17 permits since 2000 (architect on 17 permits): 12 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2025 | Completed final sign-off Aug 2026 | 415 El Camino Del Mar | Danziger Builders | revision to pa#: 202501148290 to replace (2) existing glass block windows to fixed casement windows. clarify all final proposed window sizes per existing rough opening size.Details
revision to pa#: 202501148290 to replace (2) existing glass block windows to fixed casement windows. clarify all final proposed window sizes per existing rough opening size. | $5,000 |
| Mar 25, 2025 | Completed final sign-off Aug 2026 | 415 El Camino Del Mar | Danziger Builders | revision to pa #202501148290 to capture structural and architectural changes based on field conditionsDetails
revision to pa #202501148290 to capture structural and architectural changes based on field conditions | $14,000 |
| Jan 14, 2025 | Completed final sign-off Aug 2026 | 415 El Camino Del Mar | Danziger Builders | addition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures.Details
addition of elevator spanning all 3 floors. remodel of interior non structural walls and bathrooms. including remodel of kitchen finishes and fixtures. | $150,000 |
| Jul 14, 2022 | Never finaled issued Jul 2022, no final | 181 Fremont St | Baxter Construction | 43/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permitsDetails
43/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permits | $60,000 |
| Aug 6, 2021 | Completed final sign-off Jun 2022 | 152 Lombard St | Centric Building Inc. | level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a.Details
level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a. | |
| Jun 25, 2021 | Completed final sign-off May 2022 | 150 Lombard St | Centric Building Inc. | bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors.Details
bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors. | |
| Jan 25, 2021 | Completed final sign-off Oct 2021 | 1750 Taylor St | Black Mountain Development | unit 1701: new kitchen millwork/appliances. new master bathroom & fixturs and new living room celing - luminares. amend to (e) pa202007280867.Details
unit 1701: new kitchen millwork/appliances. new master bathroom & fixturs and new living room celing - luminares. amend to (e) pa202007280867. | $27,000 |
| Dec 11, 2020 | Completed final sign-off Jun 2022 | 152 Lombard St | Centric Building Inc. | reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7Details
reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7 | |
| Dec 11, 2020 | Completed final sign-off May 2022 | 150 Lombard St | Centric Building Inc. | reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9Details
reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9 | |
| Sep 23, 2020 | Expired or cancelled cancelled Jul 2024 | 465 Davis Ct | minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile.Details
minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. | $60,000 | |
| Sep 23, 2020 | Expired or cancelled cancelled Jul 2024 | 500 Battery St | minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile.Details
minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. | $60,000 | |
| Sep 22, 2020 | Expired or cancelled cancelled Jul 2024 | 460 Davis Ct | minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile.Details
minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. | $60,000 | |
| Sep 14, 2020 | Completed final sign-off Jun 2022 | 154 Lombard St | Centric Construction Inc | interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations.Details
interior remodel of common corridors include new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint). and replacing existing light fixtures wiht new low energy light fixtures. new led lighting at select locations. | $35,000 |
| Sep 10, 2020 | Completed final sign-off Jun 2022 | 156 Lombard St | Centric Construction Inc | common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code.Details
common area: interior remodel to include new tile flooring on level 1, new finishes, walls, carpet, wall coverings, paint. replace existing light fixtures w/ new led fixtures, new led lighting at select locations as required to meet code. | $35,000 |
| Sep 2, 2020 | Never finaled issued Oct 2020, no final | 150 Lombard St | Centric Building Inc. | bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Details
bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. | $35,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2022 | 152 Lombard St | bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Details
bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. | $35,000 | |
| Jan 13, 2020 | Completed final sign-off Sep 2023 | 666 Post St | unit 1604- kitchen & 2 bathrooms remodel, minor non-structural interior alterations, elec panel relocate/upgrade new lighting; new gas line to (e) masonry fireplate, mich finish upgrades, paint, wood floorDetails
unit 1604- kitchen & 2 bathrooms remodel, minor non-structural interior alterations, elec panel relocate/upgrade new lighting; new gas line to (e) masonry fireplate, mich finish upgrades, paint, wood floor | $77,500 |