David B. Powyszynski
- Listed as
- architect
- Firm
- The Samuel Group
- Based in
- Dallas
- On San Francisco permits
- Sep 2019 to Sep 2025
11 permits since 2000 (architect on 11 permits): 9 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Jun 2026 | 3624 Geary Bl | Eric F Anderson Incorporated | construction of new wall partiton at the teller lines, installation new millwork including teller line with bullert resistant panels, countertop and cabinetsDetails
construction of new wall partiton at the teller lines, installation new millwork including teller line with bullert resistant panels, countertop and cabinets | $75,000 |
| Jun 26, 2023 | Expired or cancelled cancelled Jan 2026 | 292 Battery St | installing new millwork and flooring at (e) staff rm 106 within wells fargo branchDetails
installing new millwork and flooring at (e) staff rm 106 within wells fargo branch | $35,000 | |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 333 Market St | G L C Construction Company Inc | interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installedDetails
interior renov of (e) wells fargo bank, exterior walk-up atm/night drop, new interior wall partitions, ext atm wall, millwork/teller line, breakroom, it room, work room, new restroom, new finishes, ceiling fixtures to be installed | $446,280 |
| May 9, 2023 | Completed final sign-off Oct 2024 | 292 Battery St | G L C Construction Company Inc | remove 2 atm exterior storefront and replace with solid storefront panels with new tinted glazing to match existing.Details
remove 2 atm exterior storefront and replace with solid storefront panels with new tinted glazing to match existing. | $5,000 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 303 02nd St | G L C Construction Company Inc | removal of (1 of 2) (e) atm's @ wells fargo bank exterior storefront and replacing solid storefront panels with new tinted glazing to match existing. (inside property line)Details
removal of (1 of 2) (e) atm's @ wells fargo bank exterior storefront and replacing solid storefront panels with new tinted glazing to match existing. (inside property line) | $2,000 |
| Jun 15, 2022 | Completed final sign-off Oct 2022 | 303 02nd St | G L C Construction Company Inc | revision to pa 2021-1117-2614 1 supply & return grille added. no new fsd are being added. add lighting and power to first floor.Details
revision to pa 2021-1117-2614 1 supply & return grille added. no new fsd are being added. add lighting and power to first floor. | |
| Jun 1, 2022 | Completed final sign-off Jul 2022 | 303 02nd St | G L C Construction Company Inc | revision to pa# 202111172614. existing restroom to remain unchanged.Details
revision to pa# 202111172614. existing restroom to remain unchanged. | |
| Jan 18, 2022 | Completed final sign-off Sep 2022 | 2100 Chestnut St | Paradigm General Contractors | tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargoDetails
tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo | $561,470 |
| Nov 17, 2021 | Completed final sign-off Jul 2022 | 303 02nd St | G L C Construction Company Inc | ground fl remove furniture, mill work, equipment and flooring in (e) wells fargo bank; install new interior finishes and new wall partitions (non bearing) new furnitureDetails
ground fl remove furniture, mill work, equipment and flooring in (e) wells fargo bank; install new interior finishes and new wall partitions (non bearing) new furniture | $136,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 460 Sutter St | G L C Construction Company Inc | ground fl - remove furniture - equipment and flooring in existing wells fargo bank; install new interrior wall partitions (non bearing); provide new furniture and interior finishesDetails
ground fl - remove furniture - equipment and flooring in existing wells fargo bank; install new interrior wall partitions (non bearing); provide new furniture and interior finishes | $136,000 |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 1595 Sloat Bl | I E C Electrical Contractors Inc | ti 200sf conference room- wall partitions - new finishes - hvac diffusers.Details
ti 200sf conference room- wall partitions - new finishes - hvac diffusers. | $30,000 |