- Jul 2004 to Dec 2024
98 permits since 2000 (architect on 94 permits, authorized agent-others on 5 permits, engineer on 1 permit): 68 completed, 13 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2024 | Completed final sign-off Sep 2025 | 149 Winfield St | interior remodel of ground floor storage room into office. add (n) wall at laundry room. level (e) concrete floors. replace rear facing (2) doors, and (1) window. electrical, lighting and plumbing in area of workDetails
interior remodel of ground floor storage room into office. add (n) wall at laundry room. level (e) concrete floors. replace rear facing (2) doors, and (1) window. electrical, lighting and plumbing in area of work | $75,000 | |
| Dec 28, 2023 | Completed final sign-off Oct 2024 | 135 San Aleso Av | Anthony Sachelli Remodeling | interior kitchen remodel, replace in-kind rear patio door, add new skylight, 2 new casement windows at 2/f kitchen, new lighting, electrical, plumbing in area of work. replace hvac with new heat pump. dryrot repair as required at ne corner and south wall.Details
interior kitchen remodel, replace in-kind rear patio door, add new skylight, 2 new casement windows at 2/f kitchen, new lighting, electrical, plumbing in area of work. replace hvac with new heat pump. dryrot repair as required at ne corner and south wall. | $45,000 |
| Aug 31, 2023 | Never finaled issued Aug 2023, no final | 2860 Diamond St | improvements to comply with abe program, abe# 202304246899, replace door hardware, add kickplate, a power door operator with push bar at exterior, add electrical outlet near door.Details
improvements to comply with abe program, abe# 202304246899, replace door hardware, add kickplate, a power door operator with push bar at exterior, add electrical outlet near door. | $3,000 | |
| Aug 31, 2023 | Expired or cancelled cancelled Feb 2026 | 2852 Diamond St | improvements to comply with abe program, abe# 202304056651, replace door hardware, add kickplate, a power door operator with push bar at exterior, add electrical outlet near door.Details
improvements to comply with abe program, abe# 202304056651, replace door hardware, add kickplate, a power door operator with push bar at exterior, add electrical outlet near door. | $3,000 | |
| Jun 29, 2023 | Never finaled issued Aug 2023, no final | 654 Chenery St | to comply with abe ord 51-16. abe 201912169920. a (n) entrance door and incactive leaf will will be installed in the (e) opening; a (n) power door operator will installed over the door and a (n) electrical outlet will be installed if there is not sufficient power near the entry. a control bar willDetails
to comply with abe ord 51-16. abe 201912169920. a (n) entrance door and incactive leaf will will be installed in the (e) opening; a (n) power door operator will installed over the door and a (n) electrical outlet will be installed if there is not sufficient power near the entry. a control bar will | $5,000 | |
| Aug 12, 2022 | Completed final sign-off Apr 2023 | 1859 Vallejo St | O'kane Construction Llc | unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural workDetails
unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural work | $70,000 |
| Mar 23, 2022 | Completed final sign-off Jul 2023 | 3937 17th St | K G Construction | revision to pa# 2021-1021-0910. 100% replacement of 2nd & 3rd flr if (e) utility porch. 100% replacement if exterior stair. add 3 (n) windows to groun flr rear. (n) porch & stair to be same height width & depth as (e). no increase in volume. elect & plumbing added to porch area.Details
revision to pa# 2021-1021-0910. 100% replacement of 2nd & 3rd flr if (e) utility porch. 100% replacement if exterior stair. add 3 (n) windows to groun flr rear. (n) porch & stair to be same height width & depth as (e). no increase in volume. elect & plumbing added to porch area. | $35,000 |
| Aug 13, 2021 | Completed final sign-off Jan 2022 | 875 North Point St | Anco Construction Company | interior addition of 1(n) bedroom, 1 half bath, laundry, wet bar, family rm and entertaiment rm @ 1st/f where (e) storage are. 1 exterior door @ rear 1st/f will be replaced w/ a double hung winidw. lighting, electrical, plumbing, hvac in area of work. (n) gas insert @ 2dn/f fireplace.Details
interior addition of 1(n) bedroom, 1 half bath, laundry, wet bar, family rm and entertaiment rm @ 1st/f where (e) storage are. 1 exterior door @ rear 1st/f will be replaced w/ a double hung winidw. lighting, electrical, plumbing, hvac in area of work. (n) gas insert @ 2dn/f fireplace. | $150,000 |
| Feb 4, 2021 | Expired or cancelled expired Jan 2024 | 462 Filbert St | Peter Nestler Builder | revision to adu pa# 201711063192. minor changes to layout of bathroom & laundry closet. move kitchen to front facing street. change window type at bedrooms. relocate entry door. add 2 fixed windows.Details
revision to adu pa# 201711063192. minor changes to layout of bathroom & laundry closet. move kitchen to front facing street. change window type at bedrooms. relocate entry door. add 2 fixed windows. | $100 |
| Aug 25, 2020 | Never finaled issued Mar 2022, no final | 4032 Folsom St | this project is for a 1 & 2 story rear yard addition to a 2-story single family residence. 1st floor will add (2) new bedrooms, full bathroom, and closets. 2nd floor will add a new dining room and a roof deck. (n) plumbing, (n) lighting & electrical.Details
this project is for a 1 & 2 story rear yard addition to a 2-story single family residence. 1st floor will add (2) new bedrooms, full bathroom, and closets. 2nd floor will add a new dining room and a roof deck. (n) plumbing, (n) lighting & electrical. | $175,000 | |
| Sep 24, 2019 | Completed final sign-off May 2022 | 208 Surrey St | Sing Wong | front yard addition of an entry porch @ 2nd fl level on (e) front deck. (2)(n) windows & (1)(n) front entry door. electrical & lighting in the are of work.Details
front yard addition of an entry porch @ 2nd fl level on (e) front deck. (2)(n) windows & (1)(n) front entry door. electrical & lighting in the are of work. | $25,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2019 | 605 Chenery St | A L Martin Construction | infill opening in interior wall between 2 commercial storefronts. remove interior stairDetails
infill opening in interior wall between 2 commercial storefronts. remove interior stair | $2,000 |
| Jun 27, 2019 | Never finaled issued Jul 2019, no final | 431 Bosworth St | revision to pa 201711063150. relocate (e) interior stair, delete (n) 1/2 bath at ground floor, relocate (n) door and window openings in ground flr rear wall and add (n) rear yard wood deck less 30 inch above grade. associated changes to mech, electr and plumb. no changes to enclosed areaDetails
revision to pa 201711063150. relocate (e) interior stair, delete (n) 1/2 bath at ground floor, relocate (n) door and window openings in ground flr rear wall and add (n) rear yard wood deck less 30 inch above grade. associated changes to mech, electr and plumb. no changes to enclosed area | ||
| May 9, 2019 | Completed final sign-off Jun 2021 | 20 Sussex St | A L Martin Construction | facade remodel with replacement of 4 window units, new finishes, change the extg 2 garage doors into 1 single door and replace front entry door. voluntary structural strengthening of ground floor and facade.Details
facade remodel with replacement of 4 window units, new finishes, change the extg 2 garage doors into 1 single door and replace front entry door. voluntary structural strengthening of ground floor and facade. | $27,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2019 | 240 Magellan Av | Building Construction Express | interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of workDetails
interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of work | $48,000 |
| Mar 5, 2019 | Never finaled issued Jul 2019, no final | 11 Mizpah St | revision to pa 2018-1113-5692 rear deck revisionDetails
revision to pa 2018-1113-5692 rear deck revision | $12,000 | |
| Dec 6, 2018 | Expired or cancelled expired Jan 2024 | 462 Filbert St | Peter Nestler Builder | voluntary seismic retrofit on ground fl per ab-094Details
voluntary seismic retrofit on ground fl per ab-094 | $50,000 |
| Oct 25, 2018 | Completed final sign-off Feb 2021 | 654 Chenery St | A L Martin Construction | new rear yard additon (n) covered deck & open deck will be built between (e) bldg @ 2nd flr. ground lvl retaining wall will be replaced. (n) patio slab, plumbing, electrical & lighting in area of work.Details
new rear yard additon (n) covered deck & open deck will be built between (e) bldg @ 2nd flr. ground lvl retaining wall will be replaced. (n) patio slab, plumbing, electrical & lighting in area of work. | $165,000 |
| Oct 25, 2018 | Completed final sign-off Oct 2021 | 350 Joost Av | Transbay Design Build Llc | rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac.Details
rear yard addition of (n) 1-story master bed & bath. (n) interior connecting stair. renovate (e) kitchen & bath. remove (e) rear bay window & add (n) sliding door in place. (n) laundry room at ground flr, plumbing, electrical, lighting & hvac. | $275,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 785 Golden Gate Av | Anthony Sachelli Remodeling | revision to 201709279747. remove notation for e bath vent fan to remain. request that e operable window in bath be allowed for ventilation in lieu of mech fanDetails
revision to 201709279747. remove notation for e bath vent fan to remain. request that e operable window in bath be allowed for ventilation in lieu of mech fan | |
| Sep 5, 2018 | Completed final sign-off Oct 2021 | 350 Joost Av | interior remodel of ground floor garage/storage room into a bedroom, full bath, mud room and laundry. 2 windows will be replaced to the front facade at ground floor. interior load bearing posts and foundation replaced. new rear retaining wall. new conc.slab in area of work.Details
interior remodel of ground floor garage/storage room into a bedroom, full bath, mud room and laundry. 2 windows will be replaced to the front facade at ground floor. interior load bearing posts and foundation replaced. new rear retaining wall. new conc.slab in area of work. | $125,000 | |
| Feb 15, 2018 | Expired or cancelled cancelled May 2023 | 683 Chenery St | (e) ground fl restaurant facing chenery st. will be redeveloped as a new restaurant with a new kitchn & support spaces / kitchen & restaurant interior will be a separate t.i. permit. (e) 3 story rear bldg on wilder st. will be replaced with 4 new residential apts. 2 studios, 2-1 br units in a newDetails
(e) ground fl restaurant facing chenery st. will be redeveloped as a new restaurant with a new kitchn & support spaces / kitchen & restaurant interior will be a separate t.i. permit. (e) 3 story rear bldg on wilder st. will be replaced with 4 new residential apts. 2 studios, 2-1 br units in a new | $950,000 | |
| Dec 19, 2017 | Expired or cancelled cancelled Oct 2022 | 31 Natick St | convert unconditioned 1st floor space into bedroom, family room, and bathroom. an interior stair will connect to the extg 2nd floor. a new single car garage will be excavated below the 1st floor with a new driveway, retaining walls and curb cut. add 3 new windows & 2 nw doors. elect, mech, & plmg.Details
convert unconditioned 1st floor space into bedroom, family room, and bathroom. an interior stair will connect to the extg 2nd floor. a new single car garage will be excavated below the 1st floor with a new driveway, retaining walls and curb cut. add 3 new windows & 2 nw doors. elect, mech, & plmg. | $200,000 | |
| Dec 13, 2017 | Completed final sign-off May 2018 | 275 Stanyan St | Kenneth Zhu Construction | remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchenDetails
remodel of (e) kitchen at 2nd floor. new opening in load bearing wall with posts beams and footings down to ground floor. ele & plm in kitchen | $75,000 |
| Nov 6, 2017 | Expired or cancelled expired Jan 2024 | 462 Filbert St | Peter Nestler Builder | addition of dwelling unit per ordinance #162-16. ground fl interior remodel of unconditioned garage space into a one bedroom apartment w/ kitchen, bath & living space. infill addition under (e) conditioned space above.Details
addition of dwelling unit per ordinance #162-16. ground fl interior remodel of unconditioned garage space into a one bedroom apartment w/ kitchen, bath & living space. infill addition under (e) conditioned space above. | $125,000 |
| Oct 30, 2017 | Never finaled issued Jul 2019, no final | 154 Eastwood Dr | vertical addition of 5' to provide living space in basement converting home from 3 bedrooms, 2 baths into 4 bedrooms, 4 baths & an office.Details
vertical addition of 5' to provide living space in basement converting home from 3 bedrooms, 2 baths into 4 bedrooms, 4 baths & an office. | $400,000 | |
| Oct 5, 2017 | Completed final sign-off Oct 2018 | 171 Burnside Av | a-5 revision to pa#201708164952, lighting & electricalDetails
a-5 revision to pa#201708164952, lighting & electrical | ||
| Sep 27, 2017 | Completed final sign-off Dec 2018 | 785 Golden Gate Av | Anthony Sachelli Remodeling | unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions.Details
unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions. | $25,000 |
| Sep 8, 2017 | Completed final sign-off May 2018 | 145 Bella Vista Wy | alteration of e gr fl to include 1 bedroom, 1 full bath, home office, laundry & mechanical space. 1 new window, 1 new door on rear facade. replace concrete slab in area of work. relocate e furnace &hot water heaterDetails
alteration of e gr fl to include 1 bedroom, 1 full bath, home office, laundry & mechanical space. 1 new window, 1 new door on rear facade. replace concrete slab in area of work. relocate e furnace &hot water heater | $90,000 | |
| Aug 16, 2017 | Completed final sign-off Oct 2018 | 171 Burnside Av | 1/f infill addition under (e) over hanging space above to include new bedroom, family room, office & bathroom. remodel kitchen & bath on 2/f, replace all (e) windows at front & back, new deck & stair at 2/f.Details
1/f infill addition under (e) over hanging space above to include new bedroom, family room, office & bathroom. remodel kitchen & bath on 2/f, replace all (e) windows at front & back, new deck & stair at 2/f. | $95,000 | |
| Dec 23, 2016 | Completed final sign-off Jul 2018 | 465 Bartlett St | A L Martin Construction | interior remodel and addition. replace in kind 3-story rear pop out. 1st floor addition of 2 bedrooms, home office, 2 baths and laundry. n hvac, elect. & plmg. replace 11 windows. 2nd floor: remodel kitchen and 1 bath. 3rd floor: remodel 1 bedroom and add rough in plumbing for bath.Details
interior remodel and addition. replace in kind 3-story rear pop out. 1st floor addition of 2 bedrooms, home office, 2 baths and laundry. n hvac, elect. & plmg. replace 11 windows. 2nd floor: remodel kitchen and 1 bath. 3rd floor: remodel 1 bedroom and add rough in plumbing for bath. | $475,000 |
| Dec 19, 2016 | Completed final sign-off Sep 2023 | 1025 Sanchez St | Jtm Developments | add unit per ord 162-16. ref 201608094583 for soft story seismic retrofit. add units per ord 162-16. 2 new studio units will be built on grd fl of an (e) 3-story residential bldg. there will be elec, plumb & fire sprinkler work done at the grd fl.Details
add unit per ord 162-16. ref 201608094583 for soft story seismic retrofit. add units per ord 162-16. 2 new studio units will be built on grd fl of an (e) 3-story residential bldg. there will be elec, plumb & fire sprinkler work done at the grd fl. | $200,000 |
| Oct 27, 2016 | Never finaled issued Dec 2017, no final | 431 Bosworth St | remove (e) front entry stairs & decorative wall, rebuild front entry stairs within front set back per planning code sect 136.Details
remove (e) front entry stairs & decorative wall, rebuild front entry stairs within front set back per planning code sect 136. | $10,000 | |
| Sep 9, 2016 | Completed final sign-off Nov 2017 | 389 Roosevelt Wy | Transbay Design Build Llc | the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work.Details
the project includes a ground floor infill addition below a permitted rear yard deck(200508120219). new rooms to include a home office, bathroom and family room. there will be a partial seismic upgrade, plbmg and electrical in the area of work. | $100,000 |
| Jul 26, 2016 | Completed final sign-off Apr 2018 | 1318 Cole St | Zecenas Construction | revision to pa#201510210391, the scope consists of change in layout of retaining walls surrounding courtyard and exterior stair and relocating laundry within the new unit. changes will not reduce size of courtyard, change the egress path, reduce light and air to interior or increase excavation.Details
revision to pa#201510210391, the scope consists of change in layout of retaining walls surrounding courtyard and exterior stair and relocating laundry within the new unit. changes will not reduce size of courtyard, change the egress path, reduce light and air to interior or increase excavation. | |
| Jun 30, 2016 | Completed final sign-off Nov 2017 | 1676 Sanchez St | Stingray Builders Inc. | 2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom.Details
2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom. | $175,000 |
| Jun 13, 2016 | Completed final sign-off Apr 2017 | 230 Lakeview Av | Anthony Sachelli Remodeling | replace (e) exterior rear yard deck with (n) balcony & spiral stair to grade with (n) concrete patio at grade. add 2 new skylights.Details
replace (e) exterior rear yard deck with (n) balcony & spiral stair to grade with (n) concrete patio at grade. add 2 new skylights. | $45,000 |
| Feb 11, 2016 | Completed final sign-off Apr 2017 | 68 Madrone Av | Zeus Construction Corp. | foundation replacement - lowering/replacing slab. (n) internal stair between ground floor and 2nd floor. (e) bath @ 2nd floor will be demolished. adding (n) powder room @ 2nd floor and (n) full bath @ ground floor and 3rd floor. (e) master bath @ 3rd floor to be remodeled. (3) (n) windows and 2 (n)Details
foundation replacement - lowering/replacing slab. (n) internal stair between ground floor and 2nd floor. (e) bath @ 2nd floor will be demolished. adding (n) powder room @ 2nd floor and (n) full bath @ ground floor and 3rd floor. (e) master bath @ 3rd floor to be remodeled. (3) (n) windows and 2 (n) | $150,000 |
| Oct 21, 2015 | Completed final sign-off Apr 2018 | 1318 Cole St | Zecenas Construction | below garage addition of a 1 bedroom unit behind a partially below grade (e) garage. elec and plumb work will be part of the scope. the project will remove approx 438 cubic yards of soil. sprinkler work under separate permit.Details
below garage addition of a 1 bedroom unit behind a partially below grade (e) garage. elec and plumb work will be part of the scope. the project will remove approx 438 cubic yards of soil. sprinkler work under separate permit. | $325,000 |
| Oct 21, 2015 | Completed final sign-off Nov 2016 | 1677 Church St | Mc Cann Construction Company | 1st floor: residential and commercial unit space. a new foundation slab will be poured. the (e) storefront will be modified slightly and new transom windows will be added above. elect & plumb work will be part of the scope.Details
1st floor: residential and commercial unit space. a new foundation slab will be poured. the (e) storefront will be modified slightly and new transom windows will be added above. elect & plumb work will be part of the scope. | $230,000 |
| Sep 24, 2015 | Completed final sign-off Mar 2016 | 655 San Jose Av | F.B. Development | kitchen renovation. new elect, plumb in area. also new sub panel and grounded outlets in other additional areas. open wall between kitchen and porch. relocate laundry.Details
kitchen renovation. new elect, plumb in area. also new sub panel and grounded outlets in other additional areas. open wall between kitchen and porch. relocate laundry. | $45,000 |
| Aug 7, 2015 | Never finaled issued Jul 2016, no final | 4015 Folsom St | Dave Mason Building | remodel to (e) 1/f unit of a 2 unit residence. all work within (e) bldg. footprint. (n) slab will be poured along with replacement of portion of (e) foundation walls. (e) kitchen & bathroom will be rebuilt. all (e) windows will be replaced. (n) electrical, lighting, plumbing & hvac work.Details
remodel to (e) 1/f unit of a 2 unit residence. all work within (e) bldg. footprint. (n) slab will be poured along with replacement of portion of (e) foundation walls. (e) kitchen & bathroom will be rebuilt. all (e) windows will be replaced. (n) electrical, lighting, plumbing & hvac work. | $40,000 |
| Jul 13, 2015 | Completed final sign-off Nov 2016 | 3732 Fillmore St | Dwyer Construction Inc | revision to 201404213693. widen e opening in interior load bearing wall.Details
revision to 201404213693. widen e opening in interior load bearing wall. | $3,000 |
| May 28, 2015 | Completed final sign-off Jan 2018 | 175 Maynard St | unit legalization ordinance# 43-14. 1 bedroom, 1 bath, 1 kitchen. 1 hour corrider through garage. ceiling for fire seperation. enlarge window opening. replace lighting & add circuit to kitchen.legalize (e) living room, bedroom, ktchen and bathDetails
unit legalization ordinance# 43-14. 1 bedroom, 1 bath, 1 kitchen. 1 hour corrider through garage. ceiling for fire seperation. enlarge window opening. replace lighting & add circuit to kitchen.legalize (e) living room, bedroom, ktchen and bath | $20,300 | |
| Mar 31, 2015 | Expired or cancelled expired Oct 2019 | 1786 Golden Gate Av | 1st flr: remodel and addition to legalized studio unit to 2 bedroom unit. all work within footprint. revision to pa# 2014 11 12 1226Details
1st flr: remodel and addition to legalized studio unit to 2 bedroom unit. all work within footprint. revision to pa# 2014 11 12 1226 | $25,000 | |
| Mar 11, 2015 | Completed final sign-off Mar 2016 | 612 Arlington St | Bay Build Design Inc | new bathroom at grd floor. replace slab at ground flr. int grd flr and kitchen remodel. scope of work consists of r&r of (e) casework, flooring, elect and lighting. new opening on load bearing wall between kitchen & living room (n) posts at (n) opening at 1st & 2nd flrs. new foundation at grd flrDetails
new bathroom at grd floor. replace slab at ground flr. int grd flr and kitchen remodel. scope of work consists of r&r of (e) casework, flooring, elect and lighting. new opening on load bearing wall between kitchen & living room (n) posts at (n) opening at 1st & 2nd flrs. new foundation at grd flr | $95,000 |
| Feb 25, 2015 | Completed final sign-off Jan 2016 | 2330 40th Av | interior remodel of (e) kitchen & bathrooms @ 2nd floor. (e) load bearing partitions, interior, will be removed & (n) will be added. (e) back porch to be removed @ 1st floor. work will require electrical & plumbing. remove (e) porch roof at 1st floor rear.Details
interior remodel of (e) kitchen & bathrooms @ 2nd floor. (e) load bearing partitions, interior, will be removed & (n) will be added. (e) back porch to be removed @ 1st floor. work will require electrical & plumbing. remove (e) porch roof at 1st floor rear. | $65,000 | |
| Dec 1, 2014 | Completed final sign-off Nov 2016 | 3732 Fillmore St | revision to app#201404213693. add gas line with shut off valve to 2nd floor deck for gas grill. add motion detector security light under deck. n/a for the maher.Details
revision to app#201404213693. add gas line with shut off valve to 2nd floor deck for gas grill. add motion detector security light under deck. n/a for the maher. | $800 | |
| Jul 16, 2014 | Completed final sign-off Nov 2015 | 221 Christopher Dr | enclosed area below the second floor bay above at the rear per plan. adding a new family room, a new bedroom and a full bathroom on the first floor. 2 new sliding glass door added to the rear. new electrical and plumbing and hvac in the area of work.Details
enclosed area below the second floor bay above at the rear per plan. adding a new family room, a new bedroom and a full bathroom on the first floor. 2 new sliding glass door added to the rear. new electrical and plumbing and hvac in the area of work. | $85,000 | |
| May 16, 2014 | Completed final sign-off Nov 2016 | 3732 Fillmore St | (n) roof will be added at (e) lightwell. lightwell (e) windows will be removed and patched. (e) lightwell will be turned into a (n) laundry closet. lightwell filling up to 3rd floor only. compliance of maher ordinance not req.Details
(n) roof will be added at (e) lightwell. lightwell (e) windows will be removed and patched. (e) lightwell will be turned into a (n) laundry closet. lightwell filling up to 3rd floor only. compliance of maher ordinance not req. | $2,000 | |
| Apr 21, 2014 | Completed final sign-off Nov 2016 | 3732 Fillmore St | Dwyer Construction Inc | remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above.Details
remodel (e) kitchen, replace 2 exterior windows with (n) sliding door, (n) opening in load bearing wall to hallway, (n) deck in lightwell, electrical, plumbing in area of remodel, (n) posts and footings on g/f to support (n) opening above. | $45,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 605 Chenery St | A L Martin Construction | construct a non-load bearing partition dividing a room in a commercial tenant space. a new door will replace an (e) sliding door for access compliance. no change of use, area of occupancy. no change to exterior.Details
construct a non-load bearing partition dividing a room in a commercial tenant space. a new door will replace an (e) sliding door for access compliance. no change of use, area of occupancy. no change to exterior. | $5,000 |
| Jan 31, 2014 | Expired or cancelled cancelled Jan 2016 | 140 Taraval St | interior remodel of extg bathroom and extg kitchen. one non-load bearing wall will be removed, new finishes an fixtures installed. 2 extg windows facing side yards will be replaced. an extg interior stair will be refinished. new electrical and plmg in area of work. add (2) (n) solar tube skylightsDetails
interior remodel of extg bathroom and extg kitchen. one non-load bearing wall will be removed, new finishes an fixtures installed. 2 extg windows facing side yards will be replaced. an extg interior stair will be refinished. new electrical and plmg in area of work. add (2) (n) solar tube skylights | $40,000 | |
| Oct 24, 2013 | Completed final sign-off Mar 2014 | 1118 Hampshire St | Devlin/Mcnally Construction | interior remodel of 4 unit apartments bldg including :kitchens, baths, electrical and plumbing. extg utility porches to be converted to breakfast rooms with new openings in load bearing walls. partial structural strenthening with new shear walls.Details
interior remodel of 4 unit apartments bldg including :kitchens, baths, electrical and plumbing. extg utility porches to be converted to breakfast rooms with new openings in load bearing walls. partial structural strenthening with new shear walls. | $150,000 |
| Sep 23, 2013 | Completed final sign-off Nov 2014 | 70 Santa Paula Av | Quality Construction | interior remodel of an (e) bathroom. a non-loading wall will be moved, (e) finishes & fixtures installed. 1 (e) exterior window facing side yard will be remove. (n) electrical & (n) plumbing as required.Details
interior remodel of an (e) bathroom. a non-loading wall will be moved, (e) finishes & fixtures installed. 1 (e) exterior window facing side yard will be remove. (n) electrical & (n) plumbing as required. | $40,000 |
| Jun 14, 2013 | Expired or cancelled cancelled Jul 2014 | 3730 Fillmore St | interior remodel of an extg storage rm at ground flr of a 2 units residential condo bldg. the space will be converted t0 home office & full bath. including new finishes, electrical, lighting & plmbg. 1 exterior door will be replaced with a nw window of same width & a new door opening be in extr wallDetails
interior remodel of an extg storage rm at ground flr of a 2 units residential condo bldg. the space will be converted t0 home office & full bath. including new finishes, electrical, lighting & plmbg. 1 exterior door will be replaced with a nw window of same width & a new door opening be in extr wall | $14,000 | |
| Nov 30, 2012 | Never finaled issued Nov 2012, no final | 882 Chenery St | construct a new home office at the lower floor street level rear of an extg garage. new electrical in the area of work as required.Details
construct a new home office at the lower floor street level rear of an extg garage. new electrical in the area of work as required. | $6,200 | |
| Nov 1, 2012 | Completed final sign-off Mar 2013 | 605 Chenery St | A L Martin Construction | suite b:make a new opening in a non load bearing wall between 2 adjacent commercial space occupied by a single business. no change of use or occupancy. no change to exterior envelopeDetails
suite b:make a new opening in a non load bearing wall between 2 adjacent commercial space occupied by a single business. no change of use or occupancy. no change to exterior envelope | $7,000 |
| Sep 11, 2012 | Completed final sign-off Sep 2013 | 253 Mangels Av | (n) full bathroom into the rear of an (e) ground floor garage. an (e) unpermitted bedroom on the ground floor will be brought up to code and opened for inspection. 1 exterior window and 1 door will be replaced. (n) electrical, mech and plumbing in the area of work.Details
(n) full bathroom into the rear of an (e) ground floor garage. an (e) unpermitted bedroom on the ground floor will be brought up to code and opened for inspection. 1 exterior window and 1 door will be replaced. (n) electrical, mech and plumbing in the area of work. | $47,000 | |
| Jun 8, 2012 | Completed final sign-off Feb 2014 | 191 Chilton Av | project will include rear yard addition of 788 sf w/ a 413 sf flat roof. addition include a basement level bedroom & closet below a remodeled dining room, kitchen & bath. (n) elecrical & plumbing as required.Details
project will include rear yard addition of 788 sf w/ a 413 sf flat roof. addition include a basement level bedroom & closet below a remodeled dining room, kitchen & bath. (n) elecrical & plumbing as required. | $125,000 | |
| May 4, 2012 | Completed final sign-off Jul 2012 | 101 Harrison St | Devlin/Mcnally Construction | unit #119 - remove existing interior mezzanine guardrail at stair & replace with drywall & 1/2 tempered glass to exisitng structural metal posts at 42" high.Details
unit #119 - remove existing interior mezzanine guardrail at stair & replace with drywall & 1/2 tempered glass to exisitng structural metal posts at 42" high. | $4,000 |
| Jul 26, 2011 | Completed final sign-off Mar 2012 | 208 Surrey St | A L Martin Construction | interior remodel replacing stair from 1st to 2nd floor. add new bathroom to 2nd floor. new lighting, electrical and plmbg in area of remodel.Details
interior remodel replacing stair from 1st to 2nd floor. add new bathroom to 2nd floor. new lighting, electrical and plmbg in area of remodel. | $23,000 |
| Jun 16, 2011 | Never finaled issued Jun 2011, no final | 300 Gaven St | Peter Nestler Builder | renovation and access upgrades to an extg 1964 classroom serving a pre-school and kindergarten. improvements include:new ceiling, lighting, accessible doors, restroom access upgrades, and a new classroom kitchen. no structural or mechanical work. no new area added. same student count- no change-Details
renovation and access upgrades to an extg 1964 classroom serving a pre-school and kindergarten. improvements include:new ceiling, lighting, accessible doors, restroom access upgrades, and a new classroom kitchen. no structural or mechanical work. no new area added. same student count- no change- | $90,000 |
| Feb 18, 2011 | Completed final sign-off Sep 2012 | 356 Warren Dr | remodel & addition: rear yard addition of 2(n)bedrooms at 1/fl&enlarged family room & master bedroom at 2/fl. remodel 1(e) bath. add (n)rear yard deck at 2/fl level. electrical, plumbing & hvac in area of work.Details
remodel & addition: rear yard addition of 2(n)bedrooms at 1/fl&enlarged family room & master bedroom at 2/fl. remodel 1(e) bath. add (n)rear yard deck at 2/fl level. electrical, plumbing & hvac in area of work. | $120,000 | |
| Jan 10, 2011 | Completed final sign-off May 2011 | 4969 17th St | Devlin/Mcnally Construction | remodel of an (e) s.f.d. wood framed residence to include: (n) picture window @ 2nd level, enlarged deck to within 3'-3" of prop line @ 2nd level, (n) lighting & electrical @ 2nd & 3rd level, (n) non-struct walls @ 2nd level, replace metal balcony @ 3rd level in kind for structural purposes.Details
remodel of an (e) s.f.d. wood framed residence to include: (n) picture window @ 2nd level, enlarged deck to within 3'-3" of prop line @ 2nd level, (n) lighting & electrical @ 2nd & 3rd level, (n) non-struct walls @ 2nd level, replace metal balcony @ 3rd level in kind for structural purposes. | $65,000 |
| Sep 3, 2010 | Completed final sign-off Mar 2011 | 1054 Haight St | Devlin/Mcnally Construction | rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work.Details
rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work. | $125,000 |
| Aug 20, 2010 | Completed final sign-off May 2011 | 4969 17th St | Basic Modular Facilities Inc | interior remodel of (e) 3 level wood framed house including (n) stair from 1st level to 2nd level, widen (e) stair from 2nd level to 3rd level. infill (e) floor opening @ 3rd level with structural glass floor system, (n) lighting @ stair.Details
interior remodel of (e) 3 level wood framed house including (n) stair from 1st level to 2nd level, widen (e) stair from 2nd level to 3rd level. infill (e) floor opening @ 3rd level with structural glass floor system, (n) lighting @ stair. | $25,000 |
| May 19, 2010 | Expired or cancelled withdrawn Jan 2011 | 4969 17th St | Basic Modular Facilities Inc | raise dormer @ 3rd level master bedroom & relocate doors to (n) metal balcony. (n) picture window @ 2nd level kitchen. enlarged deck to within 3' of prop line @ 2nd level. new skylights & lighting at 3rd floor bedroom.Details
raise dormer @ 3rd level master bedroom & relocate doors to (n) metal balcony. (n) picture window @ 2nd level kitchen. enlarged deck to within 3' of prop line @ 2nd level. new skylights & lighting at 3rd floor bedroom. | $40,000 |
| May 11, 2010 | Never finaled issued May 2010, no final | 300 Gaven St | Bay Build Design Inc | interior renovation of an existing pre-school classroom including a new bathroom, lighting, ceiling grid & a new accessible doorDetails
interior renovation of an existing pre-school classroom including a new bathroom, lighting, ceiling grid & a new accessible door | $75,000 |
| Apr 22, 2010 | Completed final sign-off Jul 2010 | 391 Chenery St | Devlin/Mcnally Construction | new bedroom and full bath in (e) ground fl storage area, renovate (e) kitchen and bath at 2nd fl, renovate (e) utility rm into breakfast rm, new lighting, electrical and plbg, replace 3 (e) ext. window and 1 door at rear of 2nd flDetails
new bedroom and full bath in (e) ground fl storage area, renovate (e) kitchen and bath at 2nd fl, renovate (e) utility rm into breakfast rm, new lighting, electrical and plbg, replace 3 (e) ext. window and 1 door at rear of 2nd fl | $90,000 |
| Apr 20, 2010 | Completed final sign-off May 2012 | 185 Chilton Av | demolish (e) garage. new single level front yard addition with (n) roof deck over (n) master bedroom & (n) master bath, new elec & plumbing as required.Details
demolish (e) garage. new single level front yard addition with (n) roof deck over (n) master bedroom & (n) master bath, new elec & plumbing as required. | $175,000 | |
| Oct 14, 2009 | Expired or cancelled expired Sep 2017 | 4032 Folsom St | interior remodel of 2 story residence. ground floor work includes new bathroom, new plumbing, new lighting & electrical & foundation replacement. 2nd floor work includes remodel of (e) kitchen with new lighting & electrical as shown on plansDetails
interior remodel of 2 story residence. ground floor work includes new bathroom, new plumbing, new lighting & electrical & foundation replacement. 2nd floor work includes remodel of (e) kitchen with new lighting & electrical as shown on plans | $45,000 | |
| Feb 24, 2009 | Never finaled issued Feb 2009, no final | 855 Treat Av | Quality Construction | replace existing exterior sliding door w/ new doors & windows, replace steel industrial windows w/ n wood insul windows, add wall manted shading device over windows on s. facade, all work being done is to increase energy conservation of increase accessibility.Details
replace existing exterior sliding door w/ new doors & windows, replace steel industrial windows w/ n wood insul windows, add wall manted shading device over windows on s. facade, all work being done is to increase energy conservation of increase accessibility. | $14,000 |
| Feb 4, 2009 | Completed final sign-off Feb 2010 | 375 Valdez Av | Blair Burke General Contractors Inc | the project includes a partial interior remodel of ground floor of 2-story single family residence. new master bedroom/bath, guest bath, wine cellar, laundry, media room and office. partial foundation replacement, rebuild interior stair. replace in kind front entry stair. new electrical, lightingDetails
the project includes a partial interior remodel of ground floor of 2-story single family residence. new master bedroom/bath, guest bath, wine cellar, laundry, media room and office. partial foundation replacement, rebuild interior stair. replace in kind front entry stair. new electrical, lighting | $175,000 |
| Jan 8, 2009 | Never finaled filed Jan 2009, never issued | 3025 Castro St | vertical/horizontal addition: new 3rd level-3 bedrooms, 2 baths & laundry; remodel (e) 2nd level kitchen, living room & dining room; excavate(e) 1st level to 8'-0" clg height, build new den,game rm & bathrm; new stair circulation to all 3 levels; rebuild (e) rear yard deck,new hot tub,new skylight.Details
vertical/horizontal addition: new 3rd level-3 bedrooms, 2 baths & laundry; remodel (e) 2nd level kitchen, living room & dining room; excavate(e) 1st level to 8'-0" clg height, build new den,game rm & bathrm; new stair circulation to all 3 levels; rebuild (e) rear yard deck,new hot tub,new skylight. | $350,000 | |
| Nov 20, 2008 | Completed final sign-off Feb 2010 | 1246 11th Av | replace (e) exterior stair to rear yard with new enclosed stairs. build new 1/2 bathroom into (e) 2nd floor sunroom.Details
replace (e) exterior stair to rear yard with new enclosed stairs. build new 1/2 bathroom into (e) 2nd floor sunroom. | $35,000 | |
| Aug 18, 2008 | Expired or cancelled cancelled Jan 2020 | 542 Ulloa St | new 2 level rear addition of for interior stair with new doors to rear yard. ground floor buildout for new master suite, den, bath, laundry. 2nd floor kitchen and bath remodel including lighting, hvac, plumbing. infill 2 windows at kitchen,replace driveway in kind.new windows and door at ground flDetails
new 2 level rear addition of for interior stair with new doors to rear yard. ground floor buildout for new master suite, den, bath, laundry. 2nd floor kitchen and bath remodel including lighting, hvac, plumbing. infill 2 windows at kitchen,replace driveway in kind.new windows and door at ground fl | $175,000 | |
| Aug 6, 2008 | Expired or cancelled cancelled Apr 2009 | 850 Montgomery St | construct new glass curtain wall at 3 levels along (e) exterior walkway/balcony for noise control pruposesDetails
construct new glass curtain wall at 3 levels along (e) exterior walkway/balcony for noise control pruposes | $65,000 | |
| Mar 12, 2008 | Expired or cancelled withdrawn Jul 2008 | 395 Collingwood St | rev to pa# 2007/12/05/9716 to install 2 pair of new french doors, new window, relocate bathroom and convert ex. storage into habitable space on the ground floor. construct new wood deck, new door at kitchen and replace bay window in kitchen with new flush windowDetails
rev to pa# 2007/12/05/9716 to install 2 pair of new french doors, new window, relocate bathroom and convert ex. storage into habitable space on the ground floor. construct new wood deck, new door at kitchen and replace bay window in kitchen with new flush window | $30,000 | |
| Feb 15, 2008 | Expired or cancelled expired Mar 2014 | 453 Anderson St | two story rear yard addition and 3rd level dormer extension. new elevated wood deck at rear yard (@ <10'-0" above grade). remodel interior space (kitchen & bath) in remainder of residence. new family room at first level. no change to front facade.Details
two story rear yard addition and 3rd level dormer extension. new elevated wood deck at rear yard (@ <10'-0" above grade). remodel interior space (kitchen & bath) in remainder of residence. new family room at first level. no change to front facade. | $125,000 | |
| Oct 4, 2007 | Completed final sign-off Nov 2007 | 158 15th Av | replacement of (e) rear yard stair to the ground from the 3rd fl. (n) stairs width will be 1'6" wider. (n) 4" concrete slab @ ground level in area of work. matrial to be pt.wd. no change in configuration.Details
replacement of (e) rear yard stair to the ground from the 3rd fl. (n) stairs width will be 1'6" wider. (n) 4" concrete slab @ ground level in area of work. matrial to be pt.wd. no change in configuration. | $8,000 | |
| Sep 25, 2007 | Completed final sign-off Nov 2007 | 95 Denslowe Dr | addition on a beam to replace an interior load-bearing partition.Details
addition on a beam to replace an interior load-bearing partition. | $2,000 | |
| Sep 25, 2007 | Completed final sign-off Feb 2008 | 76 Oakwood St | interior kitchen remodel including lighting and electrical. replace 2 (e) windows, add 1 new window.not visable from street.Details
interior kitchen remodel including lighting and electrical. replace 2 (e) windows, add 1 new window.not visable from street. | $38,000 | |
| Aug 2, 2007 | Expired or cancelled expired May 2008 | 257 Randall St | work on #257 randall st. "in kind "replacement of garage roof deck in cluding dryrot repair of railing, remove and replace roof membrane and apply new brick paver deck. connect roof drain to sewer.Details
work on #257 randall st. "in kind "replacement of garage roof deck in cluding dryrot repair of railing, remove and replace roof membrane and apply new brick paver deck. connect roof drain to sewer. | $20,000 | |
| Jul 30, 2007 | Completed final sign-off Jul 2008 | 311 Townsend St | t.i. for retail bike shop and bicycle parking. include upgrade ada bathroom on existing rough in plumbing . see p/a# 2006092735031.Details
t.i. for retail bike shop and bicycle parking. include upgrade ada bathroom on existing rough in plumbing . see p/a# 2006092735031. | $20,000 | |
| Jul 10, 2007 | Completed final sign-off Sep 2007 | 1254 Plymouth Av | revision to appl#200705100919, revision to existing permit, modify rear wall @ ground level to include approx. 3' passageway & stairs, all conc. (n) floor drain, tie to (e) sewer @ front of residence.Details
revision to appl#200705100919, revision to existing permit, modify rear wall @ ground level to include approx. 3' passageway & stairs, all conc. (n) floor drain, tie to (e) sewer @ front of residence. | $12,000 | |
| May 10, 2007 | Completed final sign-off Sep 2007 | 1254 Plymouth Av | foundation replacement of ground floor. build out garage rear into bedroom, bath, and laundry. new lighting, electrical, and plumbing in area of work. no work on 2nd floorDetails
foundation replacement of ground floor. build out garage rear into bedroom, bath, and laundry. new lighting, electrical, and plumbing in area of work. no work on 2nd floor | $35,000 | |
| Mar 22, 2007 | Completed final sign-off May 2007 | 2820 Polk St | remodel (e) utility room into a new full bathroom. new eletrical, lighting, plumbing-2nd floor, lower unit.Details
remodel (e) utility room into a new full bathroom. new eletrical, lighting, plumbing-2nd floor, lower unit. | $9,000 | |
| Mar 22, 2007 | Completed final sign-off Oct 2007 | 95 Denslowe Dr | Vista Knoll Construction | remodel of (e) kitchen, breakfast room. remove non-bearing wall between. new electrical, lighting, plumbing.Details
remodel of (e) kitchen, breakfast room. remove non-bearing wall between. new electrical, lighting, plumbing. | $30,000 |
| Jan 18, 2007 | Expired or cancelled expired Sep 2012 | 850 Montgomery St | revise occupancy signage based on current occupancy loads and exiting. permit to establish occupancy load only. no construction work under this permit.Details
revise occupancy signage based on current occupancy loads and exiting. permit to establish occupancy load only. no construction work under this permit. | $1,000 | |
| Dec 6, 2006 | Completed final sign-off Dec 2006 | 615 Cayuga Av | proposed changes to 200604179150. deletion of man-door to street at garage, move interior closet to exterior wall,move shower and verify min garage dimensionDetails
proposed changes to 200604179150. deletion of man-door to street at garage, move interior closet to exterior wall,move shower and verify min garage dimension | $1,000 | |
| Sep 29, 2006 | Completed final sign-off Feb 2007 | 34 Elsie St | add new exterior stair and deck, stair at 2/f does not extend past allowable 25% rear setback. lower deck is less than 30" above grade.Details
add new exterior stair and deck, stair at 2/f does not extend past allowable 25% rear setback. lower deck is less than 30" above grade. | $18,000 | |
| Sep 14, 2006 | Completed final sign-off Dec 2006 | 615 Cayuga Av | construct level wood framed platform in (e) garage rear to provide floor for remodeled rooms. see permit 200604179150 for previiously approved construction of interior remodel.Details
construct level wood framed platform in (e) garage rear to provide floor for remodeled rooms. see permit 200604179150 for previiously approved construction of interior remodel. | $7,600 | |
| Aug 29, 2006 | Completed final sign-off Mar 2007 | 490 Molimo Dr | replace legal 1 story rear yard deck with 2 story deck.Details
replace legal 1 story rear yard deck with 2 story deck. | $40,000 | |
| Apr 17, 2006 | Completed final sign-off Dec 2006 | 615 Cayuga Av | renovation of existing ground floor garage into bedroom, bath & living space. construct 1 hour fire rated partion to garage. maintain existing off-street parking.Details
renovation of existing ground floor garage into bedroom, bath & living space. construct 1 hour fire rated partion to garage. maintain existing off-street parking. | $35,000 | |
| Aug 22, 2005 | Completed final sign-off Nov 2006 | 776 Junipero Serra Bl | remodel of existing kitchen including electrical, lighting and plumbing, addition 56 sq. ft. to breakfast room.Details
remodel of existing kitchen including electrical, lighting and plumbing, addition 56 sq. ft. to breakfast room. | $40,000 | |
| Nov 15, 2004 | Completed final sign-off Jul 2005 | 3861 26th St | demolition and "in kind" replacement of (e) exterior exit stair to rear yard. replacement of exterioDetails
demolition and "in kind" replacement of (e) exterior exit stair to rear yard. replacement of exterio | $15,000 | |
| Jul 7, 2004 | Completed final sign-off Jul 2005 | 2555 15th Av | Wei Guo Construction | deck addition with stair, replace 1 window oening with a door to deck.Details