Daniel Espino
- Listed as
- authorized agent-others, engineer
- Firm
- Dre Structural Design
- Based in
- Redwood City
- On San Francisco permits
- Aug 2018 to Apr 2026
10 permits since 2000 (engineer on 9 permits, authorized agent-others on 1 permit): 3 completed, 6 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Aug 2026 | 1736 Fell St | Golden State Plumbing | revision to pa# 2021-0211-4436: 4th fl plan. addition of 4 new dormers instead of 5. relocate water heater and furnace of #1738 to 4th fl. add steps and shear wall at rear side of building at main level patio.Details
revision to pa# 2021-0211-4436: 4th fl plan. addition of 4 new dormers instead of 5. relocate water heater and furnace of #1738 to 4th fl. add steps and shear wall at rear side of building at main level patio. | |
| Jan 29, 2026 | In progress issued Feb 2026 | 1736 Fell St | Golden State Plumbing | revision to 202107305502 - remodel all 3- e units, all exterior doors and windows to be repared. fill in 2nd door of unit 1736 b (n) patio @rear side of bldg at main level, reconfig storage #1,2,3 @ sidewalk level fl. relocate water heat and furnace of unit 1736 to storage #2.Details
revision to 202107305502 - remodel all 3- e units, all exterior doors and windows to be repared. fill in 2nd door of unit 1736 b (n) patio @rear side of bldg at main level, reconfig storage #1,2,3 @ sidewalk level fl. relocate water heat and furnace of unit 1736 to storage #2. | |
| Oct 31, 2025 | In progress issued Nov 2025 | 3293 Mission St | Premier Remodeling Cali Llc | revision to pa# 202310058085, new structural drawings, new bathroom dimensions, add new door.Details
revision to pa# 202310058085, new structural drawings, new bathroom dimensions, add new door. | |
| Oct 18, 2023 | In progress issued Sep 2025 | 1295 Holloway Av | Prosper Construction Dev Inc. | revision to pa# 201911016253 & 202205113984, (n) move inside walls, (n) garage foundation & framing, (n) structural drawing for the garage footing and calculation for shear walls and roof.Details
revision to pa# 201911016253 & 202205113984, (n) move inside walls, (n) garage foundation & framing, (n) structural drawing for the garage footing and calculation for shear walls and roof. | $6,000 |
| Oct 5, 2023 | In progress issued Apr 2025 | 3293 Mission St | Premier Remodeling Cali Llc | prop h. interior tenant improvements at level 1, for change of use from group b office use to group b movie theater, with seating for 43 occupants. includes accessiblility upgrades, and structural and mep upgrades as required.Details
prop h. interior tenant improvements at level 1, for change of use from group b office use to group b movie theater, with seating for 43 occupants. includes accessiblility upgrades, and structural and mep upgrades as required. | $250,000 |
| May 23, 2022 | Expired or cancelled cancelled Jan 2026 | 150 Edgewood Av | replace (e) windows with (n) french doors at living room + master bedroom provide (n) balcony deck for upper floor and provide a new stair down to the backyard from the lower floor.Details
replace (e) windows with (n) french doors at living room + master bedroom provide (n) balcony deck for upper floor and provide a new stair down to the backyard from the lower floor. | $30,000 | |
| Aug 17, 2021 | Completed final sign-off Dec 2021 | 1364 Union St | Vanguard Construction Services | unit a: revision of pa 202105049723 (no plan). remodel bathroom flooring, shower, vanity. remove 8ft section of non structural wall. open approx. 4 ft section of structural wall, install psl and new column, replace existing.Details
unit a: revision of pa 202105049723 (no plan). remodel bathroom flooring, shower, vanity. remove 8ft section of non structural wall. open approx. 4 ft section of structural wall, install psl and new column, replace existing. | $25,000 |
| Feb 11, 2021 | In progress issued Oct 2023 | 1736 Fell St | Golden State Plumbing, Niland Builders | expand top unit into attic. (n) roof dormers.Details
expand top unit into attic. (n) roof dormers. | $230,000 |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 346 Chenery St | Ariana Construction | kitchen remodel which includes removing a load bear wall.Details
kitchen remodel which includes removing a load bear wall. | $35,000 |
| Aug 8, 2018 | Completed final sign-off Nov 2022 | 1926 Divisadero St | Elio Marroquin Construction, A J B Construction Inc | vertical & horizontal addition. a 2nd story addition of a master bathroom & a closet on top of the existing roof at the rear of the house. a kitchen window will be enlarged. maher n/a.Details
vertical & horizontal addition. a 2nd story addition of a master bathroom & a closet on top of the existing roof at the rear of the house. a kitchen window will be enlarged. maher n/a. | $150,000 |