6 permits since 2000 (engineer on 6 permits): 2 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2007 | Expired or cancelled withdrawn May 2009 | 390 01st St | Cannon Constructors North Inc | underpinning as a result of adjacent, new construction @ 45 lansing appl#200508311745/s.Details
underpinning as a result of adjacent, new construction @ 45 lansing appl#200508311745/s. | $175,000 |
| Aug 23, 2007 | Expired or cancelled withdrawn May 2009 | 81 Lansing St | Cannon Constructors North Inc | underpinning as a result of adjacent new construction at 45 lansing st under pa# 2005.08.31.1745sDetails
underpinning as a result of adjacent new construction at 45 lansing st under pa# 2005.08.31.1745s | $275,000 |
| Aug 23, 2007 | Expired or cancelled withdrawn May 2009 | 45 Lansing St | Cannon Constructors North Inc | excavation and shoring for new construction 45 lansing street under pa #2005.08.31.1745/s. underpinning under separate permit.Details
excavation and shoring for new construction 45 lansing street under pa #2005.08.31.1745/s. underpinning under separate permit. | $300,000 |
| May 4, 2006 | Completed final sign-off Nov 2010 | 318 Spear St | temporary shoring of three transformer vaults: vault v-1 sketch ssk-014 drawing reference b-s2.b1. vault v-2 sketch #ssk-015.drawing ref. c-s2.01. vault v-3 -sketch #ssk-016. drawing ref. d-s2.b1. all transformers, cables & equipments shall be located inside the building.Details
temporary shoring of three transformer vaults: vault v-1 sketch ssk-014 drawing reference b-s2.b1. vault v-2 sketch #ssk-015.drawing ref. c-s2.01. vault v-3 -sketch #ssk-016. drawing ref. d-s2.b1. all transformers, cables & equipments shall be located inside the building. | $50,000 | |
| May 11, 2005 | Never finaled issued Jun 2005, no final | 201 Crescent Ct | as construction started it was determined that a more cost effective shoring system could be used.Details
as construction started it was determined that a more cost effective shoring system could be used. | ||
| Feb 28, 2005 | Completed final sign-off Jan 2007 | 318 Spear St | Webcor Construction Lp | provide temporary shoring wall with tiebacksDetails
provide temporary shoring wall with tiebacks | $500,000 |