Coren D Sharples
- Listed as
- architect, engineer
- Firm
- Shop Architects
- Based in
- New York
- On San Francisco permits
- Apr 2018 to Feb 2021
23 permits since 2000 (architect on 21 permits, engineer on 2 permits): 11 completed, 5 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2021 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | per district inspector, revision #5 to site permit #201508245071 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201912190079Details
per district inspector, revision #5 to site permit #201508245071 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201912190079 | |
| Feb 24, 2021 | Never finaled issued Apr 2021, no final | 1515 03rd St | Truebeck Construction | at district inspector's request, revision #6 to site permit #201508245062 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201910164596Details
at district inspector's request, revision #6 to site permit #201508245062 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201910164596 | |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 1515 03rd St | Truebeck Construction | revision to pa# 201508245062 s3. to update standpipe locations at occupied roof deck to match site addendum s8 for fire sprinklers.Details
revision to pa# 201508245062 s3. to update standpipe locations at occupied roof deck to match site addendum s8 for fire sprinklers. | |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street. this is a free standing wayfinding totem facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street. this is a free standing wayfinding totem facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this sign is a 1 face non-illuminated "1515 third street" facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this sign is a 1 face non-illuminated "1515 third street" facing west. | $200 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | Truebeck Construction | mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this sign is 1 face, non-illuminated "uber" sign on s/w corner facing west.Details
mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this sign is 1 face, non-illuminated "uber" sign on s/w corner facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane. this is a free standing exterior wayfinding totem.Details
mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane. this is a free standing exterior wayfinding totem. | $500 | |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this is a 1 face non-illuminated sign "uber" facing west.Details
mb2-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage and glass decal signage at the entry of 1515 3rd street.this is a 1 face non-illuminated sign "uber" facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | Truebeck Construction | mb1-master signage plan per g-04.permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this 1 face non-electric sign "1455 third street" is in s/w corner facing west.Details
mb1-master signage plan per g-04.permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this 1 face non-electric sign "1455 third street" is in s/w corner facing west. | $200 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1515 03rd St | Truebeck Construction | pierpoint ln east and west entrances - master signage plan per g-04. this permit submission includes 2 free-standing exterior wayfinding totem signage on pierpoint lane at east and west entrances at bridgeview way & third street.Details
pierpoint ln east and west entrances - master signage plan per g-04. this permit submission includes 2 free-standing exterior wayfinding totem signage on pierpoint lane at east and west entrances at bridgeview way & third street. | $500 |
| Jun 24, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a ground, non-electric sign,includes free-standing exterior wayfinding totem signage at the entry of 1455 03rd st. **maher n/a**Details
to erect a ground, non-electric sign,includes free-standing exterior wayfinding totem signage at the entry of 1455 03rd st. **maher n/a** | $500 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a non-electric,single faced, door/window sign.Details
to erect a non-electric,single faced, door/window sign. | $200 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a ground, non electric sing (south of 1455 03rd st)pierpoint lane.**maher n/a**Details
to erect a ground, non electric sing (south of 1455 03rd st)pierpoint lane.**maher n/a** | $500 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a ground, non-electric sign.free standing exterior wayfinding totem signage at the entry of 1515 rd st**maher n/a**Details
to erect a ground, non-electric sign.free standing exterior wayfinding totem signage at the entry of 1515 rd st**maher n/a** | $500 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a singled faced, non-electric sign. includes building identification signage at the entry. "uber" **maher n/a**Details
to erect a singled faced, non-electric sign. includes building identification signage at the entry. "uber" **maher n/a** | $5,000 |
| Jun 19, 2020 | Completed final sign-off Mar 2021 | 1515 03rd St | Truebeck Construction | to erect a non electric,single faced, door/window sign."1515 third st"**maher n/a**Details
to erect a non electric,single faced, door/window sign."1515 third st"**maher n/a** | $200 |
| Jun 19, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a non-electric, single faced, door/window sign. "1455 third street"operational decals a the entry of 1455 3rd st **maher n/a**Details
to erect a non-electric, single faced, door/window sign. "1455 third street"operational decals a the entry of 1455 3rd st **maher n/a** | $200 |
| May 5, 2020 | Never finaled issued May 2020, no final | 1515 03rd St | Truebeck Construction | revision to 201911268230. smoke control matrix has been revised to clarify actions for atrium skylights as noted in ti permit setDetails
revision to 201911268230. smoke control matrix has been revised to clarify actions for atrium skylights as noted in ti permit set | |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1455 03rd St | Truebeck Construction | revision to pa #2019-0104-9632: revise smoke control riser & matrix for floor closure between levels 6 & 7 to operate as separate smoke zones. revised ahu dmaper and fan control on smoke control panelDetails
revision to pa #2019-0104-9632: revise smoke control riser & matrix for floor closure between levels 6 & 7 to operate as separate smoke zones. revised ahu dmaper and fan control on smoke control panel | |
| Dec 6, 2019 | Completed final sign-off May 2021 | 1515 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed pierpoint lane.Details
installation of art on (e) privately owned, publicly accessed pierpoint lane. | $30,000 |
| Dec 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed open space, lot 34.Details
installation of art on (e) privately owned, publicly accessed open space, lot 34. | $25,000 |
| Oct 16, 2019 | Never finaled issued Sep 2020, no final | 1515 03rd St | Truebeck Construction | revision to issued permit# 2015-0824-5062 addendum# 3 to incorporate changes to various life safety, egress path, door schedule, room layout, and misc drawings.**maher n/a**Details
revision to issued permit# 2015-0824-5062 addendum# 3 to incorporate changes to various life safety, egress path, door schedule, room layout, and misc drawings.**maher n/a** | |
| Apr 10, 2018 | Never finaled issued Aug 2018, no final | 1515 03rd St | Truebeck Construction | deferred fuel oil permit associated with approved site permit #2015-0824-5062.Details
deferred fuel oil permit associated with approved site permit #2015-0824-5062. |