Erik Andersen
- Listed as
- engineer
- Firm
- Andersen Engineering
- Based in
- Richmond
- On San Francisco permits
- Jul 2016 to Aug 2026
11 permits since 2000 (engineer on 11 permits): 7 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 1490 43rd Av | convert existing atrium to habitable space & incorporate this space in the kitchen. renovate the kitchen with a new layoutDetails
convert existing atrium to habitable space & incorporate this space in the kitchen. renovate the kitchen with a new layout | $110,000 | |
| Dec 29, 2025 | In progress issued Apr 2026 | 1501 Sunnydale Av | Cahill Guzman Construction Group Jv | deferred submittal block 7 - prefabricated metal stairs pa# 202211297323-s3.Details
deferred submittal block 7 - prefabricated metal stairs pa# 202211297323-s3. | $50,000 |
| Dec 24, 2024 | Completed final sign-off Jan 2025 | 750 44th Av | revision to pa 201805038088-s. reduction in scope- no 274 sqft rear yard addition or 111 sq ft deck. remaining plan: a) legalize, renovate and expand (e) lower lvl dwelling unit as follows: 436 sq ft renovation of (e) lower lvl dwelling area, 93 sq ft conversion of (e) garage to dwelling area.Details
revision to pa 201805038088-s. reduction in scope- no 274 sqft rear yard addition or 111 sq ft deck. remaining plan: a) legalize, renovate and expand (e) lower lvl dwelling unit as follows: 436 sq ft renovation of (e) lower lvl dwelling area, 93 sq ft conversion of (e) garage to dwelling area. | ||
| Jun 20, 2023 | Completed final sign-off Oct 2025 | 22 Johnson St | Suffolk-Guzman A Joint Venture Iii | mayoral ed 17-02, erect tower crane for housing project. ref bpa#202011199306Details
mayoral ed 17-02, erect tower crane for housing project. ref bpa#202011199306 | $212,000 |
| May 18, 2023 | Completed final sign-off Feb 2024 | 233 27th St | revision to bpa#202303033008, supplemental structural work/(e) field conditions discovered during constructionDetails
revision to bpa#202303033008, supplemental structural work/(e) field conditions discovered during construction | $1,000 | |
| Feb 18, 2021 | Completed final sign-off Sep 2021 | 219 Vicente St | replace kitchen & 1/2 bath inkind on 1/f. convert minibar to bathroom on 2/f. remove dimising wall between kitchen & dining, add beams and coumns. all interior work only. no change to heating, no new exterior wall/windows or doors.Details
replace kitchen & 1/2 bath inkind on 1/f. convert minibar to bathroom on 2/f. remove dimising wall between kitchen & dining, add beams and coumns. all interior work only. no change to heating, no new exterior wall/windows or doors. | $20,000 | |
| Jan 14, 2020 | Expired or cancelled cancelled Jan 2026 | 88 King St | Wall 2 Wall Construction Inc | revision to pa# 2019-0530-1988: adding simpson threaded rods since the surface the railing will be added to is concrete.Details
revision to pa# 2019-0530-1988: adding simpson threaded rods since the surface the railing will be added to is concrete. | $16,000 |
| May 30, 2019 | Completed final sign-off Mar 2022 | 88 King St | Wall 2 Wall Construction Inc | unit #123: frame walls and ceiling to support 3-4 glass sliding door in loft area. install posts to support a glass gruardrail that will be installed in place of exisiting ponywall. run new wiring to install 4 recessed lights, 1 fan light and 1 chandelierDetails
unit #123: frame walls and ceiling to support 3-4 glass sliding door in loft area. install posts to support a glass gruardrail that will be installed in place of exisiting ponywall. run new wiring to install 4 recessed lights, 1 fan light and 1 chandelier | $16,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2019 | 1721 Newcomb Av | Thomas E Strebel Dba 4 Eco Living | conversion of basement into habitable space ( partial area) with new master bedroom & bathroom, new staircase. remofel kitchen, voluntary foundation retrofit. new rear patio 30" at grade.Details
conversion of basement into habitable space ( partial area) with new master bedroom & bathroom, new staircase. remofel kitchen, voluntary foundation retrofit. new rear patio 30" at grade. | $130,000 |
| Sep 29, 2016 | Never finaled issued Sep 2016, no final | 12 Iris Av | Community Reconstruction Solutions | removed stucco, water proofing and flashing in kind 800sq ft. repair in kind.Details
removed stucco, water proofing and flashing in kind 800sq ft. repair in kind. | $47,000 |
| Jul 1, 2016 | Completed final sign-off Aug 2016 | 2833 Golden Gate Av | Sanchez Home Improvement | rebuild existing staircase; replace in kind.Details
rebuild existing staircase; replace in kind. | $15,000 |