completed final sign-off Dec 2021 | 2412 Harrison St | apt 109 bathroom remodel on 4/f in-kind. no structural work or changes to walls or openings. new curbed shower, toilet, vanity & fixtures. lighting to compy withcec 150.0(k)curbed.Details
apt 109 bathroom remodel on 4/f in-kind. no structural work or changes to walls or openings. new curbed shower, toilet, vanity & fixtures. lighting to compy withcec 150.0(k)curbed. | $14,500 |
| Aug 30, 2021 | Never finaled issued Aug 2021, no final | 2948 California St | no moving walls: 100 sqft bathroom remodel in-kind 2nd fl. no structural, no changes to walls or openings,(n) curbed shower, (n) soaking tub (n) bidet (n) double vanity all (n) fixtures lighting to comply w/ cec 150.0 (k)Details
no moving walls: 100 sqft bathroom remodel in-kind 2nd fl. no structural, no changes to walls or openings,(n) curbed shower, (n) soaking tub (n) bidet (n) double vanity all (n) fixtures lighting to comply w/ cec 150.0 (k) | $14,500 |
| Aug 30, 2021 | Completed final sign-off Dec 2022 | 155 Borica St | (2) bathroom remodels, in-kind on ground fl., no structural, no changes to wall or openings, 2 curbed showers, 2 toilets, 1 single vanity, 1 double vanity, all (n) fixtures, lighting to comply w/ cec 150.0 (k)Details
(2) bathroom remodels, in-kind on ground fl., no structural, no changes to wall or openings, 2 curbed showers, 2 toilets, 1 single vanity, 1 double vanity, all (n) fixtures, lighting to comply w/ cec 150.0 (k) | $29,000 |
| Aug 30, 2021 | Completed final sign-off Mar 2022 | 601 Van Ness Av | apt 432 bathroom remodel on 4/f in-kind. no structural work or changes to walls or openings. new curbed shower, toilet, vanity & fixtures. lighting to comply with cec 150.0(k)curbed.Details
apt 432 bathroom remodel on 4/f in-kind. no structural work or changes to walls or openings. new curbed shower, toilet, vanity & fixtures. lighting to comply with cec 150.0(k)curbed. | $14,500 |
| Aug 30, 2021 | Completed final sign-off Jul 2022 | 260 King St | apt 367 bathroom remodel on 3/f in-kind. no structural work or changes to walls or openings. new tub/shower, toilet, vanity & fixtures. lighting to comply with cec 150.0(k) curbed.Details
apt 367 bathroom remodel on 3/f in-kind. no structural work or changes to walls or openings. new tub/shower, toilet, vanity & fixtures. lighting to comply with cec 150.0(k) curbed. | $14,500 |
| Aug 23, 2021 | Completed final sign-off Mar 2022 | 30 Lawrence Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,500 |
| Aug 23, 2021 | Completed final sign-off Jan 2022 | 122 18th Av | in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s). | $14,500 |
| Aug 19, 2021 | Completed final sign-off Apr 2022 | 2640 Green St | 2 remodel bathroom oin-kind. no structural. no changes to walls or openings or layout. unit 1: master bath on g/f with new tub/shower, bidet, double vanity; unit 2: hallbathrom on 2/f: new tub/shower,bidet,double vanity. all new fixtures. lighting to comply with cec 150.0kDetails
2 remodel bathroom oin-kind. no structural. no changes to walls or openings or layout. unit 1: master bath on g/f with new tub/shower, bidet, double vanity; unit 2: hallbathrom on 2/f: new tub/shower,bidet,double vanity. all new fixtures. lighting to comply with cec 150.0k | $29,500 |
| Aug 19, 2021 | Never finaled issued Aug 2021, no final | 1700 Gough St | apt 504: bathroom remodel on 4/f. no structural changes. no mod to walls or openings or layout. new tub/shower, toilet, vanity. all new fixtures. lighting to comply with cec 150.0kDetails
apt 504: bathroom remodel on 4/f. no structural changes. no mod to walls or openings or layout. new tub/shower, toilet, vanity. all new fixtures. lighting to comply with cec 150.0k | $14,500 |
| Aug 19, 2021 | Completed final sign-off Jan 2022 | 110 Seal Rock Dr | remodel bathroom on 2/f. no structural. no changes to walls or openings or layout. new curbed shower, bidet, vanity. all new fixtures. lighti to comply with cec 150.0kDetails
remodel bathroom on 2/f. no structural. no changes to walls or openings or layout. new curbed shower, bidet, vanity. all new fixtures. lighti to comply with cec 150.0k | $14,500 |
| Aug 18, 2021 | Completed final sign-off Mar 2022 | 444 Dellbrook Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $14,500 |