David Byrne
- Listed as
- engineer
- Firm
- Imeg
- Based in
- San Francisco
- On San Francisco permits
- Jul 2022 to Sep 2024
9 permits since 2000 (engineer on 9 permits): 8 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 2727 Mariposa St | Swinerton Builders | 1/f: interior ti includes new flooring, wall and ceiling finishes, replace (e) restroom signage tp code compliance all gender accessible signageDetails
1/f: interior ti includes new flooring, wall and ceiling finishes, replace (e) restroom signage tp code compliance all gender accessible signage | $220,000 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | floors 31-32 interconnecting stair onlyDetails
floors 31-32 interconnecting stair only | $100,000 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | 31st fl ti - partitions, floors, existingm, fixtures & finishes. mep deferredDetails
31st fl ti - partitions, floors, existingm, fixtures & finishes. mep deferred | $3,500,000 |
| May 9, 2024 | Completed final sign-off Dec 2024 | 525 Market St | Principal Builders Inc. | 32/f: tenant improvement - partitions, ceiling, fixtures, and finishes. movable partition. mep deferred.Details
32/f: tenant improvement - partitions, ceiling, fixtures, and finishes. movable partition. mep deferred. | $3,500,000 |
| Mar 5, 2024 | Completed final sign-off Aug 2024 | 525 Market St | Principal Builders Inc. | 30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a.Details
30/f-31/f: demo & infill (e) stair between floors 30-31. maher n/a. | $50,000 |
| Nov 1, 2023 | Completed final sign-off Feb 2025 | 495 Geary St | Emcor Services/Mesa Energy Systems Inc | replace 2 (e) rooftop cooling towers w/new cooling towers & basin sweep filter, replace 1 (e) basement condeser water pump serving ch-1 chiller w/ new condenser water pump, install new condenser water pump serving basement water source heat pumps.Details
replace 2 (e) rooftop cooling towers w/new cooling towers & basin sweep filter, replace 1 (e) basement condeser water pump serving ch-1 chiller w/ new condenser water pump, install new condenser water pump serving basement water source heat pumps. | $267,450 |
| Apr 14, 2023 | Never finaled issued May 2023, no final | 525 Market St | Skyline Construction | 20/f: structural work for led display support & suspended lighting @ video production room. ref bpa#202301311040Details
20/f: structural work for led display support & suspended lighting @ video production room. ref bpa#202301311040 | $10,000 |
| Mar 14, 2023 | Completed final sign-off Jul 2025 | 525 Market St | Skyline Construction | suite 120 on 1/f: t.i, demo of non structural partitions and storefront, and building new non-structural partitions and storefront at building facade. (scope includes 294sf of g/f area back to original wall dimensions per 1973 construction)Details
suite 120 on 1/f: t.i, demo of non structural partitions and storefront, and building new non-structural partitions and storefront at building facade. (scope includes 294sf of g/f area back to original wall dimensions per 1973 construction) | $410,000 |
| Jul 13, 2022 | Completed final sign-off May 2024 | 400 Howard St | Dpr Construction | 8/f: interior t.i. - new partitions, doors, finishes and lighting.Details
8/f: interior t.i. - new partitions, doors, finishes and lighting. | $375,000 |