Permit GraphShortlistSan Francisco building permits since 2000

Chris Mcnamara

License
E21600
Look the license up with the state
Listed as
engineer
Firm
Cupertino Electric
On San Francisco permits
Jun 2017 to May 2022

5 permits since 2000 (engineer on 5 permits): 3 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 16, 2022Completed
final sign-off Jul 2023
3838 California StBoldt California Incste 805: remodel of an existing medical office suite within an 8-story building above grade.
Details
Permit
202205164310
Status
complete
Filed
May 16, 2022
Permit issued
Jun 17, 2022
Final sign-off
Jul 27, 2023
Declared cost
$2,561,000
Address
3838 California St

ste 805: remodel of an existing medical office suite within an 8-story building above grade.

Open the permit page

$2,561,000
Jun 30, 2021Never finaled
issued Sep 2021, no final
3838 California StThe Boldt Companyste 805: remodel of (e) medical office suite within an 8 stories building above grade
Details
Permit
202106303538
Status
issued
Filed
Jun 30, 2021
Permit issued
Sep 16, 2021
Declared cost
$450,000
Address
3838 California St

ste 805: remodel of (e) medical office suite within an 8 stories building above grade

Open the permit page

$450,000
Aug 6, 2018Completed
final sign-off Mar 2019
160 Spear StGci, Inc1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218
Details
Permit
201808066463
Status
complete
Filed
Aug 6, 2018
Permit issued
Aug 22, 2018
Final sign-off
Mar 11, 2019
Declared cost
$250,000
Address
160 Spear St

1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218

Open the permit page

$250,000
Jul 17, 2017Completed
final sign-off Mar 2018
455 Mission Bay Blvd SouthDome Construction Corp1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance
Details
Permit
201707172015
Status
complete
Filed
Jul 17, 2017
Permit issued
Jul 26, 2017
Final sign-off
Mar 6, 2018
Declared cost
$600,000
Address
455 Mission Bay Blvd South

1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance

Open the permit page

$600,000
Jun 29, 2017Never finaled
issued Jul 2017, no final
455 Mission Bay Blvd SouthDome Construction Corp3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13
Details
Permit
201706290676
Status
issued
Filed
Jun 29, 2017
Permit issued
Jul 17, 2017
Declared cost
$800,000
Address
455 Mission Bay Blvd South

3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13

Open the permit page

$800,000