Eric Robinson
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Paulett Taggart Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Dec 2025
41 permits since 2000 (architect on 38 permits, authorized agent-others on 3 permits, engineer on 1 permit): 32 completed, 3 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 20 Franklin St | D & H Construction | ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair.Details
ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair. | $30,000,000 |
| Sep 16, 2024 | In progress issued Nov 2024 | 476 Eddy St | D & H Construction | tenant improvement of the ground floor commercial space of the historic yosemite apartmentDetails
tenant improvement of the ground floor commercial space of the historic yosemite apartment | $185,000 |
| May 6, 2024 | In progress issued Feb 2026 | 555 07th St | modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco.Details
modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco. | $641,675 | |
| Sep 22, 2023 | Completed final sign-off Jun 2024 | 480 Eddy St | D & H Construction | revision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame.Details
revision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame. | $20,000 |
| Aug 30, 2023 | Completed final sign-off Jun 2024 | 78 Johnson St | Nibbi Bros Assoc Inc. | revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft.Details
revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft. | |
| Aug 17, 2023 | Completed final sign-off Jun 2024 | 480 Eddy St | D & H Construction | add 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1Details
add 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1 | $20,000 |
| Jul 21, 2023 | Completed final sign-off Dec 2023 | 55 Mason St | D & H Construction | revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished.Details
revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished. | |
| Mar 23, 2022 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459.Details
commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459. | |
| Oct 10, 2020 | Completed final sign-off Sep 2023 | 55 Mason St | D & H Construction | voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.Details
voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well. | $12,000,000 |
| Dec 19, 2019 | Completed final sign-off Jun 2024 | 480 Eddy St | D & H Construction | 100% affordable & priority process housing. the scope of work includes the renovation of 32 units of 100% affordable housing in a six story building, a voluntary seismic upgrade, mechanical, elect & plumb upgrades, and ground floor alterations for accessibility improvement will also be included.Details
100% affordable & priority process housing. the scope of work includes the renovation of 32 units of 100% affordable housing in a six story building, a voluntary seismic upgrade, mechanical, elect & plumb upgrades, and ground floor alterations for accessibility improvement will also be included. | $8,000,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2024 | 1 Avenue Of The Palms | Nibbi Bros Assoc Inc. | erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used buildingDetails
erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building | $60,000,000 |
| Jun 26, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area.Details
common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Jun 3, 2019 | Completed final sign-off May 2022 | 1049 Golden Gate Av | Nibbi Bros Assoc Inc. | at bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.Details
at bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. | $1,000,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 951 Eddy St | Guzman Construction Group Inc. | unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughoutDetails
unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout | $48,500 |
| Jul 11, 2018 | Never finaled issued Nov 2018, no final | 2451 Sacramento St | Nibbi Bros Assoc Inc. | improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a **Details
improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a ** | $25,000 |
| Mar 15, 2017 | Completed final sign-off May 2019 | 350 Ellis St | D & H Construction | revision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301.Details
revision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301. | $62,000 |
| Jan 10, 2017 | Completed final sign-off Oct 2019 | 350 Ellis St | Rcm Fire Protection Inc. | install underground fire service from the curb line on ellis st to the service yard for supply to a (n) sprinkler system at 350 ellis stDetails
install underground fire service from the curb line on ellis st to the service yard for supply to a (n) sprinkler system at 350 ellis st | $10,000 |
| Sep 15, 2016 | Expired or cancelled withdrawn May 2017 | 329 Lombard St | Pfautz Design And Construction | rear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape.Details
rear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape. | $250,000 |
| Sep 15, 2016 | Expired or cancelled withdrawn May 2017 | 325 Lombard St | Pfautz Design And Construction | front bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel.Details
front bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel. | $600,000 |
| Jan 25, 2016 | Never finaled issued Dec 2016, no final | 1 Zoo Rd | barrier removal: stepped area of primate center will be made accessible by providing a concrete infill ramp & platform along with new guardrails. n/a ordinance #155-13Details
barrier removal: stepped area of primate center will be made accessible by providing a concrete infill ramp & platform along with new guardrails. n/a ordinance #155-13 | $80,000 | |
| Nov 18, 2015 | Completed final sign-off May 2019 | 350 Ellis St | D & H Construction, Pac Integrations Inc | accessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement.Details
accessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement. | $21,000,000 |
| Sep 2, 2015 | Completed final sign-off Dec 2018 | 2451 Sacramento St | Nibbi Bros Assoc Inc. | rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades.Details
rad project. accessibility upgrades. ground floor addition, office/common area, lobby renovation, replacement of all storefront, elevator modernization, energy & envelope improvements, unit accessibility upgrades, casework, appliance, fixtures, finishes & lighting upgrades. | $11,000,000 |
| Mar 27, 2015 | Never finaled issued Nov 2015, no final | 1880 Pine St | Nibbi Bros Assoc Inc. | moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape,Details
moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape, | $7,936,478 |
| Oct 31, 2014 | Completed final sign-off Nov 2015 | 801 Arkansas St | this project consists of ada barrier removal f0r accessibility to a public toilet room at an existing public park facility. n/a maher ordinanceDetails
this project consists of ada barrier removal f0r accessibility to a public toilet room at an existing public park facility. n/a maher ordinance | $80,000 | |
| Oct 31, 2014 | Completed final sign-off Aug 2015 | 95 Justin Dr | this project consists of ada barrier removal for accessibility to the path of travel entramces + public toilet rooms of an existing public park facility. n/a maher ordinanceDetails
this project consists of ada barrier removal for accessibility to the path of travel entramces + public toilet rooms of an existing public park facility. n/a maher ordinance | $250,000 | |
| Oct 17, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | Cannon Constructors North Inc | modify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a.Details
modify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a. | $47,000 |
| Sep 5, 2014 | Completed final sign-off Nov 2015 | 109 Oak St | Roebuck Construction | revision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total.Details
revision to pa# 2013/04/04/3800. replace (e) apparatus bay doors with new apparatus bay doors. 3 total. | $180,000 |
| Jul 2, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | Cannon Constructors North Inc | t.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a.Details
t.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a. | $250,000 |
| Apr 11, 2014 | Completed final sign-off Dec 2014 | 543 Howard St | Cannon Constructors North Inc | 4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes.Details
4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes. | $400,000 |
| Apr 4, 2013 | Completed final sign-off Nov 2015 | 109 Oak St | Roebuck Construction | comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors.Details
comply w/ nov #200342136. interior renov & elevtr addition to (e) 1961 sf fire station. renov incl accessibility, mech, elecl & life safety upgrades as well as (n) finishes & enclosure systems incl windows, roofing & stucco repair & paint. pursuing leed gold for comm interiors. | $3,140,000 |
| Dec 15, 2008 | Completed final sign-off Apr 2009 | 667 Mission St | Browncoconstruction And Development Inc | new office room, remove existing partitions and dropped ceiling, new lights, power, data, modify existing hvac. mep seperate permitDetails
new office room, remove existing partitions and dropped ceiling, new lights, power, data, modify existing hvac. mep seperate permit | $30,000 |
| Jul 7, 2008 | Never finaled issued Jul 2008, no final | 155 Jackson St | Pankow Special Projects Lp | interior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for electDetails
interior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for elect | $179,100 |
| Apr 28, 2008 | Completed final sign-off Apr 2009 | 440 Davis St | interior re-finishes of (e) residential tower main lobby. no change in use, occupancy, occ load or egress. replace in kind new front entry doors, new floor covering and wall finishes. new plumbed fountain, relocate f.a. panel, new t-24 compliant lighting & exit signs, seperate permit for fire alarmDetails
interior re-finishes of (e) residential tower main lobby. no change in use, occupancy, occ load or egress. replace in kind new front entry doors, new floor covering and wall finishes. new plumbed fountain, relocate f.a. panel, new t-24 compliant lighting & exit signs, seperate permit for fire alarm | $439,200 | |
| Feb 6, 2008 | Completed final sign-off May 2009 | 550 Battery St | interior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel.Details
interior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel. | $210,000 | |
| Feb 4, 2008 | Completed final sign-off Sep 2008 | 528 Connecticut St | Workhorse Construction | remodel kitchen and bathroom, move several interior doors, relocate opening between kitchen and dinning rm. replace 4 windows in kind, 2 of the windows in front of bldg. some structural repairs at the garage level.Details
remodel kitchen and bathroom, move several interior doors, relocate opening between kitchen and dinning rm. replace 4 windows in kind, 2 of the windows in front of bldg. some structural repairs at the garage level. | $100,000 |
| Oct 31, 2005 | Completed final sign-off Apr 2006 | 500 Sansome St | Principal Builders Inc. | oti-1 7/f el me ls spDetails
oti-1 7/f el me ls sp | $200,000 |