Building Construction Express
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Sep 2026
- Last 24 months
- 13 permits filed
41 permits since 2000: 27 completed, 6 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 144 Locksley Av | unit #1: build a wall to separate a bedroom out of the long living room. add a tankless water heater. rmeove two small 2' closets (back to back).Details
unit #1: build a wall to separate a bedroom out of the long living room. add a tankless water heater. rmeove two small 2' closets (back to back). | $5,000 |
| Jun 25, 2026 | In progress issued Jun 2026 | 149 Talbert St | upgrade electrical service to 200 amp, relocate furnace & laundry. add a bedroom, a media room, a gym room, a bathroom & kitchenette on 1st floor. no structural alterations.Details
upgrade electrical service to 200 amp, relocate furnace & laundry. add a bedroom, a media room, a gym room, a bathroom & kitchenette on 1st floor. no structural alterations. | $60,000 |
| Jun 9, 2026 | In progress issued Aug 2026 | 2526 03rd St | 2526 3rd st- ground floor to remove (e) angled storedoor and lower (e) concret landing to conform to code required slope. install (n) store front door. construct (n) landing interior side of door and slopoed walk up to finish floor not exceeding 5.0% slopeDetails
2526 3rd st- ground floor to remove (e) angled storedoor and lower (e) concret landing to conform to code required slope. install (n) store front door. construct (n) landing interior side of door and slopoed walk up to finish floor not exceeding 5.0% slope | $5,000 |
| May 7, 2026 | In progress issued Jul 2026 | 40 Ceres St | comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f.Details
comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f. | $45,000 |
| Nov 3, 2025 | Completed final sign-off Mar 2026 | 2150 Ulloa St | kitchen remodel in kind. remove and replace existing cabinets and sheetrock. rewire and add lights and switches in kitchen. add waterline for refrigerator. replace floor tiles.Details
kitchen remodel in kind. remove and replace existing cabinets and sheetrock. rewire and add lights and switches in kitchen. add waterline for refrigerator. replace floor tiles. | $30,000 |
| Sep 24, 2025 | Completed final sign-off Nov 2025 | 37 Miraloma Dr | moving toilet to opposite wall on drawing replacing tub. making single vanity a double vanityDetails
moving toilet to opposite wall on drawing replacing tub. making single vanity a double vanity | $25,000 |
| Sep 17, 2025 | In progress issued Dec 2025 | 755 Monterey Bl | fix & repair areas of fire escape. hatch to be 24" x 48" w/rail and chain. remove unpermitted work item #2 complaint #202542024. change doors at second and 3rd floor w/ 1hr rating w/closer where required.Details
fix & repair areas of fire escape. hatch to be 24" x 48" w/rail and chain. remove unpermitted work item #2 complaint #202542024. change doors at second and 3rd floor w/ 1hr rating w/closer where required. | $300 |
| Sep 8, 2025 | Completed final sign-off Aug 2026 | 117 Vasquez Av | remodel kitchen & dining room for open concept at 2/f. propose four new skylights. two new windows on east exterior wallDetails
remodel kitchen & dining room for open concept at 2/f. propose four new skylights. two new windows on east exterior wall | $50,000 |
| Jun 27, 2025 | Completed final sign-off Jul 2025 | 123 Grattan St | revision to permit # 202504073840. kitchen and bathroom remodeling. replace new toilet, vanity, lights, and shower door at bathroom. replace new countertops and cabinets in kitchen. hood up appliances. replace damage entrance door for unit interior not exterior.Details
revision to permit # 202504073840. kitchen and bathroom remodeling. replace new toilet, vanity, lights, and shower door at bathroom. replace new countertops and cabinets in kitchen. hood up appliances. replace damage entrance door for unit interior not exterior. | $30,000 |
| Jun 24, 2025 | Completed final sign-off Feb 2026 | 144 Locksley Av | 2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 officeDetails
2nd fl - to relocate (e) kitchen to living room; demo (e) fireplace; add half bathroom; add 1 office | $40,000 |
| Apr 18, 2025 | In progress issued Apr 2025 | 1277 Cayuga Av | stucco repair on front and street side (2 sides) around windows, approx. 120 sq ft, painting after stucco repair.Details
stucco repair on front and street side (2 sides) around windows, approx. 120 sq ft, painting after stucco repair. | $6,000 |
| Apr 7, 2025 | Completed final sign-off Jul 2025 | 123 Grattan St | replace (n) tiles on kitchen and bathroom. refinish hardwood flooring touch up and painting the unit. interior only. kitchen & bathroom remodel tile onlyDetails
replace (n) tiles on kitchen and bathroom. refinish hardwood flooring touch up and painting the unit. interior only. kitchen & bathroom remodel tile only | $10,000 |
| Mar 6, 2025 | Completed final sign-off Jul 2026 | 622 19th Av | structural revision to pa # 202306129774: provide underpinning for the foundation along gridline "4". legalize retaining wall to maintain grade.Details
structural revision to pa # 202306129774: provide underpinning for the foundation along gridline "4". legalize retaining wall to maintain grade. | $8,000 |
| Oct 26, 2023 | Completed final sign-off Sep 2026 | 622 19th Av | remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f.Details
remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f. | $150,000 |
| Aug 17, 2023 | Completed final sign-off Jun 2025 | 233 Lincoln Wy | interior remodeling to build a new 1-bedroom unit at 1st flr. (legal unit under density), new unit to include new kitchen, living and closets and laundry closet.Details
interior remodeling to build a new 1-bedroom unit at 1st flr. (legal unit under density), new unit to include new kitchen, living and closets and laundry closet. | $60,000 |
| Jun 26, 2023 | Never finaled issued Jun 2023, no final | 408 Wilde Av | some siding repair in front of house. scaffolding needed in front of the house. painting in the front of the house. ~20 sqft repairDetails
some siding repair in front of house. scaffolding needed in front of the house. painting in the front of the house. ~20 sqft repair | $5,000 |
| Jan 10, 2022 | Never finaled issued Jan 2022, no final | 625 Girard St | install plywood to secure the house front and back. to comply with complaint #202174746. temporary.Details
install plywood to secure the house front and back. to comply with complaint #202174746. temporary. | $1,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 2278 42nd Av | per inspector request to add $80,000 to job cost. re bpa# 201911228012Details
per inspector request to add $80,000 to job cost. re bpa# 201911228012 | $80,000 |
| Nov 30, 2021 | Completed final sign-off Jun 2022 | 575 Hamilton St | add (1) gym room, (1) office, (2) bath, (1) family room, (1) media room, (1) storage on ground floor. remove interior staircase.Details
add (1) gym room, (1) office, (2) bath, (1) family room, (1) media room, (1) storage on ground floor. remove interior staircase. | $50,000 |
| Jul 22, 2021 | Completed final sign-off Aug 2021 | 1701 44th Av | revised stated area & scope of work for renovation completed under pa# 202011098548. mofify (e) ground level storage space, convert 498sf of unconditioned space to conditioned living space, move (e) bathrm & laundry. 2 new bedrm w/closet, family rm. replace (e) bathrm windows, door voluntary seismicDetails
revised stated area & scope of work for renovation completed under pa# 202011098548. mofify (e) ground level storage space, convert 498sf of unconditioned space to conditioned living space, move (e) bathrm & laundry. 2 new bedrm w/closet, family rm. replace (e) bathrm windows, door voluntary seismic | |
| Nov 9, 2020 | Completed final sign-off Aug 2021 | 1701 44th Av | renovation of residential ground floor. relocate (e) bathroom & laundry room. replace (e) level 1 windows. replace swing door with sliding patio door. voluntary seismic work.Details
renovation of residential ground floor. relocate (e) bathroom & laundry room. replace (e) level 1 windows. replace swing door with sliding patio door. voluntary seismic work. | $40,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 635 45th Av | replace tile on kitchen and guest bathroom. replace countertop on kitchen in kind.Details
replace tile on kitchen and guest bathroom. replace countertop on kitchen in kind. | $7,000 |
| Nov 22, 2019 | Completed final sign-off Apr 2023 | 2278 42nd Av | rear addition & remodel of (e) single family home. to comply w/ nov #201891701, nov #201244161, nov #201044743, nov #201796732Details
rear addition & remodel of (e) single family home. to comply w/ nov #201891701, nov #201244161, nov #201044743, nov #201796732 | $75,000 |
| Nov 22, 2019 | Completed final sign-off Apr 2023 | 2278 42nd Av | (n) accessory dwelling unit to (e) single family home. to comply w/ nov #201891701, nov #201244161, nov #201044743, nov #201796732. per ord #95-17Details
(n) accessory dwelling unit to (e) single family home. to comply w/ nov #201891701, nov #201244161, nov #201044743, nov #201796732. per ord #95-17 | $75,000 |
| Jul 30, 2019 | Completed final sign-off Jun 2020 | 1614 La Playa | add 1 guest room, 1 media room, 1 bathroom, 1 hallway on 1/f per plans. kitchen remodel on 2/f, add 1 bathroom, reconfigure (e) bathroom on 2/f.Details
add 1 guest room, 1 media room, 1 bathroom, 1 hallway on 1/f per plans. kitchen remodel on 2/f, add 1 bathroom, reconfigure (e) bathroom on 2/f. | $20,000 |
| Jul 17, 2019 | Completed final sign-off Aug 2020 | 2746 Cabrillo St | replace foundationDetails
replace foundation | $25,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2019 | 240 Magellan Av | interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of workDetails
interior addtion of storage room and laundry @ ground fl. (n) enlarged opening in (e) load-bearing wall between kitchen and family room; replace 2 windos and add 1 (n) patio door in place of window at 2nd fl rear. remodel (e) kitchen and 1/2 bath @ 2nd fl. hvac, elec and lighting in area of work | $48,000 |
| Mar 29, 2019 | Completed final sign-off Aug 2020 | 2746 Cabrillo St | interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood)Details
interior remodel 1st flr and 2nd flr. with 3 full bathrooms one powder room, kitchen & 3 bedrooms. replace all windows (fiberglass wood) | $120,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rearDetails
revision to pa 201806010823. reconfigure rooms per plans. new wine storage at kitchen. remove stairs from deck at rear | |
| Sep 27, 2018 | Never finaled issued Nov 2018, no final | 601 35th Av | construct 2 (n) family room & 2 (n) 1/2 bath room at ground floor. 2nd fl - remodel (e) kitchen and (e) bathroom. (n) bathroom, remove partial partition wall. no work on 3rd floor or at front facadeDetails
construct 2 (n) family room & 2 (n) 1/2 bath room at ground floor. 2nd fl - remodel (e) kitchen and (e) bathroom. (n) bathroom, remove partial partition wall. no work on 3rd floor or at front facade | $70,000 |
| Jul 10, 2018 | Completed final sign-off Oct 2020 | 225 Grafton Av | comply with compliant# 201870851,201870941 & 201870821. unit legaliztion of unit installed w/o permit per ord# 43-14. legalize kitchen, bed rm, full bath and family rm. all work @ grd flr.Details
comply with compliant# 201870851,201870941 & 201870821. unit legaliztion of unit installed w/o permit per ord# 43-14. legalize kitchen, bed rm, full bath and family rm. all work @ grd flr. | $42,000 |
| Jun 1, 2018 | Completed final sign-off Dec 2020 | 130 09th Av | 1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndwsDetails
1st fl: add family rm, 1 bdrm, 1 full, one 1/2 bath. new elevator to all 3 floor. 2nd fl:remodel kitchen,bath,reconfigure space. new deck rear. 3rd fl rmdl kitchen bath, add 1 full bath, cantilever deck at rear. new roof deck and replace front windows in kind alum clad wood wndws | $100,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 2434 Geary Bl | apply new siding on both neighbor side wall, scaffolding set up on both neighbor side. maher n/aDetails
apply new siding on both neighbor side wall, scaffolding set up on both neighbor side. maher n/a | $10,000 |
| Mar 2, 2018 | Completed final sign-off Jul 2018 | 1686 Great Hy | fix leaking lightwell on second floor, reframe slope for drain, apply new water proofinf for lightwell, replace water heater.Details
fix leaking lightwell on second floor, reframe slope for drain, apply new water proofinf for lightwell, replace water heater. | $12,000 |
| Jan 11, 2018 | Completed final sign-off Jul 2018 | 560 Arch St | construct (n) bathroom at ground floor, exhaust fanDetails
construct (n) bathroom at ground floor, exhaust fan | $7,000 |
| Jan 4, 2018 | Expired or cancelled expired Dec 2024 | 82 Mill St | construct two bedrooms, two full bathrooms at ground floor. construct new deck at rear of bldg w/staircase (size approx 16'x15').Details
construct two bedrooms, two full bathrooms at ground floor. construct new deck at rear of bldg w/staircase (size approx 16'x15'). | $60,000 |
| Aug 14, 2017 | Completed final sign-off Oct 2017 | 1491 26th Av | replace tile of basement bathroom to comply with #201797711. no wall changes.Details
replace tile of basement bathroom to comply with #201797711. no wall changes. | $3,000 |
| Jun 15, 2017 | Expired or cancelled suspend Jan 2018 | 716 Kearny St | ground floor ti: add a tea bar in an (e) restaurant in dining area maher naDetails
ground floor ti: add a tea bar in an (e) restaurant in dining area maher na | $10,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 1978 48th Av | 1st floor: add 1 bedroom & 1 full bath. 2nd floor : remodel bath & kitchen.Details
1st floor: add 1 bedroom & 1 full bath. 2nd floor : remodel bath & kitchen. | $40,000 |
| Nov 10, 2016 | Completed final sign-off Jul 2017 | 490 Vermont St | 1)relocated kitchen and dining, remodel bath and add one bedroom and bath at 2nd floor. 2)add 2 bedrooms, 2 baths, family room and relocated washer and dryer at 1st floor per plan. n/a for maher.Details
1)relocated kitchen and dining, remodel bath and add one bedroom and bath at 2nd floor. 2)add 2 bedrooms, 2 baths, family room and relocated washer and dryer at 1st floor per plan. n/a for maher. | $89,700 |
| Oct 27, 2016 | Never finaled issued Oct 2017, no final | 2826 Gough St | rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f.Details
rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f. | $60,000 |