Deji Liu
- Listed as
- authorized agent-others, contractor
- Firm
- Dliu Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Jul 2026
121 permits since 2000 (contractor on 121 permits, authorized agent-others on 2 permits): 91 completed, 4 in progress, 18 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2026 | Completed final sign-off Aug 2026 | 421 27th St | Dliu Construction | to obtain final inspection for work approved under pa#: 202002255371. all work is complete.Details
to obtain final inspection for work approved under pa#: 202002255371. all work is complete. | |
| Feb 5, 2026 | Completed final sign-off Feb 2026 | 535 28th Av | Dliu Construction | replace wood siding to hardy panel siding at the back of buildingDetails
replace wood siding to hardy panel siding at the back of building | $15,000 |
| Jan 20, 2026 | Expired or cancelled cancelled Mar 2026 | 535 28th Av | Dliu Construction | repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof.Details
repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof. | $20,000 |
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 535 28th Av | Dliu Construction | add siding that is not street facing on blind wall. adj to 531 28th ave in light wellDetails
add siding that is not street facing on blind wall. adj to 531 28th ave in light well | $10,000 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 765 34th Av | Dliu Construction, Sonoma Build Group Inc | front stair replacement like to likeDetails
front stair replacement like to like | $5,000 |
| Sep 3, 2025 | In progress filed Sep 2025, not yet issued | 370 Parnassus Av | Dliu Construction | revision to pa 2014-1204-2987. remove one door on the 1st fl, one window on the 2nd fl and remove electrical room on 1st fl because the electrical meters arc now on the face of the bldg per pg&e.Details
revision to pa 2014-1204-2987. remove one door on the 1st fl, one window on the 2nd fl and remove electrical room on 1st fl because the electrical meters arc now on the face of the bldg per pg&e. | |
| Aug 26, 2025 | Completed final sign-off Feb 2026 | 3095 24th Av | Dliu Construction | 5/8" type x sheetrock at existing garage interior sides and ceiling.Details
5/8" type x sheetrock at existing garage interior sides and ceiling. | $4,000 |
| Jul 28, 2025 | Completed final sign-off Nov 2025 | 405 Teresita Bl | Dliu Construction | sheetrock install in garage. 5/8" type x.Details
sheetrock install in garage. 5/8" type x. | $3,000 |
| Jun 5, 2025 | In progress issued Jun 2025 | 3095 24th Av | Dliu Construction | remodel all 5 full bathrooms at (e) location. chagne flooring and paint whole house.Details
remodel all 5 full bathrooms at (e) location. chagne flooring and paint whole house. | $60,000 |
| May 19, 2025 | Completed final sign-off Nov 2025 | 405 Teresita Bl | Dliu Construction | to comply with nov 202430666 - repair interior fire damage in kind at ground floor rear rooms and water damage in basement. replace street facing front door.Details
to comply with nov 202430666 - repair interior fire damage in kind at ground floor rear rooms and water damage in basement. replace street facing front door. | $100,000 |
| Dec 19, 2024 | Completed final sign-off Feb 2025 | 1534 11th Av | Dliu Construction | remodel existing kitchen same layoutDetails
remodel existing kitchen same layout | $12,000 |
| Nov 15, 2024 | Completed final sign-off May 2026 | 765 34th Av | Dliu Construction | complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear.Details
complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear. | $200,000 |
| Sep 26, 2024 | In progress issued Nov 2024 | 370 Parnassus Av | Dliu Construction | mep submittal for pa # 2014-1204-2987 & 2019-0625-4346 electrical & mechanical for 2nd fl "b" occupancy. plumbing for entire buildingDetails
mep submittal for pa # 2014-1204-2987 & 2019-0625-4346 electrical & mechanical for 2nd fl "b" occupancy. plumbing for entire building | |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 1400 Geneva Av | Dliu Construction | to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind.Details
to comply w/ nov# 202424621: replace (e) stair with new stair in kind. repair in kind. | $40,000 |
| May 31, 2024 | Completed final sign-off Jan 2025 | 12 Neptune St | Dliu Construction | to comply w/ complaint# 202423669 & 202423323. construct new concrete footing along property line and repair (e) exterior siding above new concrete footing.Details
to comply w/ complaint# 202423669 & 202423323. construct new concrete footing along property line and repair (e) exterior siding above new concrete footing. | $30,000 |
| May 13, 2024 | Completed final sign-off Feb 2025 | 254 Beverly St | Dliu Construction | 2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plansDetails
2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plans | $150,000 |
| Feb 5, 2024 | In progress issued Feb 2024 | 370 Parnassus Av | Dliu Construction | revision to permit app # 2014-1204-2987 & 2023-0125-0713. to revise location of piers within the car pit.Details
revision to permit app # 2014-1204-2987 & 2023-0125-0713. to revise location of piers within the car pit. | |
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 534 37th Av | Dliu Construction | to obtain final inspection for work approved under 201810011879, 2019014178205, 201905201139. all work is complete.Details
to obtain final inspection for work approved under 201810011879, 2019014178205, 201905201139. all work is complete. | |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 135 Corona St | Dliu Construction | minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelopeDetails
minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelope | $78,000 |
| Aug 17, 2023 | Completed final sign-off Mar 2024 | 621 42nd Av | Dliu Construction | repair and replace south face stucco under 1000 sf (not facing street)Details
repair and replace south face stucco under 1000 sf (not facing street) | $8,000 |
| Aug 16, 2023 | Expired or cancelled expired Dec 2025 | 1100 Holloway Av | Dliu Construction, Bejarano Construction 9inc | adding g/f as adu per state govt code 65852.2a-d at (e) ground floor habitable space to include 3 bedroom, 3 baths with sep entrance and full kitchen with added bedroom egress windows to (e) for new adu per plans. convert (e) work under pa202306139938 & 202305127691.Details
adding g/f as adu per state govt code 65852.2a-d at (e) ground floor habitable space to include 3 bedroom, 3 baths with sep entrance and full kitchen with added bedroom egress windows to (e) for new adu per plans. convert (e) work under pa202306139938 & 202305127691. | $15,000 |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 439 Cortland Av | Dliu Construction | add (2) exterior windows @ side of building. at street sideDetails
add (2) exterior windows @ side of building. at street side | $5,000 |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 691 Madrid St | Dliu Construction | replace (8 x 4' and 3' x 3.5') 5 single hung (2) 3' x 6' and (1) 3' x 3.5'. material to be wood alum clad. replace with hung windows - no sliders. replacement in kind. upper wood horizontal siding replacement in kind w/ 6" boards.Details
replace (8 x 4' and 3' x 3.5') 5 single hung (2) 3' x 6' and (1) 3' x 3.5'. material to be wood alum clad. replace with hung windows - no sliders. replacement in kind. upper wood horizontal siding replacement in kind w/ 6" boards. | $3,000 |
| Jul 21, 2023 | Completed final sign-off May 2024 | 411 28th Av | Dliu Construction | to comply with nov 202310290. remove existing post with new post on the 1/f (g/f)Details
to comply with nov 202310290. remove existing post with new post on the 1/f (g/f) | $8,000 |
| Jun 20, 2023 | Completed final sign-off Feb 2024 | 1170 Prague St | Dliu Construction | remodel (e) kitchen. update electrical wire whole house. replace in kind, no structural work/demo.Details
remodel (e) kitchen. update electrical wire whole house. replace in kind, no structural work/demo. | $10,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2025 | 1100 Holloway Av | Dliu Construction, Kangrong Construction Corporation, Bejarano Construction 9inc | revision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor.Details
revision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor. | $80,000 |
| May 30, 2023 | Never finaled issued May 2023, no final | 439 Cortland Av | Dliu Construction | replace missing bottom wood siding to north wall and west wall matching adjacent in kind, repair waterproofing paper.Details
replace missing bottom wood siding to north wall and west wall matching adjacent in kind, repair waterproofing paper. | $2,000 |
| May 19, 2023 | Never finaled issued Jul 2023, no final | 370 Parnassus Av | Dliu Construction | vertical shoring of (e) building in order to provide a new foundation for pa 201412042987.Details
vertical shoring of (e) building in order to provide a new foundation for pa 201412042987. | $5,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 691 Madrid St | Dliu Construction | minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawinDetails
minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawin | $250,000 |
| May 12, 2023 | Completed final sign-off Mar 2024 | 534 37th Av | Dliu Construction | recommencement of 201802050394 to complete work and obtain final inspectionDetails
recommencement of 201802050394 to complete work and obtain final inspection | $3,000 |
| May 12, 2023 | Completed final sign-off Nov 2025 | 1100 Holloway Av | Dliu Construction, Kangrong Construction Corporation, Bejarano Construction 9inc | comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100Details
comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100 | $150,000 |
| Jan 25, 2023 | Never finaled issued Jul 2023, no final | 370 Parnassus Av | Dliu Construction | 2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas metersDetails
2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas meters | |
| Dec 1, 2022 | Completed final sign-off May 2024 | 2470 23rd Av | Dliu Construction, Ripplewood Holding | 1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fireDetails
1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fire | $225,000 |
| Sep 16, 2022 | Completed final sign-off Jan 2023 | 35 Reposa Wy | Dliu Construction | remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights,Details
remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights, | $85,000 |
| Aug 1, 2022 | Completed final sign-off Oct 2024 | 421 Walnut St | Dliu Construction | rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions.Details
rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions. | $2,800 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2552 24th Av | Dliu Construction | interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans,Details
interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans, | $150,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2022 | 549 Monterey Bl | Dliu Construction | remodel extg bathroom, not move any wall at 1st floor.Details
remodel extg bathroom, not move any wall at 1st floor. | $10,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 217 Juanita Wy | Dliu Construction | remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan.Details
remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan. | $150,000 |
| Apr 26, 2022 | Completed final sign-off Aug 2023 | 48 Sanchez St | Dliu Construction | interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting.Details
interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting. | $60,000 |
| Apr 11, 2022 | Completed final sign-off May 2022 | 2840 Clement St | Dliu Construction | repair garage door and small portion of stucco. comply with violation number 202289357.Details
repair garage door and small portion of stucco. comply with violation number 202289357. | $4,000 |
| Feb 25, 2022 | Never finaled issued Mar 2022, no final | 370 Parnassus Av | Dliu Construction | revision to pa#201412042987 / 201906254346. change 120 sq ft of residential (r-2) use to medical office (b) useDetails
revision to pa#201412042987 / 201906254346. change 120 sq ft of residential (r-2) use to medical office (b) use | |
| Feb 10, 2022 | Completed final sign-off Jun 2022 | 236 Bridgeview Dr | Dliu Construction | change front tile and brick wall to stucco.Details
change front tile and brick wall to stucco. | $8,000 |
| Jan 26, 2022 | Completed final sign-off Jun 2023 | 1634 39th Av | Dliu Construction | 1st fl: add 2 bedrooms, a media room, 2 full baths, & remodel foyer area. 2nd fl: remodel bathroom, kitchen, add a full bath, add a rear deck.Details
1st fl: add 2 bedrooms, a media room, 2 full baths, & remodel foyer area. 2nd fl: remodel bathroom, kitchen, add a full bath, add a rear deck. | $110,000 |
| Dec 27, 2021 | Completed final sign-off Aug 2022 | 2966 26th Av | Dliu Construction | revision to 202110059863. structural revision. add (n) beam @ ground floor per plan. add insulation throughout house. add recess lights & outlet.Details
revision to 202110059863. structural revision. add (n) beam @ ground floor per plan. add insulation throughout house. add recess lights & outlet. | $10,000 |
| Dec 22, 2021 | Completed final sign-off Feb 2023 | 494 20th Av | Dliu Construction | rev pa201912300872. 1/f: add a hallway, add a tub to bathroom. relocate washer/dryer to 2/f. 2/f: revise kitchen and dining area plan; 3/f: revise bathroom and bedroom plans.Details
rev pa201912300872. 1/f: add a hallway, add a tub to bathroom. relocate washer/dryer to 2/f. 2/f: revise kitchen and dining area plan; 3/f: revise bathroom and bedroom plans. | $10,000 |
| Nov 23, 2021 | Completed final sign-off Mar 2022 | 549 Monterey Bl | Dliu Construction | replace front windows with alum-clad wood windows in-kind per plans.new stucco to replace (e) vertical wood siding.Details
replace front windows with alum-clad wood windows in-kind per plans.new stucco to replace (e) vertical wood siding. | $5,000 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 549 Monterey Bl | Dliu Construction | kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof.Details
kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof. | $125,000 |
| Nov 4, 2021 | Completed final sign-off Feb 2024 | 439 Cortland Av | Dliu Construction | replace existing slab, footing and retaining walls with new concrete footing, slab and retaining walls. add simposon strong wall in the front of the buildingDetails
replace existing slab, footing and retaining walls with new concrete footing, slab and retaining walls. add simposon strong wall in the front of the building | $80,000 |
| Oct 5, 2021 | Completed final sign-off Aug 2022 | 2966 26th Av | Dliu Construction | remodel gr fl 2nd bath to full bath, add 1 full bath at gr fl, remodel 2nd fl bath to 2 full bathDetails
remodel gr fl 2nd bath to full bath, add 1 full bath at gr fl, remodel 2nd fl bath to 2 full bath | $25,000 |
| Sep 14, 2021 | Completed final sign-off Mar 2022 | 1554 20th Av | Dliu Construction | revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left.Details
revision 202102054161. eliminate new residential unit at 1st fl. open wall for stair connection between 2 floors. infill windows and pour and install new windows in new bedroom 5 on 1st fl. revision to 202010076118 to revise window size on rear left. | |
| Jun 8, 2021 | Completed final sign-off Aug 2021 | 714 18th Av | Dliu Construction | remodel (1) kitchen, change flooring non-structural work. no walls modified or layout changes.Details
remodel (1) kitchen, change flooring non-structural work. no walls modified or layout changes. | $20,000 |
| Oct 3, 2020 | Completed final sign-off Dec 2021 | 551 Monterey Bl | Dliu Construction, Luzon Construction Mgmt | to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of buildingDetails
to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of building | $1,000 |
| Jul 15, 2020 | Completed final sign-off Nov 2021 | 120 Cresta Vista Dr | Dliu Construction | remove partitions. update kitchen, cabinets/layout. new habitalbe room in garage. replace forced bed air-new deck railing.Details
remove partitions. update kitchen, cabinets/layout. new habitalbe room in garage. replace forced bed air-new deck railing. | $120,000 |
| Jul 1, 2020 | Completed final sign-off Mar 2024 | 439 Cortland Av | Dliu Construction | convert existing retail space to food service. 20 seats for customer dine in. work scope for new 25' commerical hood, plumbing, and electrical. wet bar for soft drink. gas hood up.Details
convert existing retail space to food service. 20 seats for customer dine in. work scope for new 25' commerical hood, plumbing, and electrical. wet bar for soft drink. gas hood up. | $150,000 |
| May 27, 2020 | Never finaled issued Jun 2020, no final | 462 Athens St | Dliu Construction | re-frame the roof area in the light well and re-roof to repair dry rot comply with complaint number nov # 202030325. all repair work in-kind.Details
re-frame the roof area in the light well and re-roof to repair dry rot comply with complaint number nov # 202030325. all repair work in-kind. | $2,000 |
| Feb 25, 2020 | Expired or cancelled expired Apr 2026 | 421 27th St | Dliu Construction | interior remodel of 1st & 2nd floors. adding 2 bedrooms & bathroom on ground flDetails
interior remodel of 1st & 2nd floors. adding 2 bedrooms & bathroom on ground fl | $25,000 |
| Nov 19, 2019 | Never finaled issued Sep 2020, no final | 831 Greenwich St | Dliu Construction | convert closet space to a full bathroom in fourth floor.Details
convert closet space to a full bathroom in fourth floor. | $12,000 |
| Sep 27, 2019 | Completed final sign-off Dec 2020 | 942 Fell St | Dliu Construction | to obtain final inspection for work approved under pa# 201704133898. all work is completeDetails
to obtain final inspection for work approved under pa# 201704133898. all work is complete | |
| Sep 26, 2019 | Completed final sign-off Oct 2021 | 80 Forest View Dr | Dliu Construction | residential interior remodel of single family residence. ground floor remodel of garage space for total of 1 bed, 1 media room & 1 1/2 bath. remodel of 2nd floor and 3rd fl, per plansDetails
residential interior remodel of single family residence. ground floor remodel of garage space for total of 1 bed, 1 media room & 1 1/2 bath. remodel of 2nd floor and 3rd fl, per plans | $200,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 125 09th Av | Dliu Construction | replace 4 wood casement windows with new aluminum clad wood casement windows in same openings. replace 10 wood double hung windows at front with new aluminum clad double hung windows in same openings.Details
replace 4 wood casement windows with new aluminum clad wood casement windows in same openings. replace 10 wood double hung windows at front with new aluminum clad double hung windows in same openings. | $2,000 |
| May 23, 2019 | Completed final sign-off Sep 2020 | 2070 Green St | Dliu Construction | revision to 201901109995 reconfigure roof deck. new hot tub, bbq and fire pit, new chimney. reconfigure basement, 2nd and 3rd flr layouts. replace windows at front, in-kind, w/ aluminum clad wood windowsDetails
revision to 201901109995 reconfigure roof deck. new hot tub, bbq and fire pit, new chimney. reconfigure basement, 2nd and 3rd flr layouts. replace windows at front, in-kind, w/ aluminum clad wood windows | $10,000 |
| May 20, 2019 | Expired or cancelled expired Feb 2024 | 534 37th Av | Dliu Construction | revision to app#201802050394. add a low wall at living/dining area.Details
revision to app#201802050394. add a low wall at living/dining area. | $500 |
| Apr 17, 2019 | Expired or cancelled expired Feb 2024 | 534 37th Av | Dliu Construction | revision to pa 2018-0205-0394 to add a bedroom in approved adu spaceDetails
revision to pa 2018-0205-0394 to add a bedroom in approved adu space | $3,000 |
| Mar 27, 2019 | Completed final sign-off Dec 2021 | 551 Monterey Bl | Dliu Construction | provide handrails for rear stairway to comply with nov 201920821Details
provide handrails for rear stairway to comply with nov 201920821 | $4,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 938 Ingerson Av | Dliu Construction | comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl;Details
comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl; | $158,000 |
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 858 31st Av | Dliu Construction | new doors & decorative trim to facade. replace (e) stone tile with stuccoDetails
new doors & decorative trim to facade. replace (e) stone tile with stucco | $5,000 |
| Jan 7, 2019 | Completed final sign-off Feb 2019 | 2 Italy Av | Dliu Construction | renewal of permit 201709016695Details
renewal of permit 201709016695 | |
| Dec 6, 2018 | Never finaled issued Dec 2018, no final | 2070 Green St | Dliu Construction | revise structural foundation design per previous approved permit 2018-0816-7549 per new structural drawingsDetails
revise structural foundation design per previous approved permit 2018-0816-7549 per new structural drawings | |
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 2070 Green St | Dliu Construction | revision t0 pa 201808167549. revise window sizes at rear. basement & 2nd flr - reconfigure bathroom layoutDetails
revision t0 pa 201808167549. revise window sizes at rear. basement & 2nd flr - reconfigure bathroom layout | $10,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2022 | 651 24th Av | Dliu Construction | horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116.Details
horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116. | $44,156 |
| Oct 10, 2018 | Completed final sign-off Apr 2021 | 2146 Union St | Stronghold Builders Inc, Dliu Construction | revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s.Details
revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s. | |
| Oct 1, 2018 | Expired or cancelled expired Feb 2024 | 534 37th Av | Dliu Construction | voluntary structural upgrade in 1st floorDetails
voluntary structural upgrade in 1st floor | $3,000 |
| Sep 19, 2018 | Completed final sign-off Feb 2020 | 431 Moscow St | Dliu Construction | revision of pa201805240083 to correct (e) substandar framing at (e) wall & ceiling joist. (e) wall are 4ft o/c & celing joists are 32in o/c. adhere to stard 16in o/c framing with same size framing materials.Details
revision of pa201805240083 to correct (e) substandar framing at (e) wall & ceiling joist. (e) wall are 4ft o/c & celing joists are 32in o/c. adhere to stard 16in o/c framing with same size framing materials. | $10,000 |
| Sep 12, 2018 | Never finaled issued Sep 2018, no final | 858 31st Av | Dliu Construction | at front façade, replace lower windows (wood) and upper windows (vinyl) with milgard essence fiberglass-clad windows. at 2nd story, middle three windows to be fixed, outer two to be casement. upper decorative wood windows to be refurbished. at 3rd floor, upper sashes to have simulated divide lights.Details
at front façade, replace lower windows (wood) and upper windows (vinyl) with milgard essence fiberglass-clad windows. at 2nd story, middle three windows to be fixed, outer two to be casement. upper decorative wood windows to be refurbished. at 3rd floor, upper sashes to have simulated divide lights. | $2,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 234 Montana St | Dliu Construction | minor structural revision to previously approved permit pa#201808066506, see structural plansDetails
minor structural revision to previously approved permit pa#201808066506, see structural plans | |
| Aug 28, 2018 | Completed final sign-off Apr 2019 | 1223 Hollister Av | Dliu Construction | add new adu in 1st floor with 2 bedrooms, 2 full baths, a kitchen, a living room & dining room per ord# 95-17. in 2nd foolr: convert dining room to a bedroom with a full bath.Details
add new adu in 1st floor with 2 bedrooms, 2 full baths, a kitchen, a living room & dining room per ord# 95-17. in 2nd foolr: convert dining room to a bedroom with a full bath. | $58,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2020 | 4038 Cesar Chavez St | Dliu Construction | in basement convert storage space into living space . on 1st and 2nd fl. remodel kitchen, bedrooms, bathrooms and remodel roof deck add front light well, front windows, add 3 skylights and replacing side and rear windows, not visible from public view.Details
in basement convert storage space into living space . on 1st and 2nd fl. remodel kitchen, bedrooms, bathrooms and remodel roof deck add front light well, front windows, add 3 skylights and replacing side and rear windows, not visible from public view. | $120,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2020 | 2070 Green St | Dliu Construction | basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies.Details
basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies. | $200,000 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 234 Montana St | Dliu Construction | remodel (e) kitchen & bathroom on (e) 2nd fl. add one bathroom and skylights on (e) 2nd fl plan. rear window replacement at rear. all work limited to within interior of building.Details
remodel (e) kitchen & bathroom on (e) 2nd fl. add one bathroom and skylights on (e) 2nd fl plan. rear window replacement at rear. all work limited to within interior of building. | $80,000 |
| Aug 2, 2018 | Completed final sign-off Jul 2019 | 234 Montana St | Dliu Construction | remodel at ground floor of extg 2 story structure to accomdate additional habitable space. new 1 bedroom on ground and relocate bathroom for total of 2 bedroom and 1 bathroom. replace one rear window for bedroom.Details
remodel at ground floor of extg 2 story structure to accomdate additional habitable space. new 1 bedroom on ground and relocate bathroom for total of 2 bedroom and 1 bathroom. replace one rear window for bedroom. | $30,000 |
| Jun 27, 2018 | Completed final sign-off Oct 2019 | 123 09th Av | Dliu Construction | 1st fl: infill lightwell on south. reconfigure bath. 2nd & 3rd floor: modify south lightwell. enlarge bathroom and den.Details
1st fl: infill lightwell on south. reconfigure bath. 2nd & 3rd floor: modify south lightwell. enlarge bathroom and den. | $5,000 |
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 234 Montana St | Dliu Construction | demo e garage slab and replace with new slab. under new slab will have 6 mil vapor barrier. mesh wire throughout 4" thick concrete. total under 300 sq ftDetails
demo e garage slab and replace with new slab. under new slab will have 6 mil vapor barrier. mesh wire throughout 4" thick concrete. total under 300 sq ft | $500 |
| Jun 7, 2018 | Completed final sign-off Jun 2019 | 750 Lyon St | Dliu Construction | 2nd flr - remodel rear deck 3rd flr - add a roof deck and 2 dormersDetails
2nd flr - remodel rear deck 3rd flr - add a roof deck and 2 dormers | $20,000 |
| May 24, 2018 | Completed final sign-off Feb 2020 | 431 Moscow St | Dliu Construction | add two bedrooms & one bathroom at (e) ground floor. remodel (e) kitchen & bathroom at the 2nd fl. demo (e) deck & build new deck.Details
add two bedrooms & one bathroom at (e) ground floor. remodel (e) kitchen & bathroom at the 2nd fl. demo (e) deck & build new deck. | $95,000 |
| May 21, 2018 | Completed final sign-off Apr 2019 | 858 31st Av | Dliu Construction | revision of permit #201804136288, remove plaster for 2nd & 3rd fl, ad insulation and replace windows. ref complaint #201864762. replacemeny gyboard must be 5/8" type x 5d cooler nails at 4inches on center or equivalent screws.Details
revision of permit #201804136288, remove plaster for 2nd & 3rd fl, ad insulation and replace windows. ref complaint #201864762. replacemeny gyboard must be 5/8" type x 5d cooler nails at 4inches on center or equivalent screws. | $15,000 |
| May 9, 2018 | Completed final sign-off Apr 2019 | 11 Winter Pl | Dliu Construction, United Painting & Const | for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor planDetails
for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor plan | $4,000 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 39 West View Av | Dliu Construction | revision under pa 2018-0112-8497 add media room at ground floorDetails
revision under pa 2018-0112-8497 add media room at ground floor | $2,000 |
| May 2, 2018 | Expired or cancelled expired May 2019 | 1001 Portola Dr | Dliu Construction | to comply with nov 201858863 repair existing front stair in kind. keep exterior finishes in kind, shape in kind.Details
to comply with nov 201858863 repair existing front stair in kind. keep exterior finishes in kind, shape in kind. | $8,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 1174 Alabama St | Dliu Construction | new bathroom and walkthrough closet maher naDetails
new bathroom and walkthrough closet maher na | $20,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 842 Lyon St | Dliu Construction | 1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler.Details
1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler. | $160,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 858 31st Av | Dliu Construction | 2nd flr - remodel kitchen, remove bathroom, add a powder room and wetbar. 3rd flr. remodel bathroom, add master bathroom.Details
2nd flr - remodel kitchen, remove bathroom, add a powder room and wetbar. 3rd flr. remodel bathroom, add master bathroom. | $38,000 |
| Apr 10, 2018 | Completed final sign-off Aug 2018 | 228 Liberty St | Dliu Construction, Jeremy Moore Construction | modify extg permit #201802060495 . replace inkind stair tower. extg permit is repair less than 50%. this permit is replace in kind.Details
modify extg permit #201802060495 . replace inkind stair tower. extg permit is repair less than 50%. this permit is replace in kind. | $10,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 123 09th Av | Dliu Construction, 328 Construction | 1st fl: total remodel, add family room & laundry. 2nd fl: total remodel, add 1 bath & den. 3rd fl: total reomdel, add 1 bath, 1 den & laundry. new roof deck. provide nfpa 13d sprinkler systems under on seperate permit.Details
1st fl: total remodel, add family room & laundry. 2nd fl: total remodel, add 1 bath & den. 3rd fl: total reomdel, add 1 bath, 1 den & laundry. new roof deck. provide nfpa 13d sprinkler systems under on seperate permit. | $120,000 |
| Mar 20, 2018 | Completed final sign-off Jun 2019 | 750 Lyon St | Dliu Construction | 1st fl - add a family room, a bedroom, a media room, an exercise room, a full bath, upgrade footing and slab; 2nd fl - remodel kitchen and bathrooms; 3rd fl - add 2 full bathroomsDetails
1st fl - add a family room, a bedroom, a media room, an exercise room, a full bath, upgrade footing and slab; 2nd fl - remodel kitchen and bathrooms; 3rd fl - add 2 full bathrooms | $80,000 |
| Feb 5, 2018 | Expired or cancelled expired Mar 2024 | 534 37th Av | Dliu Construction | add unit per ord 162-16. 1st flr: convert (e) storage room to be a new adu per ord #162-16.Details
add unit per ord 162-16. 1st flr: convert (e) storage room to be a new adu per ord #162-16. | $25,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2018 | 8 Arco Wy | Dliu Construction | 2nd floor: add new full bath, new 2x2 skylight in full bath, new half bath, remodel extg closet and kitchen. 1st floor: add 2 nw bedrooms , 2 nw full baths and family room. n/a for maherDetails
2nd floor: add new full bath, new 2x2 skylight in full bath, new half bath, remodel extg closet and kitchen. 1st floor: add 2 nw bedrooms , 2 nw full baths and family room. n/a for maher | $35,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2019 | 1643 Jerrold Av | Dliu Construction | minor improvement of g/f commisary kitchen. work include: replace 1 (e) type 1 hood, addition of 1 (n) type 1 hood over (n) cookline, (n) kitchen equipment at (n) cookline and (n) walk-in freezer. exterior improvement is (n) painting at front facade. separate permit for exterior signage.Details
minor improvement of g/f commisary kitchen. work include: replace 1 (e) type 1 hood, addition of 1 (n) type 1 hood over (n) cookline, (n) kitchen equipment at (n) cookline and (n) walk-in freezer. exterior improvement is (n) painting at front facade. separate permit for exterior signage. | $120,000 |
| Jan 12, 2018 | Completed final sign-off Jun 2018 | 39 West View Av | Dliu Construction | relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not reqDetails
relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not req | $56,000 |
| Dec 28, 2017 | Completed final sign-off Oct 2018 | 1490 Ocean Av | Dliu Construction | ti - install 2 uni-sex toilets, seven music teaching rooms. maher naDetails
ti - install 2 uni-sex toilets, seven music teaching rooms. maher na | $70,000 |
| Dec 7, 2017 | Completed final sign-off May 2018 | 255 Ralston St | Dliu Construction | 1st fl - add bedroom, family room, 2 full bathrooms and exsercise area; 2nd fl - remodel kitchen, bathroom, add full bathroom and new rear deckDetails
1st fl - add bedroom, family room, 2 full bathrooms and exsercise area; 2nd fl - remodel kitchen, bathroom, add full bathroom and new rear deck | $89,000 |