Eric Robinson

License
C28139
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
Paulett Taggart Architects
Based in
San Francisco
On San Francisco permits
Oct 2005 to Dec 2025

41 permits since 2000 (architect on 38 permits, authorized agent-others on 3 permits, engineer on 1 permit): 32 completed, 3 in progress, 4 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 18, 2025In progress
filed Dec 2025, not yet issued
20 Franklin StD & H Constructioned13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair.
Details
Permit
202511038742
Status
filed
Filed
Dec 18, 2025
Declared cost
$30,000,000
Address
20 Franklin St

ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair.

Open the permit page

$30,000,000
Sep 16, 2024In progress
issued Nov 2024
476 Eddy StD & H Constructiontenant improvement of the ground floor commercial space of the historic yosemite apartment
Details
Permit
202409160895
Status
issued
Filed
Sep 16, 2024
Permit issued
Nov 19, 2024
Declared cost
$185,000
Address
476 Eddy St

tenant improvement of the ground floor commercial space of the historic yosemite apartment

Open the permit page

$185,000
May 6, 2024In progress
issued Feb 2026
555 07th Stmodernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco.
Details
Permit
202404160040
Status
issued
Filed
May 6, 2024
Permit issued
Feb 10, 2026
Declared cost
$641,675
Address
555 07th St

modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco.

Open the permit page

$641,675
Sep 22, 2023Completed
final sign-off Jun 2024
480 Eddy StD & H Constructionrevision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame.
Details
Permit
202309227213
Status
complete
Filed
Sep 22, 2023
Permit issued
Oct 17, 2023
Final sign-off
Jun 17, 2024
Declared cost
$20,000
Address
480 Eddy St

revision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame.

Open the permit page

$20,000
Aug 30, 2023Completed
final sign-off Jun 2024
78 Johnson StNibbi Bros Assoc Inc.revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft.
Details
Permit
202308305595
Status
complete
Filed
Aug 30, 2023
Permit issued
Oct 4, 2023
Final sign-off
Jun 4, 2024
Address
78 Johnson St

revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft.

Open the permit page

Aug 17, 2023Completed
final sign-off Jun 2024
480 Eddy StD & H Constructionadd 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1
Details
Permit
202308174630
Status
complete
Filed
Aug 17, 2023
Permit issued
Aug 29, 2023
Final sign-off
Jun 17, 2024
Declared cost
$20,000
Address
480 Eddy St

add 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1

Open the permit page

$20,000
Jul 21, 2023Completed
final sign-off Dec 2023
55 Mason StD & H Constructionrevision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished.
Details
Permit
202307212741
Status
complete
Filed
Jul 21, 2023
Permit issued
Sep 5, 2023
Final sign-off
Dec 6, 2023
Address
55 Mason St

revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished.

Open the permit page

Mar 23, 2022Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459.
Details
Permit
202203230674
Status
complete
Filed
Mar 23, 2022
Permit issued
Apr 20, 2022
Final sign-off
May 6, 2022
Address
1049 Golden Gate Av

commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459.

Open the permit page

Oct 10, 2020Completed
final sign-off Sep 2023
55 Mason StD & H Constructionvoluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.
Details
Permit
202010106291
Status
complete
Filed
Oct 10, 2020
Permit issued
Sep 3, 2021
Final sign-off
Sep 20, 2023
Declared cost
$12,000,000
Address
55 Mason St

voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.

Open the permit page

$12,000,000
Dec 19, 2019Completed
final sign-off Jun 2024
480 Eddy StD & H Construction100% affordable & priority process housing. the scope of work includes the renovation of 32 units of 100% affordable housing in a six story building, a voluntary seismic upgrade, mechanical, elect & plumb upgrades, and ground floor alterations for accessibility improvement will also be included.
Details
Permit
201912190012
Status
complete
Filed
Dec 19, 2019
Permit issued
Aug 19, 2020
Final sign-off
Jun 18, 2024
Declared cost
$8,000,000
Address
480 Eddy St

100% affordable & priority process housing. the scope of work includes the renovation of 32 units of 100% affordable housing in a six story building, a voluntary seismic upgrade, mechanical, elect & plumb upgrades, and ground floor alterations for accessibility improvement will also be included.

Open the permit page

$8,000,000
Dec 13, 2019Completed
final sign-off Jun 2024
1 Avenue Of The PalmsNibbi Bros Assoc Inc.erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building
Details
Permit
201912139581
Status
complete
Filed
Dec 13, 2019
Permit issued
Apr 13, 2021
Final sign-off
Jun 27, 2024
Declared cost
$60,000,000
Address
1 Avenue Of The Palms

erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building

Open the permit page

$60,000,000
Jun 26, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area.
Details
Permit
201906264459
Status
complete
Filed
Jun 26, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032340
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032339
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032328
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032338
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032337
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Jun 3, 2019Completed
final sign-off May 2022
1049 Golden Gate AvNibbi Bros Assoc Inc.at bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.
Details
Permit
201906032341
Status
complete
Filed
Jun 3, 2019
Permit issued
Dec 9, 2019
Final sign-off
May 6, 2022
Declared cost
$1,000,000
Address
1049 Golden Gate Av

at bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Open the permit page

$1,000,000
Mar 12, 2019Completed
final sign-off Nov 2019
951 Eddy StGuzman Construction Group Inc.unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout
Details
Permit
201903124975
Status
complete
Filed
Mar 12, 2019
Permit issued
Jun 11, 2019
Final sign-off
Nov 5, 2019
Declared cost
$48,500
Address
951 Eddy St

unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout

Open the permit page

$48,500
Jul 11, 2018Never finaled
issued Nov 2018, no final
2451 Sacramento StNibbi Bros Assoc Inc.improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a **
Details
Permit
201807114271
Status
issued
Filed
Jul 11, 2018
Permit issued
Nov 2, 2018
Declared cost
$25,000
Address
2451 Sacramento St

improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a **

Open the permit page

$25,000
Mar 15, 2017Completed
final sign-off May 2019
350 Ellis StD & H Constructionrevision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301.
Details
Permit
201703151509
Status
complete
Filed
Mar 15, 2017
Permit issued
Mar 15, 2017
Final sign-off
May 17, 2019
Declared cost
$62,000
Address
350 Ellis St

revision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301.

Open the permit page

$62,000
Jan 10, 2017Completed
final sign-off Oct 2019
350 Ellis StRcm Fire Protection Inc.install underground fire service from the curb line on ellis st to the service yard for supply to a (n) sprinkler system at 350 ellis st
Details
Permit
201701106867
Status
complete
Filed
Jan 10, 2017
Permit issued
Jan 10, 2017
Final sign-off
Oct 22, 2019
Declared cost
$10,000
Address
350 Ellis St

install underground fire service from the curb line on ellis st to the service yard for supply to a (n) sprinkler system at 350 ellis st

Open the permit page

$10,000
Sep 15, 2016Expired or cancelled
withdrawn May 2017
329 Lombard StPfautz Design And Constructionrear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape.
Details
Permit
201609157807
Status
withdrawn
Filed
Sep 15, 2016
Declared cost
$250,000
Address
329 Lombard St

rear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape.

Open the permit page

$250,000
Sep 15, 2016Expired or cancelled
withdrawn May 2017
325 Lombard StPfautz Design And Constructionfront bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel.
Details
Permit
201609157783
Status
withdrawn
Filed
Sep 15, 2016
Declared cost
$600,000
Address
325 Lombard St

front bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel.

Open the permit page

$600,000
Jan 25, 2016Never finaled
issued Dec 2016, no final
1 Zoo Rdbarrier removal: stepped area of primate center will be made accessible by providing a concrete infill ramp & platform along with new guardrails. n/a ordinance #155-13
Details
Permit
201601257854
Status
issued
Filed
Jan 25, 2016
Permit issued
Dec 29, 2016
Declared cost
$80,000
Address
1 Zoo Rd

barrier removal: stepped area of primate center will be made accessible by providing a concrete infill ramp & platform along with new guardrails. n/a ordinance #155-13

Open the permit page

$80,000
Nov 18, 2015Completed
final sign-off May 2019
350 Ellis StD & H Construction, Pac Integrations Incaccessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement.
Details
Permit
201511182921
Status
complete
Filed
Nov 18, 2015
Permit issued
Oct 13, 2016
Final sign-off
May 29, 2019
Declared cost
$21,000,000
Address
350 Ellis St

accessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement.

Open the permit page

$21,000,000
Sep 2, 2015Completed
final sign-off Dec 2018
2451 Sacramento StNibbi Bros Assoc Inc.rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades.
Details
Permit
201509025917
Status
complete
Filed
Sep 2, 2015
Permit issued
May 13, 2016
Final sign-off
Dec 12, 2018
Declared cost
$11,000,000
Address
2451 Sacramento St

rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades.

Open the permit page

$11,000,000
Mar 27, 2015Never finaled
issued Nov 2015, no final
1880 Pine StNibbi Bros Assoc Inc.moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape,
Details
Permit
201503272042
Status
issued
Filed
Mar 27, 2015
Permit issued
Nov 25, 2015
Declared cost
$7,936,478
Address
1880 Pine St

moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape,

Open the permit page

$7,936,478
Oct 31, 2014Completed
final sign-off Nov 2015
801 Arkansas Stthis project consists of ada barrier removal f0r accessibility to a public toilet room at an existing public park facility. n/a maher ordinance
Details
Permit
201410310416
Status
complete
Filed
Oct 31, 2014
Permit issued
Dec 29, 2014
Final sign-off
Nov 16, 2015
Declared cost
$80,000
Address
801 Arkansas St

this project consists of ada barrier removal f0r accessibility to a public toilet room at an existing public park facility. n/a maher ordinance

Open the permit page

$80,000
Oct 31, 2014Completed
final sign-off Aug 2015
95 Justin Drthis project consists of ada barrier removal for accessibility to the path of travel entramces + public toilet rooms of an existing public park facility. n/a maher ordinance
Details
Permit
201410310413
Status
complete
Filed
Oct 31, 2014
Permit issued
Dec 29, 2014
Final sign-off
Aug 7, 2015
Declared cost
$250,000
Address
95 Justin Dr

this project consists of ada barrier removal for accessibility to the path of travel entramces + public toilet rooms of an existing public park facility. n/a maher ordinance

Open the permit page

$250,000
Oct 17, 2014Completed
final sign-off Mar 2016
543 Howard StCannon Constructors North Incmodify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a.
Details
Permit
201410179269
Status
complete
Filed
Oct 17, 2014
Permit issued
Nov 24, 2014
Final sign-off
Mar 7, 2016
Declared cost
$47,000
Address
543 Howard St

modify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a.

Open the permit page

$47,000
Sep 5, 2014Completed
final sign-off Nov 2015
109 Oak StRoebuck Constructionrevision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total.
Details
Permit
201409055594
Status
complete
Filed
Sep 5, 2014
Permit issued
Jun 2, 2015
Final sign-off
Nov 24, 2015
Declared cost
$180,000
Address
109 Oak St

revision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total.

Open the permit page

$180,000
Jul 2, 2014Completed
final sign-off Mar 2016
543 Howard StCannon Constructors North Inct.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a.
Details
Permit
201407020395
Status
complete
Filed
Jul 2, 2014
Permit issued
Jul 11, 2014
Final sign-off
Mar 7, 2016
Declared cost
$250,000
Address
543 Howard St

t.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a.

Open the permit page

$250,000
Apr 11, 2014Completed
final sign-off Dec 2014
543 Howard StCannon Constructors North Inc4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes.
Details
Permit
201404113026
Status
complete
Filed
Apr 11, 2014
Permit issued
Jun 25, 2014
Final sign-off
Dec 31, 2014
Declared cost
$400,000
Address
543 Howard St

4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes.

Open the permit page

$400,000
Apr 4, 2013Completed
final sign-off Nov 2015
109 Oak StRoebuck Constructioncomply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors.
Details
Permit
201304043800
Status
complete
Filed
Apr 4, 2013
Permit issued
Jan 6, 2014
Final sign-off
Nov 24, 2015
Declared cost
$3,140,000
Address
109 Oak St

comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors.

Open the permit page

$3,140,000
Dec 15, 2008Completed
final sign-off Apr 2009
667 Mission StBrowncoconstruction And Development Incnew office room, remove existing partitions and dropped ceiling, new lights, power, data, modify existing hvac. mep seperate permit
Details
Permit
200812158466
Status
complete
Filed
Dec 15, 2008
Permit issued
Dec 15, 2008
Final sign-off
Apr 1, 2009
Declared cost
$30,000
Address
667 Mission St

new office room, remove existing partitions and dropped ceiling, new lights, power, data, modify existing hvac. mep seperate permit

Open the permit page

$30,000
Jul 7, 2008Never finaled
issued Jul 2008, no final
155 Jackson StPankow Special Projects Lpinterior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for elect
Details
Permit
200807076106
Status
issued
Filed
Jul 7, 2008
Permit issued
Jul 8, 2008
Declared cost
$179,100
Address
155 Jackson St

interior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for elect

Open the permit page

$179,100
Apr 28, 2008Completed
final sign-off Apr 2009
440 Davis Stinterior re-finishes of (e) residential tower main lobby. no change in use, occupancy, occ load or egress. replace in kind new front entry doors, new floor covering and wall finishes. new plumbed fountain, relocate f.a. panel, new t-24 compliant lighting & exit signs, seperate permit for fire alarm
Details
Permit
200804280774
Status
complete
Filed
Apr 28, 2008
Permit issued
May 5, 2008
Final sign-off
Apr 28, 2009
Declared cost
$439,200
Address
440 Davis St

interior re-finishes of (e) residential tower main lobby. no change in use, occupancy, occ load or egress. replace in kind new front entry doors, new floor covering and wall finishes. new plumbed fountain, relocate f.a. panel, new t-24 compliant lighting & exit signs, seperate permit for fire alarm

Open the permit page

$439,200
Feb 6, 2008Completed
final sign-off May 2009
550 Battery Stinterior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel.
Details
Permit
200802064156
Status
complete
Filed
Feb 6, 2008
Permit issued
Feb 12, 2008
Final sign-off
May 5, 2009
Declared cost
$210,000
Address
550 Battery St

interior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel.

Open the permit page

$210,000
Feb 4, 2008Completed
final sign-off Sep 2008
528 Connecticut StWorkhorse Constructionremodel kitchen and bathroom, move several interior doors, relocate opening between kitchen and dinning rm. replace 4 windows in kind, 2 of the windows in front of bldg. some structural repairs at the garage level.
Details
Permit
200802043889
Status
complete
Filed
Feb 4, 2008
Permit issued
Apr 17, 2008
Final sign-off
Sep 15, 2008
Declared cost
$100,000
Address
528 Connecticut St

remodel kitchen and bathroom, move several interior doors, relocate opening between kitchen and dinning rm. replace 4 windows in kind, 2 of the windows in front of bldg. some structural repairs at the garage level.

Open the permit page

$100,000
Oct 31, 2005Completed
final sign-off Apr 2006
500 Sansome StPrincipal Builders Inc.oti-1 7/f el me ls sp
Details
Permit
200510316959
Status
complete
Filed
Oct 31, 2005
Permit issued
Dec 12, 2005
Final sign-off
Apr 28, 2006
Declared cost
$200,000
Address
500 Sansome St

oti-1 7/f el me ls sp

Open the permit page

$200,000