Dutch Wickes

License
29461
State contractor license record
Listed as
architect
On San Francisco permits
Jun 2022 to Mar 2024

3 permits since 2000 (architect on 3 permits): 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 22, 2024Completed
final sign-off Apr 2024
665 03rd StTeam Commercial Construction Inc.revision pa# 202206247101 existing hvac system and all associated support to remain and in operation
Details
Permit
202403228399
Status
complete
Filed
Mar 22, 2024
Permit issued
Mar 22, 2024
Final sign-off
Apr 3, 2024
Address
665 03rd St

revision pa# 202206247101 existing hvac system and all associated support to remain and in operation

Open the permit page

Jan 12, 2024Completed
final sign-off Jan 2024
665 03rd StTeam Commercial Construction Inc.revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.
Details
Permit
202401123916
Status
complete
Filed
Jan 12, 2024
Permit issued
Jan 12, 2024
Final sign-off
Jan 17, 2024
Address
665 03rd St

revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.

Open the permit page

Jun 24, 2022Completed
final sign-off Apr 2024
665 03rd StTeam Commercial Construction Inc.complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.
Details
Permit
202206247101
Status
complete
Filed
Jun 24, 2022
Permit issued
Jun 5, 2023
Final sign-off
Apr 3, 2024
Declared cost
$550,000
Address
665 03rd St

complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.

Open the permit page

$550,000