Wall 2 Wall Construction Inc
- Based in
- Concord
- On San Francisco permits
- May 2019 to Jan 2020
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2020 | Expired or cancelled cancelled Jan 2026 | 88 King St | revision to pa# 2019-0530-1988: adding simpson threaded rods since the surface the railing will be added to is concrete.Details
revision to pa# 2019-0530-1988: adding simpson threaded rods since the surface the railing will be added to is concrete. | $16,000 |
| Sep 27, 2019 | Expired or cancelled cancelled Jan 2026 | 2100 Baker St | put in a beam and post to replace existing beam and post. add new ceiling lights, gas line for range water and drain lines for new sink and locationDetails
put in a beam and post to replace existing beam and post. add new ceiling lights, gas line for range water and drain lines for new sink and location | $14,000 |
| Aug 19, 2019 | Expired or cancelled cancelled Sep 2019 | 88 King St | instlal 5 new ceiling lights and replace plumbing fixture in bathtub at upper bathroom including tub spout, shower head, valve and diverter. all lights shall be high-efficacy, shower head <1.8 gpm.Details
instlal 5 new ceiling lights and replace plumbing fixture in bathtub at upper bathroom including tub spout, shower head, valve and diverter. all lights shall be high-efficacy, shower head <1.8 gpm. | $2,700 |
| Aug 5, 2019 | Completed final sign-off Jun 2020 | 2102 Baker St | relocate non-structural bedroom wall.Details
relocate non-structural bedroom wall. | $2,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2020 | 1868 Van Ness Av | tenant improvements (first tenant): childcare facility in vacant tenant space on ground floor of existing 8-story mixed-use residential building. interior work only. mep included.Details
tenant improvements (first tenant): childcare facility in vacant tenant space on ground floor of existing 8-story mixed-use residential building. interior work only. mep included. | $50,000 |
| Jul 2, 2019 | Completed final sign-off Jun 2020 | 2102 Baker St | renovate extg kitchen and extg basthroom.Details
renovate extg kitchen and extg basthroom. | $15,000 |
| May 30, 2019 | Completed final sign-off Mar 2022 | 88 King St | unit #123: frame walls and ceiling to support 3-4 glass sliding door in loft area. install posts to support a glass gruardrail that will be installed in place of exisiting ponywall. run new wiring to install 4 recessed lights, 1 fan light and 1 chandelierDetails
unit #123: frame walls and ceiling to support 3-4 glass sliding door in loft area. install posts to support a glass gruardrail that will be installed in place of exisiting ponywall. run new wiring to install 4 recessed lights, 1 fan light and 1 chandelier | $16,000 |