Christine Fontillas
- Listed as
- architect, attorney, engineer
- Based in
- Novato
- On San Francisco permits
- Feb 2005 to Oct 2023
21 permits since 2000 (engineer on 18 permits, architect on 2 permits, attorney on 1 permit): 14 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2023 | Expired or cancelled withdrawn Feb 2024 | 340 Lake St | int remodel, kitchen remodel, remove bearring wall, remodel (2)e baths, conversion of e closet spaces into 1 full bath & 1 powder rm, replace living rm windows & french door into 1 patio sliding door unit. reconfigure e(1) car garage/basement to 2-car tandem garage w/enlarged garage door,Details
int remodel, kitchen remodel, remove bearring wall, remodel (2)e baths, conversion of e closet spaces into 1 full bath & 1 powder rm, replace living rm windows & french door into 1 patio sliding door unit. reconfigure e(1) car garage/basement to 2-car tandem garage w/enlarged garage door, | $300,000 | |
| May 2, 2023 | Never finaled issued Aug 2023, no final | 2405 Green St | kitchen remodel. remove partitions, new partitions, appliance, cabinets, counters, upgrade elec. bathrm remodel. remove partitions, new partitions, fixtures, shower, cabinetryDetails
kitchen remodel. remove partitions, new partitions, appliance, cabinets, counters, upgrade elec. bathrm remodel. remove partitions, new partitions, fixtures, shower, cabinetry | $140,000 | |
| Nov 20, 2019 | Completed final sign-off Jun 2020 | 44 Leese St | Handyman Heroes Inc. | minor renovations to photography studio: add windows to front wall for natural lght. convert closet into new 1/2 bathroom. renovate (e) kitchen in break room. no commercial food prepDetails
minor renovations to photography studio: add windows to front wall for natural lght. convert closet into new 1/2 bathroom. renovate (e) kitchen in break room. no commercial food prep | $25,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2024 | 775 Vermont St | Ivan Alberto Rivera Rivas | comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing.Details
comply to correct complaint #201899601. access for roof/solar equipment access. legalize steel spiral roof access ladder stair post installed on conc pad footing. | $5,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2020 | 1530 48th Av | Insight Construction Partners Inc | new foundation (as needed) and new construction of (e) 1st floor as needed with (n) diving walls.replace bathroom and move kitchen in small rear addition. new second floor in location of (e) 2nd floor, 2 (n) bedroom and 1 (n) bathroom. comply with nov #201577572Details
new foundation (as needed) and new construction of (e) 1st floor as needed with (n) diving walls.replace bathroom and move kitchen in small rear addition. new second floor in location of (e) 2nd floor, 2 (n) bedroom and 1 (n) bathroom. comply with nov #201577572 | $210,000 |
| Dec 5, 2017 | Completed final sign-off Jun 2018 | 3476 Jackson St | Thompson Brooks Inc. | at front entry: foundation repair of dry-rot members and addition of new water-proofing elements maher na. repair in kind.Details
at front entry: foundation repair of dry-rot members and addition of new water-proofing elements maher na. repair in kind. | $15,000 |
| Sep 1, 2017 | Completed final sign-off Sep 2019 | 524 Baker St | Curran & Associates General Contractors, Ashbury Gen Constructing & Eng | structural upgrade - replace (e) foundation in garage. 1/f: remodel to expand garage into lightwells on both sides, infill a portion of the uninhabited 1/f under bldg. above, no change to front facade except replace pair of garage doors.Details
structural upgrade - replace (e) foundation in garage. 1/f: remodel to expand garage into lightwells on both sides, infill a portion of the uninhabited 1/f under bldg. above, no change to front facade except replace pair of garage doors. | $100,000 |
| Jul 14, 2016 | Completed final sign-off Mar 2017 | 186 Merced Av | Handyman Heroes Inc. | remodel kitchen & 2 bathrm, new laundry room, add 1 full bathroom, wetbar and 2 closets at basement. reconfigure interior stair and raise ceiling at living-dining and one bedroom, widen opening from dining to kitchen, add 6 new windows & 1 door. reconfigure 4(e) windows, title 24, new interiorDetails
remodel kitchen & 2 bathrm, new laundry room, add 1 full bathroom, wetbar and 2 closets at basement. reconfigure interior stair and raise ceiling at living-dining and one bedroom, widen opening from dining to kitchen, add 6 new windows & 1 door. reconfigure 4(e) windows, title 24, new interior | $150,000 |
| May 6, 2016 | Completed final sign-off Jan 2017 | 175 Lucky St | replace extg foundation and increase size of garage.Details
replace extg foundation and increase size of garage. | $60,000 | |
| Jan 28, 2016 | Never finaled filed Jan 2016, never issued | 1530 48th Av | Insight Construction Partners Inc | comply w/ nov 201577572. see: 2015.16598var. major remodel to (e)cottage at rear of property. full foundation replacement/upgrade.add new windows, change roof plate below (e) ridgeline. upgrade/replace all finishes & systems.Details
comply w/ nov 201577572. see: 2015.16598var. major remodel to (e)cottage at rear of property. full foundation replacement/upgrade.add new windows, change roof plate below (e) ridgeline. upgrade/replace all finishes & systems. | $287,000 |
| Sep 10, 2015 | Completed final sign-off Aug 2017 | 2334 Webster St | Mountain Bay Construction | revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath.Details
revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath. | $40,000 |
| Apr 8, 2015 | Completed final sign-off Feb 2017 | 1780 Revere Av | Constantine Construction | interior remodel: grnd flr: partitions to designate (n) room layout, 1 bathroom, 1 utility room; add new interior doors. change out (at rear) 1 window for door, 1 door for window. 2nd flr: remodel kitch, change window for door and door for window, add 1 new bathroom, remodel (e) bathroom add w/dDetails
interior remodel: grnd flr: partitions to designate (n) room layout, 1 bathroom, 1 utility room; add new interior doors. change out (at rear) 1 window for door, 1 door for window. 2nd flr: remodel kitch, change window for door and door for window, add 1 new bathroom, remodel (e) bathroom add w/d | $75,000 |
| Mar 4, 2015 | Expired or cancelled cancelled Nov 2024 | 96 Santa Ysabel Av | horizontal extension. ground floor build out of basement. 1 family room, 1 bedroom, 1 bathroom, enlarge kitchen on 1st level. remodel 2nd level bathroom.Details
horizontal extension. ground floor build out of basement. 1 family room, 1 bedroom, 1 bathroom, enlarge kitchen on 1st level. remodel 2nd level bathroom. | $125,000 | |
| Oct 27, 2014 | Completed final sign-off Sep 2016 | 1232 Treat Av | voluntary strengthening:install moment frame in garage areaDetails
voluntary strengthening:install moment frame in garage area | $5,000 | |
| Aug 29, 2013 | Never finaled issued Oct 2013, no final | 462 Liberty St | Christopher W. Geiger | revision to pa #2013.07.08.1317 - change details on 1-s3 & 3-s/3.Details
revision to pa #2013.07.08.1317 - change details on 1-s3 & 3-s/3. | |
| Apr 24, 2013 | Completed final sign-off Apr 2015 | 262 Nevada St | Kelly Construction | build a 440 sq ft art studio over an (e) garage. consist of (1) large room & (1) bathroom. bathroom extends 33 sq ft into the middle yard & at ground level.Details
build a 440 sq ft art studio over an (e) garage. consist of (1) large room & (1) bathroom. bathroom extends 33 sq ft into the middle yard & at ground level. | $37,500 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 1550 09th Av | to underpin the foundation due to foundation depth change at 1542-1546 - 9th. ave.Details
to underpin the foundation due to foundation depth change at 1542-1546 - 9th. ave. | $15,000 | |
| Jan 21, 2009 | Completed final sign-off Feb 2010 | 2259 Bay St | replace existing interior pads and property line foundation.Details
replace existing interior pads and property line foundation. | $40,000 | |
| Feb 6, 2008 | Expired or cancelled expired Jan 2011 | 524 Baker St | remodel (e) garage to allow 3 car parking spaces & rear storage to provide habitable space connected to unit 524 via open staircase. sprinkler 1st floor under separate permit.Details
remodel (e) garage to allow 3 car parking spaces & rear storage to provide habitable space connected to unit 524 via open staircase. sprinkler 1st floor under separate permit. | $95,000 | |
| Aug 17, 2007 | Completed final sign-off Mar 2008 | 2255 Beach St | 2 level deck on the back of the building.Details
2 level deck on the back of the building. | $10,000 | |
| Feb 9, 2005 | Never finaled issued Jan 2006, no final | 236 Cole St | replace 1-story deck w/2-story deck. add spiral stiar. replace weatherd siding, including addingDetails
replace 1-story deck w/2-story deck. add spiral stiar. replace weatherd siding, including adding | $16,000 |