Chris Mcnamara
- Listed as
- engineer
- Firm
- Cupertino Electric
- On San Francisco permits
- Jun 2017 to May 2022
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2022 | Completed final sign-off Jul 2023 | 3838 California St | Boldt California Inc | ste 805: remodel of an existing medical office suite within an 8-story building above grade.Details
ste 805: remodel of an existing medical office suite within an 8-story building above grade. | $2,561,000 |
| Jun 30, 2021 | Never finaled issued Sep 2021, no final | 3838 California St | The Boldt Company | ste 805: remodel of (e) medical office suite within an 8 stories building above gradeDetails
ste 805: remodel of (e) medical office suite within an 8 stories building above grade | $450,000 |
| Aug 6, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | Gci, Inc | 1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218Details
1/f: sales center - relocate 1 (e) panel board to new electrical closet, install new receptacles for connection, install new luminars w/assoc controls maher na. ref pa#201805169218 | $250,000 |
| Jul 17, 2017 | Completed final sign-off Mar 2018 | 455 Mission Bay Blvd South | Dome Construction Corp | 1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinanceDetails
1st fl only: some wall and ceiling demolition to reconfigure layour of office area. some new walls, ceiling, and lighting finishes to match existing. n/a maher ordinance | $600,000 |
| Jun 29, 2017 | Never finaled issued Jul 2017, no final | 455 Mission Bay Blvd South | Dome Construction Corp | 3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13Details
3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13 | $800,000 |