Stronghold Builders Inc
- Based in
- Vallejo
- On San Francisco permits
- Apr 2017 to Nov 2021
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2021 | Completed final sign-off Jan 2022 | 215 Noe St | repair wood e stairs on the side of the building <50% and repair roofing.Details
repair wood e stairs on the side of the building <50% and repair roofing. | $10,000 |
| Sep 8, 2021 | Completed final sign-off Oct 2021 | 3747 Jackson St | revision to bpa #201704144072. installation of window seats at windows a.0.1 (2 instances) to comply wiwth section cbc section 1030.Details
revision to bpa #201704144072. installation of window seats at windows a.0.1 (2 instances) to comply wiwth section cbc section 1030. | $8,000 |
| Mar 11, 2020 | Expired or cancelled withdrawn Dec 2020 | 2525 16th St | building alterations to comply with accessible buiness entrance program per ordinance 51-16.Details
building alterations to comply with accessible buiness entrance program per ordinance 51-16. | $20,000 |
| Feb 19, 2020 | Completed final sign-off Feb 2021 | 350 Beach St | ground floor interior demo under pa 2019-1113-7137. change of use from restaurant to office. new office in back. new outlets in main open office/lobby space. replace portion of lighting in kind with ledsDetails
ground floor interior demo under pa 2019-1113-7137. change of use from restaurant to office. new office in back. new outlets in main open office/lobby space. replace portion of lighting in kind with leds | $30,000 |
| Mar 26, 2019 | Never finaled issued Mar 2019, no final | 55 Fair Av | install new stucco at rear and sides of buildingDetails
install new stucco at rear and sides of building | $15,000 |
| Feb 28, 2019 | Completed final sign-off Oct 2021 | 3747 Jackson St | provide temporary shoring system to facilitate excavation and construction of the proposed remodel and addition per approved pa# 201704144072. na/ for maher.Details
provide temporary shoring system to facilitate excavation and construction of the proposed remodel and addition per approved pa# 201704144072. na/ for maher. | $15,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2021 | 55 Fair Av | legalize unit per ord# 43-14 w/ one bedroom, one bathroom & living room kitchen.Details
legalize unit per ord# 43-14 w/ one bedroom, one bathroom & living room kitchen. | $140,000 |
| Oct 10, 2018 | Completed final sign-off Apr 2021 | 2146 Union St | revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s.Details
revision to issued addendum 1 (superstructure) for pa #2016-10-25-1069 s. | |
| Sep 24, 2018 | Completed final sign-off Oct 2019 | 301 Christopher Dr | at laundry room at garage, add 2 partitions and add 20 minutes door and add sink and outlet.Details
at laundry room at garage, add 2 partitions and add 20 minutes door and add sink and outlet. | $5,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2019 | 301 Christopher Dr | remodel one master bath on 1st fl. no change in wall, structure or fixture location. new shower pan replacement. 5x10, 50 sf.Details
remodel one master bath on 1st fl. no change in wall, structure or fixture location. new shower pan replacement. 5x10, 50 sf. | $7,500 |
| Aug 23, 2018 | Completed final sign-off Mar 2019 | 4500 Balboa St | seismic strengthen 1st floor and upgrade beam at 2nd floor framingDetails
seismic strengthen 1st floor and upgrade beam at 2nd floor framing | $18,000 |
| Aug 23, 2018 | Completed final sign-off Apr 2019 | 55 Fair Av | soft story retrofit 1st floor per soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit 1st floor per soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $29,000 |
| Sep 11, 2017 | Completed final sign-off Oct 2019 | 237 Eureka St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls and simpson steel strong wall shear wall.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, through addition of plywood shear walls and simpson steel strong wall shear wall. | $12,000 |
| Apr 14, 2017 | Completed final sign-off Sep 2021 | 3747 Jackson St | renovation of (e) 3 story residential building with basement, and addition on 4th floor.Details
renovation of (e) 3 story residential building with basement, and addition on 4th floor. | $1,800,000 |