Eric D. Reeder
- Listed as
- architect
- Based in
- Sf
- On San Francisco permits
- Oct 2015 to Jun 2026
13 permits since 2000 (architect on 13 permits): 8 completed, 2 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2026 | In progress issued Aug 2026 | 1726 47th Av | Yellow Zone Construction | replace entry stair riser and landing (less than 50%) at frount of house. replace front cement stucco on street facade. all work in kind.Details
replace entry stair riser and landing (less than 50%) at frount of house. replace front cement stucco on street facade. all work in kind. | $30,000 |
| May 1, 2026 | In progress issued May 2026 | 60 Stonecrest Dr | Gbi Construction Llc | removal of interior wall between kitchen & dining roomDetails
removal of interior wall between kitchen & dining room | $2,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 555 California St | Premier Structures Inc | concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service.Details
concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service. | $350,000 |
| Aug 28, 2023 | Never finaled filed Aug 2023, never issued | 185 Berry St | ste 1400: renovation of (e) tenant space previous occupant was restaurant, the new occupant will be food service restaurant. new plumbing, sinks and electrical. provide required services, new floors, relocated walls and wall improvements.Details
ste 1400: renovation of (e) tenant space previous occupant was restaurant, the new occupant will be food service restaurant. new plumbing, sinks and electrical. provide required services, new floors, relocated walls and wall improvements. | $600,000 | |
| Feb 10, 2023 | Completed final sign-off Apr 2024 | 1416 44th Av | Bayside Remodeling & Construction | revision to pa# 202210204757 for rear structural change at exterior facade wall, supplemental framing and door location. all other interior adjustments remain in garage space.Details
revision to pa# 202210204757 for rear structural change at exterior facade wall, supplemental framing and door location. all other interior adjustments remain in garage space. | |
| Oct 20, 2022 | Completed final sign-off Apr 2024 | 1416 44th Av | Bayside Remodeling & Construction | renovattion work rear portion of (e) 1st fl. garage to be enclosed for downstairs living space, renovation to include revewed bedroom and bathr upgrades, new french door to rear yard modifing rear facadeDetails
renovattion work rear portion of (e) 1st fl. garage to be enclosed for downstairs living space, renovation to include revewed bedroom and bathr upgrades, new french door to rear yard modifing rear facade | $45,000 |
| Jan 19, 2021 | Completed final sign-off Oct 2022 | 1366 40th Av | Excelsior Building Group | new kitchen and baths at 2/f. new bathroom and living space at 1/f. new exterior rear windows.Details
new kitchen and baths at 2/f. new bathroom and living space at 1/f. new exterior rear windows. | $195,000 |
| Feb 15, 2019 | Never finaled issued May 2019, no final | 818 York St | Bay Building Structures Inc | interior renovation of basement and first floor with (e) three story, three dwelling unit structure. renovate kitchen, bathroom at basement and first floor. basement will include new layout of rooms and enlarged unit area. (n) exterior windows and door.Details
interior renovation of basement and first floor with (e) three story, three dwelling unit structure. renovate kitchen, bathroom at basement and first floor. basement will include new layout of rooms and enlarged unit area. (n) exterior windows and door. | $125,000 |
| May 4, 2018 | Completed final sign-off Mar 2022 | 55 Gates St | Bay Building Structures Inc | interior remodel of (e) 2-story single family res. remodel of kitchen & bathroom @ 2nd flr & new 3rd story add. street facing facade will include (n) windows @ 2nd & 3rd flrs (@rear also.) all exterior facades to be refinished. new green roofs & deck to be incorporated @ front of house & upper roof.Details
interior remodel of (e) 2-story single family res. remodel of kitchen & bathroom @ 2nd flr & new 3rd story add. street facing facade will include (n) windows @ 2nd & 3rd flrs (@rear also.) all exterior facades to be refinished. new green roofs & deck to be incorporated @ front of house & upper roof. | $250,000 |
| Jun 28, 2017 | Never finaled issued Jul 2017, no final | 290 Rutledge St | Stapleton Construction Dba Revival Const | interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths.Details
interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths. | $100,000 |
| Mar 10, 2016 | Completed final sign-off Dec 2017 | 1490 Guerrero St | Post & Lintel Construction | revision to appl #201510159840 - structural columns in garage are being relocated. laundry & utility area is being adjusted in the garage. adjustment to entry foyer from garage . adjustments to stair config.Details
revision to appl #201510159840 - structural columns in garage are being relocated. laundry & utility area is being adjusted in the garage. adjustment to entry foyer from garage . adjustments to stair config. | |
| Nov 10, 2015 | Completed final sign-off Nov 2017 | 1492 Guerrero St | Post & Lintel Construction | interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facadeDetails
interior remodel to include new kitchen, new bathrooms and refurbish of (e) finishes throughout residence. new deck proposed within (e) building envelope at level 2 and atic level. the front elevation to remain intact & repaired in kind. rear facade upgrade will remove (e) stair and resurface facade | $125,000 |
| Oct 15, 2015 | Completed final sign-off Nov 2017 | 1490 Guerrero St | Post & Lintel Construction | addition of ground level living space in place of garage storage. this new space will incldue relocated ktichen & new bath. the 2nd story will include new bedrooms & new bath. interior finishes at 2nd floor to be refurbished. work permit only for 1490 guerrero st (lower unit).Details
addition of ground level living space in place of garage storage. this new space will incldue relocated ktichen & new bath. the 2nd story will include new bedrooms & new bath. interior finishes at 2nd floor to be refurbished. work permit only for 1490 guerrero st (lower unit). | $200,000 |